Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Metallurgical Development of an Enargite-Bearing Deposit

    The Metallurgical Development of an Enargite-Bearing Deposit

    Sep 13, 2010

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    The Energy Equation-Oil

    A forecast of energy demand in the non-commu- nist world to the year 1990 is presented with com- ments on the expected effectiveness of conservation efforts in achieving more efficient utilization of

    Jan 1, 1978

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    Sep 13, 2010

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • AUSIMM
    Selective Recovery of Platinum from Cobalt-Rich Crust

    Selective Recovery of Platinum from Cobalt-Rich Crust

    Sep 13, 2010

  • AUSIMM
    BATMIN - Business Analysis Tools for Mining

    BATMINÖ, BATMINEÖ, BATMINDÖ are an abbreviation for Business Analysis Tools for Mining, Mine Evaluation and Mine Design respectively. BATMINP are proprietary tools customised to suit individual clien

    Dec 6, 2010

  • AUSIMM
    40Ar/39Ar Age Determinations from the Waihi and Favona Deposits, North Island, New Zealand

    By C M. Hall

    We report 40Ar/39Ar ages for adularia and illite from veins and wall rocks at the Waihi and Favona deposits, in the Waihi district. One sample of vein adularia from the Favona deposit yielded a platea

    Jan 1, 2003

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    An investigation into maximising the product grade and recovery of dense minerals in a single-stage REFLUX™ Classifier

    By J Zhou, L Crompton, K P. Galvin, J L. Sutherland, C P. Lowes, C Bezuidenhout, J Bijzet

    Platinum Group Metal (PGM) bearing ores from the Upper Group 2 (UG2) reef often contain significant concentrations of chromite which can potentially be upgraded to produce a saleable product. A common

    Aug 24, 2022

  • AUSIMM
    The New System of Structural Analysis in Drillcore

    A comprehensive analysis of rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engin

    Jan 1, 1990

  • AUSIMM
    A New Magnetic Drum Separator for Superfine Magnetite

    By Z Tong, M Gao, X Wang

    In response to the need for improved magnetic separators for beneficiation of fine grained iron ores that have been finely ground to liberate the iron minerals from the gangue, a series of high effici

    Jan 1, 2009

  • AUSIMM
    Recycling of Process Water in Sulfides Processing and Flotation Selectivity

    Recycling of Process Water in Sulfides Processing and Flotation Selectivity

    Sep 13, 2010

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    Beneficiation of Iron Ore - Washing with Surface-Active Agent

    Beneficiation of Iron Ore - Washing with Surface-Active Agent The stability of the dispersed phase in 10 wt per cent slurry of iron ore slime and fines was studied at pH 5 and different concentration

    Sep 13, 2010

  • AUSIMM
    Cleaner circuit optimisation at Cadia Operations

    By J Seppelt, B Akerstrom, J Bubnich, D Seaman, T Waters

    The Cadia Hill concentrator at Newcrest’s Cadia Operations has undergone several modifications and upgrades to treat an increased throughput rate of harder ore from the Cadia East block cave mine.Subs

    Aug 29, 2018

  • AUSIMM
    Evaluation of the Iron Blast Furnace Process using Heat and Material Balances of the Flame-Zone

    Evaluation of the Iron Blast Furnace Process using Heat and Material Balances of the Flame-Zone

    Sep 13, 2010

  • AUSIMM
    Bubble Load Measurements in Flotation - A Critical Review of Current Practice

    Bubble Load Measurements in Flotation - A Critical Review of Current Practice

    Sep 13, 2010

  • AUSIMM
    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Sep 13, 2010