Search Documents

  • CIM
    Suitability of PEM Fuelcells for Underground Mining Vehicles

    By Marc C. Bétournay

    Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a

    May 1, 2003

  • SME-ICGCM
    Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?

    By Wouter Hartman

    Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int

    Jan 1, 2012

  • SME
    Challenges of Design and Fabrication of Fiber Reinforced Polymer (FRP) Flanges—A Review - SME Annual Meeting 2024

    By Bruce D. Hebb, Shahin Shadlou

    Fiber Reinforced Polymer (FRP) is an excellent material choice for a broad spectrum of corrosive fluids and, in many cases, offers the best value per dollar. FRP Flanges present the greatest design ch

    Feb 1, 2024

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME
    Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel Project

    By Stephen M. Smading

    The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b

    Jan 1, 2009

  • SME
    Exploratory Finite Element Analysis (FEA) And Conceptual Design Findings Of Large-Diameter, Segmentally Lined Shafts

    By D. Kruse

    Top-down constructed large-diameter (up to 90 m or 300 ft) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study co

    Jan 1, 2011

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • CIM
    Human Factors and Human Error in the Mining Industry: A Review and Lessons from Other Industries

    By A. Yaghini, Y. Pourrahimian

    "Human factors (HFs) play an important role in the mining and mineral industry, affecting operational and maintenance efficiency and safety. Despite the introduction of new technologies and automation

    Jan 1, 2018

  • SME
    Industrial Minerals 2004 – Ball Clay

    By R. L. Virta

    Four companies mined ball clay in four States during2004. They were H.C. Spinks Clay (owned by Franklin Minerals) Kentucky-Tennessee Clay (owned by Imerys),Old Hickory Clay and Unimin. Production wa

    Jan 1, 2005

  • IOM3
    Framework for modelling of metallurgical processes

    By W. R. Paterson, W. Morton, D. B. Cameron

    The Massbal II computer simulation program has been used to develop a general framework for the building of thermochemical models of metallurgical processes. The framework allows the rapid, simple con

    Apr 1, 1991

  • NIOSH
    The Changing Organization Of Work And The Safety And Health Of Working People - Knowledge Gaps And Research Directions

    By Theodore M. Katz, W. Stephen Brightwell, David E. LeGrande, Joseph J. Hurrell, Jane A. Lipscomb, Nancy Lessin, Lawrence R. Murphy, Michael J. Colligan, Steven L. Sauter, Richard A. Lippin

    Revolutionary changes in the organization of work have far outpaced our knowledge about the implications of these changes for the quality of working life and for safety and health on the job. This gap

    Jan 4, 2002

  • CIM
    Part 1 ..... Glass, Clay Products and Ceramic-Metal Systems

    "Many advances in glass technology and processing are being made and the possibilities for glass as a material in the future appear unlimited. Float glass, glass-ceramics, high-strength sheet and cont

    Jan 1, 1967

  • IIMP
    Optimización del Sistema de Control para los procesos de Extracción por Solventes y Depositación Electrolítica en Planta LESDE Toquepala

    By Adrián Del Carpio

    Desde 1995 la planta de Lixiviación de Toquepala desarrolló un sistema de control automático para los procesos de extracción por solventes y electrodepositación. Sin embargo, con el desarrollo de la t

    Sep 12, 2011

  • CIM
    Enhanced Gravity Recovery of Base Metal and Industrial Minerals

    "Mineral separation by exploiting the differences in mineral or metal specific gravities (sg) has been used since antiquity. In the modern era, this is most commonly seen in the recovery of gold by t

    Jan 1, 2017

  • AUSIMM
    Blast Furnace Department at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    A BRIEF DESCRIPTION OF TELPHER HANDLING AND BLAST FURNACE EQUIPMENT.The various sections will be described in the following order:(a) Telpher Handling and Storage Bins.(b) Blast Furnaces.(c) Slag Disp

    Jan 1, 1937

  • NIOSH
    RI 5965 Heats And Free Energies Of Formation Of Gallium Sesquioxide And Scandium Sesquioxide ? Introduction And Summary

    By Alla D. Mah

    The heat of formation of scandium sesquioxide (Sc203) has not been measured previously, and existing values for gallium sesquioxide (Ga203) are subject to large uncertainties. As a consequence, thermo

    Jan 1, 1962

  • NIOSH
    IC 8128 Bibliography Of Tar Bases: Analysis, Production, Synthesis, And Utilization ? Introduction

    By Howard W. Wainwright

    This bibliography was compiled by the Bureau of Mines as part of an investigation into the possible utilization of low-temperature coal-tar bases. The bibliography consists of literature and patent re

    Jan 1, 1962

  • AIME
    The Duties of the Engineer

    IN speaking, on the subject, "Engineer-Citizens," at the Lehigh Valley Mineral Industries Conference dinner, on April 26, at Easton, Pa., George Otis Smith, Director of the United States Geological Su

    Jan 5, 1928

  • ISEE
    Soil Cap Density Distributions Resulting from Buried Explosions in Saturdated Sand

    By L C. Taylor, H U. Lesiste

    This paper describes a method for estimating the density distribution in the soil cap as a function of distance from its top at the time of impact with the target. It provides an estimate of the densi

    Jan 1, 2011

  • SME
    Rock Fragmentation Size Distribution Prediction and Blasting Parameter Optimization Based on the Muck-Pile Model "Mining, Metallurgy & Exploration (2021)"

    By YUSONG MIAO, DI WU, XIANRONG YAN, YIPING ZHANG, JIE LIN, KEBIN LI

    Rock fragmentation size distribution is often used as an important index to account for the blasting effect because it directly affects the subsequent loading, transportation, and secondary crushing.

    Jan 22, 2021