Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Conveyor Important For Success of South Bulga Longwall in AustraliaBy Edmond J. O’Donovan
South Bulga is a new longwall operation located in the Hunter Valley coal-mining region in Southeastern Australia. The mine’s objective is to achieve productivity levels significantly higher than the
Jan 1, 1996
-
Sound restoration hearing protection: Genesis of a standard test methodBy Amanda S. Azman
It is known that exposure to high sound pressure levels can lead to permanent hearing loss; however, many workers, in mining as well as other occupational sectors, frequently receive hazardous noise e
Jan 1, 2008
-
Thermodynamically consistent versus completely empirical property models in process simulationBy M. W. Wadsley
"Physical and chemical property models are widely used in process engineering. There exist, in the published literature, completely empirical models of ''thermodynamic properties"", that is,
Jan 1, 2005
-
Análise De Falha Do Convertedor 2By Flávio Altoé Franco
Foi identificada uma trinca no convertedor 2 da ArcelorMittal Tubarão em junho de 2013 durante início de carregamento de gusa, esta se localizava na solda entre o cone inferior e o flange do fundo. A
Aug 16, 2017
-
Air Decking at Duvha, a Technical EvaluationBy S A. Steyn, P Terrett
Air decking has become a widely practised method internationally for modifying fragmentation results and providing cost savings from reduced explosive consumption. Duvha has been applying air deck tec
Jan 1, 1995
-
Hong Kong Strategic Sewage Disposal Scheme Stage I—Deep TunnelsBy Will Foreman, Douglas D. McLearie, Edwin K. H. Tong, William H. Hansmire
Hong Kong’s Strategic Sewage Disposal Scheme (SSDS) Stage I involves the provision of a system of deep tunnels for transporting to a central treatment works wastewater collected from a number of catch
Jan 1, 2001
-
Development of Technology for Complex Uranium Ores Processing on the Flotation Process BasisDevelopment of Technology for Complex Uranium Ores Processing on the Flotation Process Basis
Sep 13, 2010
-
Stability Assessment of a Tailings Pond Considering the Effect of Staged Construction and Embankment Raising Rate: a Numerical Study - Mining, Metallurgy & Exploration (2023)By Abhishek Kumar, T. G. Sitharam, Surender Singh
The height of tailings pond (TP) embankments is frequently raised to accommodate the ever-increasing volume of tailings released by the mining industries. Excess pore water pressure (EPWP) may develop
May 16, 2023
-
Frontier Research In Dynamic Control, Vision And Collision Avoidance For Truck HaulageBy S. Agarwal, S. Frimpong
The creation and maintenance of a healthy working environment in surface mining operations require sustained efforts in pursuing advanced research initiatives toward the development and deployment of
Jan 1, 2007
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, TexasBy Greg Wieland
Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.
Jan 1, 2008
-
The Development and Application of Polyurethane Injectable Cable BoltsBy Dakota D. Faulkner
Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United
Jan 1, 2012
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington MineBy J Li
Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud
Mar 21, 2011
-
The Mining Licensing Regime - Current DevelopmentsBy D A. Edmunds
The most important development that has been taking place recently relating to mining operations in New Zealand would generally be regarded as being the Resource Management Law Reform. This has been w
Jan 1, 1988
-
Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USABy Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach
Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th
Jan 1, 1997
-
Engineering Approaches To Rock Mechanics Problems In Longwall MiningBy J. Kuti
In room and pillar mining a large number of working points are arranged to follow a mining pattern. Geological and roof control problems can be overcome or their effect minimized by varying this patte
Jan 1, 1971
-
Minerals Beneficiation - Large-Scale Laboratory Investigation of the Ammonium Sulphate Leaching-Hydrogen Reduction Process as Applied to Nicaro Bulk PrecipitatesBy J. F. Shea, O. F. Tangel
Battelle Memorial Institute participated in a program for the General Services Administration aimed at developing a nickel-cobalt separation process that could be integrated in the Nicaro nickel plant
Jan 1, 1961
-
Comment On The Paper ?Strong Ground Motion And Site Response In Deep South African Mines?, By S.M. Spottiswood And A. M. Milev - In The Journal Of The SAIMM, Vol. 105, No. 7, Pp. 515?524In their excellent paper, Milev and Spottiswoode have provided quantitative and definitive descriptions of an important phenomenon that hitherto has been largely the subject of conjecture. They conv
Jan 1, 2006
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019