Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Numerical Modelling of GPS Signal Propagation and Multipath for Australian Mines

    By Kubik K

    The objective of this paper was to determine if recent advances in numerical electromagnetic wave propagation modelling techniques could be used to study the propagation of GPS signals over arbitrar

    Jan 1, 1997

  • AUSIMM
    New Experience in Gold Roasting Using Lurgi's CFB Technology

    During the past three years Lurgi's Circulating Fluid Bed (CFB) technology has been successfully applied to roasting of refractory gold ores and con- centrates. In comparison with the so-called

    Jan 1, 1991

  • AUSIMM
    Ore Characterisation for Mine to Mill Fragmentation

    By A Scott, S Kanchibotla, J Segui

    The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent

    Jan 1, 2000

  • AUSIMM
    Sublevel caving a narrow vein mine – Pajingo’s case study

    By J F. Carswell, G Cheshire

    The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin

    Mar 15, 2021

  • AUSIMM
    Getting the Burden Right

    By J Poniewierski, Varcos D

    Efficient blasting requires constant vigilance with respect to the actual layout being used in the field. Objective measurement techniques are required in laying out a pattern as the 'by eye&ap

    Jan 1, 1994

  • AUSIMM
    The Diamond Search in Australia: Ications of a Mobile Prospection Unit and the Concept of Mineral-Geochemistry

    The B.R.G.M., through international experience gained over many years, has become very skilled in alluvial prospection, particularly for diamonds. The research laboratories within the B.R.G.M. have

    Jan 1, 1980

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    Staffing Mines in the Future – Learning from a Gender Study for an Ore Establishment in Northern Sweden

    By L Abrahamsson

    This paper describes results from a gender study for a new mine in Pajala, a small community in northern Sweden. Using a gender perspective, the study examines migration, education, local culture, the

    Nov 22, 2011

  • AUSIMM
    Surface Cooling at Kidd Creek Mine

    By K Hortin

    Kidd Creek mine in north western Ontario is developing phase 1 of the deep mine project for mining between 2100 m and 3100 m below surface. Heat problems were experienced during the 2003 summer in wor

    Jan 1, 2005

  • AUSIMM
    New Insights into the Formation, Structural Development and Preservation of Iron Ore Deposits in the Northern Cape Province, South Africa

    By D J. Alchin

    Most of South AfricaÆs high-grade iron ore resources are hosted within a fault-controlled structural basin in rocks of the Palaeoproterozoic Transvaal Supergroup in the Northern Cape Province of South

    Jan 1, 2007

  • AUSIMM
    Copper Price Uncertainties – Chaos Theory to Manage Risks in Mining Projects

    By C Tapia Cortez, C Sammut, S Saydam, J Coulton

    ‘Like every other commodity, the value of the metals is subject to variation’ (Ricardo, 1817). Mineral commodity price uncertainties have always been a significant issue in mining business due to the

    Nov 4, 2015

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Early Development of the Theory of Froth Flotation

    By J T. Smit

    The theory of froth flotation developed slowly, in almost all cases lagging behind practical developments in the operation of flotation processes. This was largely the result of a lack of understandin

    Jan 1, 2005

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By Harrison AT, Smart RM

    Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two

    Jan 1, 1998

  • AUSIMM
    A Review of BHP - Utah Coal Limited's Dragline Stripping Operations

    BHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut

    Jan 1, 1989

  • AUSIMM
    The Expanding Role of Mine Geophysics

    Just as geophysics, in the form of 3D seismic and wireline logging, plays a key role in petroleum reservoir management, so too will geophysics play an important role in mining of coal, metals, and min

    Jan 1, 2000

  • AUSIMM
    Gold Metallogeny of North-East Asia

    By A C. Edwards

    The Mesozoides of North-Eastern Asia represent a collage of exotic terranes which were accreted to the margins of the Siberian continent. In the Late Precambrian and Phanerozoic, the passive margin of

    Jan 1, 1999

  • AUSIMM
    Mineralisation of the Tom's Gully Gold Deposit, Northern Territory

    By Mizuta T, Sakurai M

    The Pine Creek Inlier produced 12 440 kg of gold in the period from the first gold discovery in the 1860s to the early-1900s. During the 1930s renewed large-scale prospecting took place and gave a

    Jan 1, 1994

  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000