Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sustainability Reporting and Mining - An Assessment of the State of Play for Environmental Indicators

    The global mining industry is perceived to be a world leader in sustainability reporting û with a 2008 Ernst & Young survey placing four mining companies in their top five performers in sustainabi

    Jan 1, 2009

  • AUSIMM
    Plant trials of a Siro gauge for the determination of solids weight fraction and ash content of coal in slurries of variable voidage

    By McLennan T, Howells E, Zastawny H, Watt J. S

    Nuclear techniques have been used to determine the solids weight fraction (W) and ash content of (fine) coal in slurries independent of voidage variations. The method is based on the correlation betwe

    Jan 1, 1986

  • AUSIMM
    Discovery of the Solomon Iron Deposits

    By D Kepert, C Simpson, D Edwards

    Channel iron deposits (CID) currently supply over 40 per cent of the seaborne iron ore trade out of the Hamersley Province. The two well documented producing systems (Robe and Marillana palaeochannels

    Jan 1, 2009

  • AUSIMM
    Effect of Iron Removal and Reduction on Gold and Silver Extraction by Thiourea Leaching of a Pressure Oxidation Product

    By Woodcock J. T, Zhu T, Sparrow G. J

    A lead-zinc-pyrite flotation middling was pressure oxidised to give residues containing iron hydroxy sulphates (a mixture of basic iron sulphate (BIS) and a hydrated iron sulphate (HIS)) and lead su

    Jan 1, 1991

  • AUSIMM
    Update on Precious Metals in Deep Geothermal Waters of the Taupo Volcanic Zone (TVZ)

    By K L. Brown

    Sampling and analyses of deep waters from Wairakei and Rotokawa geothermal systems indicate a wide range of precious metal concentrations (<0.1 to 23 ppb Au; 6 to 2400 ppb Ag), suggesting that east

    Jan 1, 2006

  • AUSIMM
    Fractals and Spatial Geometry - An Application to Veins in the Otago Schist

    Most people are familiar with Euclidean dimensions: zero for a point; one for a line; two for a plane; and three for a volume. Howeverbobjects are not actually Euclidean, but lie somewhere between Euc

    Jan 1, 1992

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    The Importance of Mineralogical Input into Geometallurgy Programs

    By K S. Smith, J Woodhead, K Olson Hoal

    Mineralogy is the link between ore formation and ore extraction. It is the most fundamental component of geomet programs, and the most important aspect of a life-of-project approach to mineral resourc

    Sep 29, 2013

  • AUSIMM
    Mining of the OK Orebody - Central Norseman Gold Corporation

    The OK orebody comprises a steep dipping narrow quartz reef averaging 0.4 m in width hosted in basalt and gabbro with porphyry bars cross-cutting through it. The following paper tracks the mining of t

    Jan 1, 1998

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, Canada

    By J Millard, K Sexsmith

    BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb

    Jan 1, 2003

  • AUSIMM
    Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case Study

    By S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst

    Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t

    Sep 26, 2013

  • AUSIMM
    Exploration Value Drivers and Methodologies

    By P Guj, J A. Bell

    The valuation of early-stage exploration projects requires a valuer to take into account a large number of uncertain value drivers, the interplay among which may be non-linear. This paper examines som

    May 24, 2012

  • AUSIMM
    Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case Study

    By D Kentwell

    For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e

    Jul 13, 2015

  • AUSIMM
    Laboratory Investigations Leading to the Design of the King Island Scheelite Company's New Concentrator

    CONTENTSThe significance of values givenINTRODUCTIONTHE ORE1. DATA SECURED FROM THE MILLING PLANT AS OPERATING BETWEEN 1938 AND 1942(a) Mill Recoveries(b) Mill Flow Sheet(c) Scheelite-Garnet Associati

    Jan 1, 1944

  • AUSIMM
    Further Development of Short-face Technology in the Soviet Coal Mines

    By Kuzmitch O, Morozov A

    The main direction in the mechanisation in the mines of the Donbas and the USSR is long-face technology with complexes on the base of hydraulic supports. On the base of the 30 year old experience of e

    Jan 1, 1991

  • AUSIMM
    Rotary Drilling Automation Increasing Operator Productivity and Drilling Quality

    By L Eriksson, D Penn, J Appelgren

    Atlas Copco, a leading supplier of equipment and services to the mining and construction industries, is consistently pursuing its strategy to offer the most productive and economical solutions by cont

    Sep 18, 2012