Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Multi-phase CFD modelling of spiral concentrator – Prediction of particle segregation and separation performanceBy R M. Yanamandra, M Kumar, S K. Tripathy, N Mangadoddy, P Sudikondala
Spiral concentrators are one of the flowing film gravity concentration devices used to beneficiate coal and mineral ores. The aim of the current study is to understand the particulate flow and separat
Aug 24, 2022
-
Improving compliance in mining through an effective geoscientific information management frameworkBy S Mundell, A Atkins, S van de Water
Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ
Nov 8, 2021
-
The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction ConsiderationsBy S Goff
The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the
Mar 8, 2011
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
The Influence of Geology on Blasting Hazards and ResultsBy T N. Little
The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini
Aug 22, 2011
-
Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USABy S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick
Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir
Nov 4, 2015
-
Metallurgical QA/QC – who needs it? The Olympic Dam experienceBy K Ehrig, V Liebezeit, E Macmillan
The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T
Sep 11, 2017
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
Geometallurgical Modelling of the Dumont DepositBy M Sciortino, J Korczak, J Muinonen, A St-Jean
The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir
Sep 29, 2013
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
Pyrite depression at Boliden Tara using F-250 – a biopolymerBy Y Peng, C Burns, Y Mu, R A. Lauten
In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a
Aug 29, 2018
-
Observations on the Behaviour of a Gold Tailings with Hypersaline Pore FluidBy D Reid
Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to
Jul 27, 2015
-
Correlated Valuation MethodologyBy E C. Holloway
"The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both
Mar 8, 2016
-
Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?By C W. Davis
Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red
Mar 15, 2021
-
Evaluation of sustainability of copper production value chain from ore to metal using advanced simulationBy A Remes, A Dennis, M Talikka, T Kotiranta, S Horn
A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan
Jul 25, 2018
-
Exploring Optimised Delay Timing for FragmentationBy C K. McKenzie
As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened
Nov 8, 2011
-
Thin spray liners for face support at KanmantooBy B Roache
Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers
Mar 29, 2023
-
Phosphorus distribution behaviour in hematite ore reduced in CO-H2 gaseous atmosphereBy E K. Chiw, S-M Jung, S M. Masuka, ika
The world reserves of high-grade iron ore have depleted necessitating the need to utilise any existing natural iron ore deposits to meet the demands of the world’s expanding economy using hydrogen in
Sep 18, 2023