Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming ConditionsBy Y Li, Z Fu, D J. Williams, E Topal
Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface
Jul 27, 2015
-
Internalising Ecological Costs in Evaluating and Planning a Mining ProjectBy Q Wang
Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co
Sep 26, 2011
-
Applications of Ceramic Wear Materials in the Gold IndustryBy R Stead
So many ceramics look the same, but are they?In the past 20 years, there have been significant changes in the materials available, as well as changes to the supply chain, for ceramics used in wear app
Sep 26, 2013
-
Modified ground support with alternative fill material for ground control at Munsar underground manganese mine of MOIL Limited, IndiaBy M Chaudhari, G Manekar, D Shome
MOIL Limited is operating 7 underground and 3 opencast mines in central India and producing annually more than 1.2 million tonnes of various grades of manganese ore. The underground mines are operatin
Nov 30, 2018
-
A Study into Bonding within Reduced Titanomagnetite-Coal CompactsBy R J. Longbottom
In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this
Jul 11, 2011
-
Field Parametric Geostatistics Geostatistical Rigorous Solutions Dealing with Extreme Grades During Resource EstimationBy M Armony, J F. C L Costa, J C. Koppe
Linear kriging methods fail to estimate local grades and local reserves for highly skewed variables due to three reasons: it uses only part of the available data information, it has no physical princi
Sep 26, 2011
-
REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaningBy E Bouchard March, F Lavoie, B Legare, K Bourassa
Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca
Nov 8, 2021
-
Design of Equipment for Dynamic Burden MeasurementsBy D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer
The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa
Aug 24, 2015
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Recent Process Developments at the Phu Kham Copper-Gold Concentrator, LaosBy P Walker, I Crnkovic, D Bennett
The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex
Oct 29, 2012
-
Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network ApproachBy F M. Weir, M Fowler
The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc
Nov 5, 2014
-
Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?By C Killip
Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f
Nov 4, 2015
-
High purity alumina and potash produced from feldsparBy D Connelly
High purity alumina (HPA) is a processed, premium non-metallurgical alumina product characterised by its purity level ie 99.99 per cent (4N) or 99.999 per cent (5N). The market price, application, and
Sep 1, 2024
-
Queensland Mines Should Consider Climate Change Impacts for DecommissioningBy M C. Evans
"Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require
Jul 16, 2014
-
PC-BC: A Block Cave Design and Draw Control SystemThis paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the
Jan 1, 2000
-
Systems Modelling for Water Management in Mining and Minerals ù Bowen Basin CoalBy C Hedemann, N Silveste, H Davis, C J. Moran
For nearly two decades water scientists have been debating the need to use appropriate models for the questions being asked and the data available. This paper puts forward a rationale for a hierarchic
Jan 1, 2006
-
Functional safety and behavioural economics – understanding human error risk in autonomous operationsBy B Patterson, Y Lanwin
Over the last decade the adoption of autonomous technology has proven its potential to fundamentally alter the mining industry, offering significant improvements in safety and productivity. Automation
Apr 16, 2024
-
Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustmentBy Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li
The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit
Jun 19, 2024
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Potential of the Overburden Cast Blasting Technique in Indian Surface Coalmines – A Modular Approach and its Financial ImplicationsBy M D. Uttarwar, R R. Yerpude
India is the world’s third-largest producer of coal and is endowed with the fifth-largest coal reserves in the world. Surface mining straddles the entire domain of the Indian coal mining industry, yie
Aug 24, 2015