Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Predictive Three-Dimensional Modelling of Nuggety Gold Orebodies, Sunrise Dam, Western Australia

    By M J. Nugus, F Clark, E J. Hill, J T. Carswell, J S. Cleverley, N H. S Oliver

    High-nugget gold orebodies are difficult to model in 3D because samples from diamond drill core are generally too small to provide reliable estimates of the gold content of the larger body of rock, an

    Sep 26, 2013

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Hellyer tailings – complex mineralogy but higher grade than many ore bodies

    By M Barden, G Lane, B Quilliam

    NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing

    Nov 21, 2018

  • AUSIMM
    Geostatical Production Grade Estimation in Mount Isa's Copper Orebodies

    This paper describes a detailed geostatistical study of producing copper orebodies at Mount Isa Mines Limited in Queensland, Australia. As a result of this work, kriging has been adopted for grade est

    Jan 1, 1982

  • AUSIMM
    Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in China

    By S Zheng, Y Zhang, Z Wen, S Ma

    Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause

    Jul 10, 2012

  • AUSIMM
    Developing Resilient Water Monitoring Programs in Changing Climate Conditions

    By A D. Price, W J. Germs, O Patterson, T R. Weaver

    "Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo

    Nov 26, 2013

  • AUSIMM
    Development of Newmont's Minahasa Gold Mine in Indonesia

    The green field discovery of a two million ounce high-grade refractory gold ore deposit in the Indonesian Province of Sulawesi Utara, led Newmont to utilise its proven technical expertise in dry grind

    Jan 1, 1997

  • AUSIMM
    Planned Field Investigation of Connectivity between the Condamine Alluvium and Walloon Coal Measures

    By S Gossmann, J Barlow, S Denner

    "Unconventional gas resources, including coal seam gas (CSG) reservoirs, can be located above and below aquifers that provide groundwater for agricultural, industrial, urban and other uses. Developmen

    Nov 26, 2013

  • AUSIMM
    Practical Approaches to Managing Business Critical Water Risk

    By A Tang, K Ringwood

    "Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu

    Nov 26, 2013

  • AUSIMM
    Ultra-High-Intensity Blasting - A New Paradigm in Mining

    By G F. Brent, S Hawke, M Rothery, P Dare-Bryan

    Mine-to-mill studies have previously demonstrated downstream productivity benefits from relatively modest increases in blast energy, or powder factor. These increases have up to now been limited by sa

    Sep 26, 2013

  • AUSIMM
    Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, Cobar

    The maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due

    Jan 1, 1969

  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    Geometallurgical Characterisation of Australian Iron Ores – from Ore to Processed Product

    By M I. Pownceby, J Manuel, S Suthers, A Poliakov, E Donskoi, N Ware

    "The mining industry is constantly seeking methods for optimising the exploitation of mineral resources, such as iron ore, in a sustainable and eco-efficient manner for economic and social benefit. Wh

    Jun 15, 2016

  • AUSIMM
    Energy and Water Requirements in the Treatment of Refractory Gold Ores

    By R Dunne, J Dodd, J Snyder, F Roberto

    Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and

    Sep 26, 2013

  • AUSIMM
    Performance of a Drainage Tunnel and Subvertical Drain System

    By J Y. C Lo

    The construction of two drainage tunnels and the associated subvertical drain system at the Po Shan area in Hong Kong was completed in December 2009. This project is the first of its kind to utilise d

    Mar 8, 2011

  • AUSIMM
    Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods Point

    By P Jackson, J Rea, M D. Goodz

    The Morning Star Gold Mine has operated over a 101-year period, producing gold from narrow quartz veins and sulfide stockworks hosted mainly within a dioritic-gabbroic dyke. The deposit has been devel

    Jan 1, 2008

  • AUSIMM
    An Overview of Geotechnical Issues in Narrow Vein Mining

    By M P. Sandy, J B. Albrecht

    "Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or

    Mar 26, 2012

  • AUSIMM
    Tight slot blasting for routine fault-slip seismicity control at Mt Charlotte Mine

    By P Mikula, R Geranmayeh, R Carlton, M Ferguson, R Whiting

    The concept of using specially designed slot blasts to mine through stress abutments that intersect faults, while controlling fault-slip seismicity, has come of age at Mt Charlotte Mine. Due to the hi

    Nov 29, 2022

  • AUSIMM
    Surfactants for Gold Recovery Improvement with Preg-Robbing Gold Ores

    By Q Zhou, G Barrett, Y Choi, J Jiang

    As part of a general review of processing double refractory ores through Barrick GoldÆs autoclaves /carbon-in-leach (CIL) facility at Goldstrike, a study was made to evaluate the use of surfactants fo

    Sep 26, 2013

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015