Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997 (b215405e-1e90-4b21-837b-f227a5480b5d)

    By Greenwood AG

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include

    Jan 1, 1998

  • AUSIMM
    The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, Newcastle

    By Martin C. H, Met B

    INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc

    Jan 1, 1946

  • AUSIMM
    An Attempt to Delineate the Spatial Limits of A Hydrocarbon Reservoir by Thermal IR Remote Sensing Mission - A Case Study from Cambay Basin, Gujerat, India

    The calibrated thermal IR data of part of Cambay Basin is used to determine surface temperatures and to detect the heat flow. Applying the conductive heat flow continuation technique, the three d

    Jan 1, 1986

  • AUSIMM
    On-Stream Analysis of Iron Ore and Its Potential for Improving Export Quality Control

    An on-stream iron ore analyser has been developed in collaborationwith Hamersley Iron Pty. Limited for determining the iron content ofboth lump (- 30+ 6 mm particle size) and fines ( - 6 mm particle s

    Jan 1, 1988

  • AUSIMM
    The Foreland Thrust Belt of Papua New Guinea

    By Finlayson E, Hilyard D, Francis G

    Papua New Guinea's mainland is dominated by a foreland thrust belt, which can be divided into two zones. The "body" zone is floored by Palaeozoic granites and metamorphics of the Fly Platform

    Jan 1, 1987

  • AUSIMM
    Real-Time Data Acquisition and Control Projects at the UDC Research and Development Laboratory

    By Fiedler VA, Threadingham GM, Leckenby DF, Clarkson CJ

    The Utah Development Company Research and Development Laboratory has embarked upon a programme of optimisation of the company's coal preparation plants. This goal is being accomplished in a t

    Jan 1, 1983

  • AUSIMM
    A Flotation Study for Effective Separation of the Heavy Mineral Sands

    By Takiuchi T, Kurita M, Owada S

    This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally

    Jan 1, 1993

  • AUSIMM
    Granite Related Copper-Gold Mineralisation in the Southern Mt Read Volcanics, Western Tasmania, Australia

    By Cooke D, Large R

    The Cambrian structure in the Mt Read Volcanics was produced by four deformational events: obduction of forearc-derived mafic/ultramalic complexes in the early Middle Cambrian, a middle Middle Cambr

    Jan 1, 1997

  • AUSIMM
    Reply to Dinner Address

    I am honoured and very pleased to have been given the opportunity this evening to say a few words of thanks not only on behalf of all the guests but especially for the delegates and accompanying p

    Jan 1, 1986

  • AUSIMM
    Yallourn North Extension Open Cut Interim Rehabilitation

    By Pilkington T, Noy A

    The Yallourn North Extension (YNX) open cut mine ceased mining operations in early 1989. YNX may be used again for coal supply at the discretion of the Coal Corporation Of Victoria (CCV); this has res

    Jan 1, 1992

  • AUSIMM
    Retreatment/Flotation Rationalisation at Renison

    Revised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap

    Jan 1, 1991

  • AUSIMM
    Cratering Theory Evolves into New Underground Mining Technique

    The introduction of large diameter holes to underground mining has provided the first opportunity to apply near spherical charges in production scale blasts instead of the convent- ional long cylind

    Jan 1, 1978

  • AUSIMM
    Application of Vertical Centrifugal Screen (V3 Separator) in Two-stage, Closed-Circuit Crushing System (CPC Process)

    In sizing of wet coal by the horizontal vibrating screen, screen openings to be used is much restricted, because coal is sticky and its bulk density is little. The electrically heated screen and o

    Jan 1, 1984

  • AUSIMM
    Effects of Subsidence on Steeptopography and Cliff Lines

    By Carter J. P

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Resear

    Jan 1, 1992

  • AUSIMM
    Experiences in Applying Computers for On-Stream X-Ray Analyzing and Development of Automation in Mineral Flotation Processes

    By Tarvainen M, Mattila O

    Outokumpu Oy has systematically developed the automation of mineral flotation covering the technology of both new devices and control methods, and as a practical result of this effort currently pr

    Jan 1, 1977

  • AUSIMM
    Urban Geology and its Relationship to Intraplate Earthquake Risk - Lessons from the 1989 Newcastle Experience

    For the past five years the University of Queenslandhas, through its various workshops, been preaching to Australia that there was a potentially hazardous situation from earthquakes for urban Australi

    Jan 1, 1990

  • AUSIMM
    Thermodynamic Studies of Liquid Iron Alloys by a Mass Spectrometer Equpped with a Newly Developed Ion Current Measuring System

    By Yamada K, Abe H

    Magnetic scanning type mass spectrometers have been given improved sensitivity with a large dynamic range and considerable resolution by the addition of a computer-controlled electric equipment. A

    Jan 1, 1980

  • AUSIMM
    Water Issues in DOZ Block Cave Mine, PT Freeport Indonesia

    By E Widijanto, A Srikant

    PT Freeport Indonesia operates a copper-gold mine located in the remote highlands of Papua, Indonesia, about 3500 km east of Jakarta. Currently, the district produces about 240 000 tonnes per day (tpd

    Jan 1, 2006

  • AUSIMM
    Ground Control Procedures in Western Australian Underground Mines - a Critical Review

    A review of ground control procedures in Western Australian underground mines is presented. Geotechnical input into initial mine design and methods of ground control is rare. As a result, the frequenc

    Jan 1, 1992

  • AUSIMM
    Studies on Active Gold Mineralisation in the Waiotapu Geothermal System, New Zealand

    Gold is actively precipitating at grades up to 80 g/tonne at and near the surface of the Waiotapu geothermal system, located in the Taupo Volcanic Zone of New Zealand. Many characteristics of this act

    Jan 1, 1984