Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How to select appropriate instrumentation to safeguard TSFs against credible failure modes

    By P J. Chapman

    Recent catastrophic failures of tailings storage facilities (TSFs) continue to highlight the need for a detailed understanding of failure modes and the defences that are in place within the design to

    Jul 1, 2021

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    The Evolution of Diamond Drilling Practices at Olympic Dam

    By J Taylor, A Dubowik

    To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a

    Aug 18, 2014

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    The Geometry and Petrography of Stockwork Vein Swarms, Macraes Mine, Otago Schist, New Zealand

    By D Craw

    The Macraes gold deposit is located in a low angle NE dipping (~15¦) shear zone, the Hyde Macraes Shear Zone (HMSZ) cutting greenschist facies metasediments of the Otago Schist. The shear zone is host

    Jan 1, 2004

  • AUSIMM
    A generalised form of Gy’s equation for gold ores – empirical evidence

    By R C. A Minnitt

    The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the fundamental sampling error (FSE), the duplicate sampling analysis (DSA) and the segregation fractionalised

    May 9, 2017

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Transcending the Mining Discipline Divide – Multidisciplinary, Interdisciplinary or Transdisciplinary?

    By J Coombes

    "In today’s challenging climate of reduced staffing, limited funding and uncertain markets, we are called on to operate more productively and ‘be more innovative’. As an industry, we are quick to iden

    Mar 8, 2016

  • AUSIMM
    Recent Advances in Geophysical Tools

    This paper reviews recent advances in geophysical tools for mineral exploration. It does not restrict comments to methods which are usually applied in the tectonically active belt surrounding the Paci

    Jan 1, 2004

  • AUSIMM
    Ancient to modern ironmaking – examining the effect on the behaviour of phosphorus and other impurities in iron ore by doping with calcium oxalate (CaC2O4.H2O)

    By M I. Pownceby, S Hapugoda, H Han, V Nunna, L Lu

    Charcoal produced from Syzygium Zeylanicum (local name: Yakada Maran = iron killer) trees were widely used in ancient Sri Lankan iron smelting practices. In this study, relict charcoal from Syzygium Z

    Nov 8, 2021

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Operating Performance of the Phu Kham IsaMill™

    By G Harbort, D Zoetbrood

    "The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit

    Oct 10, 2016

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levels

    By H J. J Boshoff

    Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a

    Jul 25, 2018

  • AUSIMM
    Tech Services - It's a Blast

    Two years ago I was sitting in a big lecture theatre at the School of Mines in Kalgoorlie at the annual New LeadersÆ Conference listening to a guy tell us all how much he loved his job, travelling the

    Jan 1, 2008