Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Determining ventilation system model inputs from field test work in the oil shale mineBy S Sabanov
Determining ventilation system model inputs from the field test work has been produced in the working oil shale mine which has been in production since the early 1970s. At this mine room-and-pillar wi
Aug 28, 2017
-
Nuclear Borehole Logging Techniques Developed by CSIRO Exploration and Mining for the Metalliferous Mining IndustryBy J Charbucinski
Commonwealth Scientific and Industrial Research Organisation (CSIRO), Exploration and Mining, has developed nuclear spectrometric techniques for borehole logging. The paper reviews the latest developm
Jan 1, 2000
-
Prospective Electric Pulse Processes for Sustainable Processing of Mineral Raw MaterialsBy V A. Tsukerman
Prospects a new energy saving method for an efficient destruction of the sturdy and hard materials (rocks, ores, frozen soils, concrete blocks, etc) û the Electric Pulse Discharge (EPD) method of mate
Jan 1, 2002
-
A Geophysical Study of the Structure of the Waihi Region, New ZealandBy C A. Locke, A B. Christie, J Cassidy, J L. Mauk
New and existing gravity and aeromagnetic data are used to determine the structure of the Waihi region and to investigate any relationship between structure, hydrothermal alteration and epithermal min
Jan 1, 2003
-
Bubble Size Effect on the Dynamic Adsorption of Frothers and Collectors in FlotationBy G M. Evans, C M. Phan
This paper presents an analysis on the dynamic adsorption of frothers and collectors onto air bubbles in flotation. The analysis was carried out using the theory on the surfactant transfer by diffusio
Jan 1, 2005
-
False Colour Backscatter Electron Images and Their Application During Electron Microprobe Analysis of Ores and Host RocksBy Ramsden AR, French DH
The limited contrast range of conventional black and white imaging does not enable full use to be made of the dynamic range of the video signal obtained from a scanning electron microscope or micro
Jan 1, 1989
-
Laboratory Studies in Comminution: Part VI The Specific Rate of Breakage for Rod and Ball Milling of QuartzBy P G. Hicks
The influence of feed size and pulp density on the specific rate ofbreakage of quartz was investigated. Plots of log fraction of feedremaining within the feed size interval against grinding time allow
Jan 1, 1998
-
Off to a Good Start with Lift #2: Drawbell Extraction ù NorthparkesBy M Lovitt, T Hewitt
The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside
Jan 1, 2005
-
Coal Mine Drainage Geochemistry, West Coast, South Island û A Preliminary Water Quality Hazard ModelBy D Craw, N Newman
Previously published stream quality data and AMD (acid mine drainage) analyses have been collated into a database (DAME û Database for Assessment of Mine Environments) and additional samples including
Jan 1, 2006
-
Shaft construction at the Gold Fields Wallaby mineBy J Graaf, R A. Murrell
Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate
Oct 16, 2017
-
Thermodynamics of Metal-Interstitial SolutionsThermodynamic properties of the solutions of hydrogen in metals and carbon in austenite were investigated and it is possible to predict the interstitial solubility in these systems over relatively wid
Jan 1, 1970
-
Optimum Equipment Management Through Life Cycle CostingLarge mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter
Dec 6, 2010
-
Improvement of sinter productivity by control of magnetite ore segregation in sintering bedBy H Matsuno, N Oyama, T Yamamoto, K Nakajima, Y Iwami, N Saito
Recently, the quality of sinter feed ore used in sintering process has deteriorated. In particular, Fe has decreased and gangue component has increased in the sinter feed ore. Increase of gangue is no
Jul 24, 2017
-
Sedimentological and Structural Controls on the Pattern and Distribution of the Blue Spur Conglomerate Gold Placers, East Otago, New Zealand: A Model for Placer ExplorationBy D Craw, G Eis
Late Cretaceous Blue Spur Conglomerate preserved as isolated remnants at Gabriels Gully, Weatherstones, Forsyth, Waitahuna Gully and Adams Flat was deposited during the intiation and early stages of e
Jan 1, 1999
-
The Economic Effect of Greenhouse Policies in New ZealandNew ZealandÆs share of global greenhouse gas emissions, at about one fifth of one per cent, is very small. But the profile of those emissions is unique among OECD countries; more than half come from m
Jan 1, 2002
-
McArthur River Mine Heavy Medium Plant – The Benefits of Applying Modern Coal Plant Design Principles to Base Metal Heavy Medium SeparationBy K Cameron, S Strohmayr, J Wallace
In 2012, a single module heavy medium cyclone plant (HMP) was installed at the Glencore Zinc’s (then Xstrata Zinc) McArthur River lead zinc mine. The HMP formed the first part of the MRM Phase 3 Proje
Sep 7, 2015
-
Zeolite and SilicaCommercially interesting deposits of zeolite rich tuffs and amorphous silica have been discovered recently in the Taupo Volcanic Zone (TVZ), North Island, New Zealand. This paper reviews them and comm
Jan 1, 1997
-
A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine PlanningMine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a
Dec 6, 2010
-
The Evaluation of Industrial Mineral ProjectsIndustrial minerals and rocks are those which are economically important because of desirable physical and/or chemical properties rather than metal or energy content. The evaluation of these resources
Jan 1, 1988
-
Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken HillThe 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The
Jan 1, 1965