Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Multi-phase CFD modelling of spiral concentrator – Prediction of particle segregation and separation performance

    By R M. Yanamandra, M Kumar, S K. Tripathy, N Mangadoddy, P Sudikondala

    Spiral concentrators are one of the flowing film gravity concentration devices used to beneficiate coal and mineral ores. The aim of the current study is to understand the particulate flow and separat

    Aug 24, 2022

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Metallurgical QA/QC – who needs it? The Olympic Dam experience

    By K Ehrig, V Liebezeit, E Macmillan

    The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T

    Sep 11, 2017

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Pyrite depression at Boliden Tara using F-250 – a biopolymer

    By Y Peng, C Burns, Y Mu, R A. Lauten

    In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a

    Aug 29, 2018

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?

    By C W. Davis

    Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red

    Mar 15, 2021

  • AUSIMM
    Evaluation of sustainability of copper production value chain from ore to metal using advanced simulation

    By A Remes, A Dennis, M Talikka, T Kotiranta, S Horn

    A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan

    Jul 25, 2018

  • AUSIMM
    Exploring Optimised Delay Timing for Fragmentation

    By C K. McKenzie

    As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened

    Nov 8, 2011

  • AUSIMM
    Thin spray liners for face support at Kanmantoo

    By B Roache

    Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers

    Mar 29, 2023

  • AUSIMM
    Phosphorus distribution behaviour in hematite ore reduced in CO-H2 gaseous atmosphere

    By E K. Chiw, S-M Jung, S M. Masuka, ika

    The world reserves of high-grade iron ore have depleted necessitating the need to utilise any existing natural iron ore deposits to meet the demands of the world’s expanding economy using hydrogen in

    Sep 18, 2023