Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Hybrid Life Cycle Assessment and Geographical Information System Model for Sustainable Recycled Aggregate Chain Management in Turin (Italy)By E Garbarino, P Molina, V Badino
Given the ever increasing quantity of construction and demolition waste (C&DW), one of the most challenging issues presently facing policymakers and public administrators in Italy concerns how to
Jan 1, 2009
-
Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron ProjectBy G J. Showers, P Botman, A G. Hunt
Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo
Jul 13, 2015
-
The Dynamics of Coupling Between Deformation and Fluid Flow in the EarthÆs Crust: Implications for Ore GenesisPermeability and fluid pathways in fracture-controlled hydrothermal systems are governed by a dynamic competition between permeability-creation processes and permeability-destruction processes. Permea
Jan 1, 2005
-
Dilution, Ore Grade and Blast Movement Calculation ModelBy I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite
This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope
Aug 24, 2015
-
Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel MineBy J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross AreaBy K P. Tully
In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf
Jan 1, 1998
-
Interaction Mechanism of a New Chelating Collector and Copper Sulphide MineralsBy Falbo A, Quarestima S, Cozza C, Barbaro M
A new synthetic reagent of the mercaptobenzoxazole class, 5- methyl-2-mercaptobenzoxazole, has been studied. This reagent exhibits powerful selective collecting action towards copper sulphides presen
Jan 1, 1993
-
Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper MineBy B E. De Gee, N Viviers, A Naidoo
In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio
Sep 1, 2014
-
Toe angle measurement for SAG mill control at Lihir gold mineBy M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz
SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel
Aug 29, 2018
-
Enhancing Risk Management in Strategic Mine Planning through Uncertainty AnalysisBy C Fricke, R Wood, P Velletri
"In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ
Nov 24, 2014
-
The Ventilation and Refrigeration Design for Australia's Deepest and Hottest Underground Operation ù the Enterprise MineBy R Brake
The Enterprise Mine (EM) is located at Mount Isa and is wholly owned by Mount Isa Mines Limited (MIM). This high-grade copper mine extends from about 1000 m below surface to almost 2000 m below surfac
Jan 1, 2000
-
Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May OperationBy S H. Algie, D P. Taplin, S G. Doig
"Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno
Oct 10, 2016
-
Application of RISKGATE to Coal Mine Tailings DamsBy M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe
RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan
Jul 16, 2014
-
Transfer Function – New Method to Accurately Predict Resonant Frequencies of a HighwallBy R Osterman
As mining companies have to go deeper in search of ore and coal, the importance of protecting the highwall increases. Wall fatigue also increases with importance of the long life expectancy of a highw
Aug 24, 2015
-
How to find the optimum air rate for flotation cellsBy J J. Cilliers, K Hadler
Air is fundamental to flotation; not only is it required to collect the valuable particles, but it also controls the froth stability and consequently the separation performance for a given feed. Frot
Aug 29, 2018
-
Successful Risk Management Through Project Life Cycle for Removal of the Crown Pillar at the Marvel Loch Underground MineBy S C. Barrie
St BarbaraÆs Marvel Loch operations have successfully used longhole open stoping as the primary mining method for a number of years. A transition to Core and Shell mining was implemented in 2009 to re
Nov 20, 2012
-
Spontaneous Combustion Management Comparison between Australia and ChinaBy B Poborowski, A Chen
"For some time, the Australian and Chinese underground coal mining industries have evolvedindependently with minimal infl uence on each other. Despite the fact that in recent years severaltechnologies
Jun 1, 2012
-
RISKGATE and Underground OperationsBy J Harris, J Li, M Shi, P A. Kirsch, D Sprott
Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio
Mar 24, 2014
-
Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan
Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho
Mar 15, 2021
-
The Resource Management Act 1991: Its Implementation in OtagoThe Resource Management Act has been in force now for approximately ten months. This Act, and the Crown Minerals Act which accompanied it, have substantially changed the manner by which mining operati
Jan 1, 1992