Search Documents

  • AIME
  • AUSIMM
    A Tool for Benchmark Study of Roadway Development Performances

    In responding to why some longwall roadway development rates are different among mines, the Roadway Development Task Group (RDTG) of Australian Coal Association Research Program (ACARP) has initiated

    Dec 6, 2010

  • IIMP
    Planificación de la ventilación de Outokumpu OY

    By Ilkka Haapamäki

    El presente texto señala la planificación del proceso de ventilación Outokumpu en la mina Helsinki, Finlandia a través de la evaluación de las cantidades de aire. Este sistema se basa en normas locale

    Oct 14, 1980

  • IOM3
    Prediction of performance of 76-mm compound autogenous cyclone at different outlet diameters

    By R. Venugopal, T. C. Rao, N. Suresh

    Experiments were carried out using the cyclone to treat coal in the size range -2.0+0 mm. The diameters of the cyclone outlets (vortex finder and spigot) were varied to study their effects on cyclone

    Apr 1, 1995

  • NIOSH
    OFR-88-81 Evaluation Of Intrinsically Safe Instruments And Apparatus For Use In Underground Coal Mines

    By J. M. Kurtz

    Ten Methane Monitoring Systems and Machine Control Circuits were examined and tested per the requirements in CFR Title 30, Parts 18 and 27, the Standard UL 913 and the document "Test Requirements For

    Jan 1, 1980

  • AIME
    Producing – Equipment, Methods and Materials - New Concepts in Sucker-Pod Pump Design

    By R. J. Watson, A. H. Juch

    About half a million sucker-rod pumps are installed in oil wells in the U. S. alone. In Venezuela, too, the system is widely used; some 5,000, or 90 percent, of Cia. Shell de Venezuela's wells pr

    Jan 1, 1970

  • SAIMM
    Structural Characteristics of Strata Overlying of a Fully Mechanized Longwall Face: A Case Study

    By J. Ning, T. Bu, J-Q. Jiang, L. Jiang

    "In coal mining in China, the cutting height of the shearer in longwall faces is increasing. Owing to the increase of extraction height, the caved roof strata area is enlarged, and new issues are bein

    Nov 1, 2018

  • CIM
    Mining industry-Aboriginal Engagement Pursuant to new Ontario Mining Act rules: A Preliminary Examination of Potential Impacts

    By K. Webb, M. Hohn

    "This paper reviews the evolving Ontario mining regime for mining industry-Aboriginal engagement and its apparent alignment with court decisions, domestic law, emerging international norms, mining ind

    Jan 1, 2016

  • CIM
    Column Flotation Applied to the Production of Phosphate Rock in Araxa-MG, Brazil

    By Antônio Peres, Rogério Guimaraes, Lauro Takata, Harold Wyslouzil

    "Serrana’s concentrator, in Araxii, has capacity of producing approximately 800,000 tomes of phosphate rock per year, with a P205 grade of 36%, from ores grading between 13% and 14% P205. The annual m

    Jan 1, 1999

  • AUSIMM
    A Microscopic Examination of Metallized Iron Ore-Coke Pellets

    By Innes J. A

    The structural variations occurring in pellets of finely divided mixtures of iron ore and coke breeze, metallized by firing at elevated temperatures, have been examined microscopically. For any given

    Jan 1, 1963

  • NIOSH
    OFR-152-82 Develop A Mechanical Scaling Bar

    By J. S. Megahan

    This report covers the design, fabrication and testing of the first and second generation mechanical scaling bars for more safely removing loose rack from mine roofs and walls. Included are discussion

    Jan 1, 1982

  • NIOSH
    RI 3200 Washability Studies of the Blue Creek Bed at the Connellsville Mine, Connellsville, Ala.

    By W. G. Payne, A. C. Richardson, B. L. Gandrud

    "INTRODUCTION The Connellsville mine of the Yolande Coal & Coke Co. is in the southwestern part of Jefferson County, Ala., about 30 miles southwest of Birmingham. The mine is on the Blue Creek bed, wh

    Feb 1, 1933

  • ABM
    Avaliação Do Potencial De Incorporação Do Resíduo De Mármore Na Produção De Grês Porcelanato

    By Elione Moura Carlos

    O objetivo principal deste trabalho foi incorporar o resíduo de mármore no desenvolvimento de formulações de massas cerâmicas para obtenção de grês porcelanato. Foram preparadas quatro formulações da

    Aug 7, 2018

  • CIM
    POWERPLAY - Realizing Savings Through Energy Management

    By Andy Lemay

    Vale (previously known as CVRD) is: ? The second-largest mining company by market capitalization (NYSE:RIO) ? Headquartered in Brazil ? Global workforce of over 100,000 employees including outsourc

    May 1, 2008

  • NIOSH
    IC 8838 Polychlorinated Biphenyls: Regulations And Substitutes - A Compliance Manual For The U.S. Mining Industry

    By R. A. Westin

    [Polychlorinated biphenyls (PCR's) have been widely utilised as fire-resistant dielectric coolants; in electrical equipment used in mining applicants, including transformers, capacitors, electric

    Jan 1, 1980

  • SAIMM
    KOLLIG op oppervlaktebeddeking van metaalonderdele

    By deur A. P. van Wyk

    Die Spesialistegroep, Materiaalingenieurswese van die Pretoria-gebied, het op 25 November 1981 'n baie geslaagde colloquium te Universiteit van Pretoria aangebied met die tema 'Oppervlaktebe

    Jan 1, 1982

  • NIOSH
    RI 4918 Taconite Fragmentation

    By Vernon C. Davis

    In initial attempts to mine taconite by conventional open-pit methods, the material tended to break into tabular blocks that were too large to be handled by conventional shovel dippers and were unsati

    Jan 1, 1953

  • NIOSH
    Coal-Pyrite Flotation: A Modified Technique Using Concentrated Second-Stage Pulp

    By Kenneth J. Miller

    The Bureau of Mines two-stage coal-pyrite flotation process was modified to provide a more concentrated final clean coal slurry underflow which could be dewatered economically by filtration or centrif

    Jan 1, 1975

  • NIOSH
    RI 8017 Compositional Variations of Organic Material From Green River Oil Shale-WOSCO EX-1 Core (Utah)

    By W. E. Robinson

    Differences in the composition or chemical structure of the organic material in samples of Uinta Basin (Utah) oil shale were studied relative to stratigraphic position within the Green River Formation

    Jan 1, 1975

  • SAIMM
    A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.

    By Simon St J Tose

    The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t

    Jan 1, 2006