Search Documents

  • ABM
    The Iso 5832-9 Steel Hot Flow Curves, An Analytical Study

    By Samuel Filgueiras Rodrigues

    An austenitic stainless steel ISO 5832-9 was deformed in a torsion test machine over the temperature range of 1,000°C – 1,200°C and strain rates of 0.05, 0.1, 1.0 and 5.0s-1. The Steel plastic behavio

    Aug 8, 2018

  • AUSIMM
    Dynamic Testing of Combined Rock Bolt and Mesh Schemes

    By A G. Thompson, E Villaescusa, A De Zoysa, J R Player

    Ground support performance is critical to the safe and economical extraction of ore. This is particularly important for mass mining extractions at great depth, which are currently being considered by

    May 9, 2016

  • AIME
    Minerals Beneficiation - Recent Development of Stability Studies of Steep Rock Slopes in Europe

    By K. W. John, L. Mueller

    The rock mechanics approach to stability problems of steep rock slopes dealt with in this article has particular reference to the concept and methods of analysis developed by the Salzburg, Austria, sc

    Jan 1, 1963

  • AUSIMM
    Some Notes on Recent Changes in Ore Extraction Practices in the Zinc Corporation and New Broken Hill Consolidated Mines

    Up to the end of World War n, flat-back cut and fill stoping with or without square sets was the universal method of ore extraction. Rapid changes in practice occurred during the post-war years; first

    Jan 1, 1957

  • SME
    Removal Of Cadmium From Raw Indium By Physical And Chemical Methods

    By Z. H. Zhou

    It is difficult to remove cadmium from raw indium using only electrolytic refining because their standard potentials are similar. In this paper, physical and chemical methods were used to remove Cd fr

    Jan 1, 2007

  • DFI
    Aseismic Bearing Capacity Of Pile Foundation ? Synopsis

    By J. X. Wu

    An investigation on the seismic damage to buildings with pile foundations in Tianjin region, was conducted after the earthquake which hit Tangshan in 1976. It showed that most pile-founded buildings h

    Jan 1, 2010

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • AUSIMM
    Petrology of the Zinc Lode, New Broken Hill Consolidated Ltd., Broken Hill, New South Wales

    Drill cores from Section 62, New Broken Hill Consolidated Ltd., were used to study the petrology of rocks associated with the zinc lode. The distribution of the rock types in relation to the lode stru

    Jan 1, 1961

  • AUSIMM
    The Market, the Mining Geologist and Booms and Busts

    After a five year period representing the strongest resource and commodity rally ever experienced, we are now faced with a subdued recovery following the global financial crisis. This renewed economic

    Jan 1, 2009

  • SME
    Queens Bored Tunnels, East Side Access, New York

    By David Smith, Bernie Martin

    The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr

    Jan 1, 2005

  • AIME
    Mining Operations in New York City and Vicinity

    By H. T. Hildage

    ALTHOUGH Greater New York does not bear any resemblance to a great mining district, the mining operations that are being conducted in and about the city are both extensive and interesting in character

    May 1, 1907

  • CIM
    The Function of the Mines Branch Radioactivity Division

    By E. A. Brown

    "IntroductionBACK IN THE nineteen-thirties, when Eldorado was a private company and was preparing to become Canada's first radium producer, the Mines Branch in Ottawa did much work on the development

    Jan 1, 1953

  • NIOSH
    RI 6362 Continuous Electrowinning 0f Cnium Metal From Cerium Oxides

    By T. A. Henrie, J. D. Marchant, E. S. Shedd

    Cerium metal was electrowon in a fluoride bath from cerous oxide and tapped from the cell during prolonged operation . Electrolyte constituents were CeF , BaF₂ , and LiF. Twenty- seven pounds of metal

    Jan 1, 1964

  • NIOSH
    OFR-98A-86 Human Resource Management Skills And Coal Mine Productivity - Final Report - Volume I

    By Paul S. Goodman

    Volume I This report presents the first national survey of miners' attitudes and opinions about their-work. The goal is to present attitudinal data that bears on coal production. Interviews w

    Jan 1, 1985

  • SAIMM
    The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia Mine

    By J. Krzyzanowska

    Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current

    Jan 1, 2007

  • AUSIMM
    Hydraulic Handling in Mining Fully Automatic Large-Scale Test Unit on a Practical Scale

    The process of hydraulic transport through pipelines, worldwide well known for the transport of fine-grain solids is also being used to a greater extent in mining for the handling of primarily coarse-

    Jan 1, 1980

  • CIM
    Lake Shore Geology

    By W. T. Robson

    LAKE Shore Mines, Limited, with property at Kirkland. Lake, Ontario, was incorporated m 1914 and commenced product10n m March, 1918, with an initial capacity of about 60 tons per day. Since that time

    Jan 1, 1936

  • DFI
    Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation Support

    By Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree

    A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)

    Jan 1, 2018

  • SME
    Ground Support Optimization Using a Structured Strata Management Process in Wide Set-up Room Roadways at West Elk Mine

    By Bob Munz, Ry Stone

    To facilitate the installation of the longwall equipment for each extraction panel, West Elk mine develops set-up room roadways that are between 26.5 and 30.5 feet wide. Historically at the mine, the

    Jun 25, 2024