Search Documents

  • CIM
    Electrical and environmental protection of high- and low-voltage mine cables

    By R. W. Mei, R. A. Strombom, D. J. Moore

    "Heat-shrinkable cable accessories are solving problems in the mining industry. This paper describes a range of products used by the industry, including low-voltage splices, high-voltage splices to 8.

    Jan 1, 1980

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • SME
    Raw Water Tunnel Condition Assessment

    By Rafael C. Castro

    As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In

    Jan 1, 2008

  • AIME
    Metal Divisions? Fall Meeting at Cleveland

    By AIME AIME

    THE Fall Meetings of the Institute of Metals Division and of the Iron and Steel Division were held in Cleveland from Tuesday, Oct. 20, to Thursday, Oct. 22, as a part of the National Metal Congress. T

    Jan 1, 1936

  • AIME
  • AIME
    Discussion Of The Papers Presented At The Salt Lake City Meeting, September, 1925

    CONTENTS PAGE ANDERSON, ARVID E., and CAMERON, FRANK K.-Recovery of Copper by Leaching, Ohio Copper Co. of Utah. Discussed by Thomas B. Brighton, H. C. Goodrich, Arvid E. Anderson, Thos. P. Billings

    Jan 12, 1925

  • AUSIMM
    A Team Approach to Optimising a Mining Method - Bench Stoping in the Silver/Lead/Zinc Orebodies at Mount Isa

    By Jarc H

    The steeply dipping silver/lead/zinc orebodies at Mount Isa mine have been extracted most recently by a combination of cut-and-fill and open stoping methods. Bench stoping was first used at Mount Isa

    Jan 1, 1992

  • SME
    Investigation and Cement Grouting of Big Creek Tunnel 2: A Leaking Historic Hydroelectric Tunnel

    By David Van Horsen

    Big Creek Tunnel 2, constructed in 1912, is located in the Sierra Nevada Mountains of California, east of Fresno. It is horseshoe and circular shaped with a 3.6m (12ft) diameter and extends 6.6km (4.1

    Jan 1, 2008

  • DFI
    Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? Introduction

    By Richard Short

    Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l

    Jan 1, 2007

  • TMS
    Thermodynamic Evaluation Of Copper Loss In Slag Equilibrated With Matte (Keynote) (e1b5fcab-c04a-42e0-9f44-edfb2892ee4d)

    By Yoichi Takeda

    Copper solubility in SiO2-CaO-FeOx slag equilibrated with copper matte in 10% SO2 atmosphere at 1573K was estimated. Essential parameters are activity coefficients of copper oxide and sulfide, oxygen

    Jan 1, 2003

  • ABM
    Análise Macroestrutural E Mecânica Da Liga Hipoeutética Al-2%ni Com Adição De 1% De Nanotubos De Carbono

    By Maria Sílvia Camarão de Sousa

    Nesse estudo foi fabricada uma matriz hipoeutética de Al-2%Ni e adicionado nela a concentração 1,0 % de nanotubos de carbono de paredes múltiplas (NTCPM). A fabricação do material estudado aconteceu p

    Aug 17, 2017

  • IMMS
    Design of Power Distribution System for Deep-Sea Mining: What are the Criteria and Challenges?

    By Elisabetta Tedeschi, Razieh Nejati Fard

    Deep-sea mining is in the future perspective of mining industry and it is currently in the technological development phase. The focus of this study is on the electrical power system that provides suff

    Jan 1, 2018

  • NIOSH
    RI 9335 - Production of Lead Metal by Molten-Salt Electrolysis With Energy-Efficient Electrodes

    By J. E. Murphy

    The u.s. Bureau of Mines investigated electrode designs for electrowinning lead metal from a LiCl-KCl-PbCI2 electrolyte at 4500 C. The major objective of this investigation was to decrease the energy

    Jan 1, 1991

  • AUSIMM
    Concentration and Hydraulic Transport of Heavy Mineral Concentrate with Automatic Control

    Titanium and Zirconium Industries Pty. Ltd. separates rutile and zircon from heavy mineral concentrate recovered from sand dunes on the east coast of North Stradbroke Island, Queensland. Separation pl

    Jan 1, 1962

  • IOM3
    Tectonic setting, deep faults and mercury mineralization at Almaden, Spain and Nikitovka, Ukraine: affinities and contrasts

    By Boorder De, B. S. Panov, A. B. Westerhof, V. A. Korcemagin

    Paper presented at the conference on Economic geology in Europe and beyond II, models for <mineral deposits> in sedimentary <basins>, held in Keyworth, UK, 13-14 April 1994. The Hg and Sb deposits of

    Apr 1, 1995

  • AUSIMM
    Oceanographic Preparations for Offshore Drilling

    There is a lack of information concerning the movements of water on the continental shelf, particularly with regard to data obtained regularly over significant periods of time. The Horace Lamb Centre

    Jan 1, 1971

  • AUSIMM
    Effective Dry Density Benefication of Coal

    Effective Dry Density Benefication of Coal

    Sep 13, 2010

  • ABM
    Geometalurgia Aplicada Ao Processo De Pelotização Com Foco Em Produção E Consumo Energético

    By Marcos Meyer Machado

    O presente trabalho compreende um estudo sobre os processos de moagem e tratamento térmico de pelotas no que tange as implicações microestruturais de minério de ferro no controle operacional e redução

    Oct 30, 2017

  • AIME
    General - Die Pressing of Brass and Copper Alloys (With Discussion)

    By John R. Freeman

    The die pressing of brass may be described as a method of producing irregularly shaped parts of brass and other copper alloys by hot deformation in a die under pressure. Die pressing of brass was firs

    Jan 1, 1931

  • DFI
    Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element Modelling

    By Vijaya R, Boominathan A

    The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p

    Sep 1, 2022