Search Documents

  • AIME
    Papers - Miscellaneous Heavy Metals and Alloys - Time-to-fracture Tests on Platinum, 10 Per Cent Iridium-platinum and 10 Per Cent: Rhodium-Platinum Alloys (Metals Technology, April 1943)

    By H. E. Strauss

    The time-to-fracture test has been applied to pure platinum and to two alloys of platinum under the special conditions of small cross-sectional area of the specimens and of a test temperature above th

    Jan 1, 1943

  • AIME
    Papers - Miscellaneous Heavy Metals and Alloys - Time-to-fracture Tests on Platinum, 10 Per Cent Iridium-platinum and 10 Per Cent: Rhodium-Platinum Alloys (Metals Technology, April 1943)

    By H. E. Strauss

    The time-to-fracture test has been applied to pure platinum and to two alloys of platinum under the special conditions of small cross-sectional area of the specimens and of a test temperature above th

    Jan 1, 1943

  • SME
    Efficient Separation of Trace Muscovite within the Surface/Interface of Quartz Grains from a Hydrothermal Deposit by Oxidizing Calcination and Catalytic Pressure Leaching Mining, Metallurgy and Exploration

    By Xun Zhang, Hang Qiu, Andrea R. Gerson4, Shaomin Lei, Yubiao Li, Yu Meng, Zhenyu Pei, Min Lin

    Efficient separation of trace muscovite from the surface/interface of quartz grains was accomplished during oxidizing calcination and catalytic pressure leaching of the hydrothermal quartz. Experiment

  • CIM
    The Correlation of Kootenay Coal Seams

    By Charles B. Newmarch

    Abstract In the course of coal studies undertaken by the B.C. Department of Mines in southeastern British Columbia, special attention was directed to problems of coal seam correlation. Methods that

    Jan 1, 1950

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • CIM
    Start-Up and Early Optimization of the New Afton Concentrator

    By C. O’Hara, S. Roy, K. Swedburg, J. Katchen

    "New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve

    Jan 1, 2015

  • AUSIMM
    Boring a Slime Dam

    By Met B

    IN the followmg paper an account is given of work performed by the author for the purpose of sampling a slime dam on the leases of the North Mount Farrell Co. N.L., at Tullah, Tasmania, during the sum

    Jan 1, 1928

  • AUSIMM
    Some Aspects of Suction Dredge Design

    Important factors in dredge design are the estimation of total head, and the determination of flow in and around suction nozzles and in pipe lines. Total head for the dredge pump is calculated from ve

    Jan 1, 1962

  • CIM
    The Cumberland Basin - A Possible Rift

    By R. D. White

    "The Cumberland Basin of Nova Scotia has long been considered a structural basin by virtue of the elliptical outcrop and inward dip pattern of the Pennsylvanian outcrops. Recent published and unpublis

    Jan 1, 1972

  • NIOSH
    IC 8959 Economic And Technical Evaluation Of The Sulfurous Acid-Caustic Purification Process For Producing Alumina From Kaolinitic Clay

    By Deborah A. Kramer

    An economic and technical evaluation of a proposed process to recover alumina by leaching calcined kaolinitic clay with sulfurous acid is presented in this Bureau of Mines report. After the insoluble

    Jan 1, 1983

  • TMS
    Wax Injection in the Investment Casting Industry

    By Mark R. Jolly, Jean-Christophe Gebelin, Aleksander Cendrowicz

    "Injection of wax patterns is the first stage of the multi-stage process of investment casting. The quality of the final casting and its dimensional accuracy is highly dependent on this stage of the p

    Jan 1, 2001

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • SME
    Regulatory Changes Improve Alaska’s Mining Climate

    By Steven C. Borell

    For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go

    Jan 1, 2004

  • SME-ICGCM
    The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support Design

    By Thomas M. Barczak

    The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a

    Jan 1, 1987

  • IMPC
    Reducing Secondary Environmental Risk from Municipal Solid Waste Incineration

    During incineration of municipal solid waste (MSW), various environmentally harmful elements and heavy metals are liberated partly into bottom ash, and partly carried away with the off-gases and subse

    Jan 1, 2014

  • CIM
    Autogenous and semi-autogenous mill circuits

    By A. K. Ratte, C. M. Brown

    "IntroductionIn autogenous mills, grinding of the ore feed is accomplished by the direct action of the variously sized rocks making up the feed on each other and the mill interior. Size reduction is a

    Jan 1, 1989

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • CIM
    Approximating diamond drill rod wear

    By R. Laplante, P. Radziszewski, P. De Ciccio

    "Predicting the effect of wear can lead to improved control strategies that can possibly minimize the risk of catastrophic failure due to wear while maximizing useable life. In the field of geological

    Jan 1, 2002

  • NIOSH
    RI 9273 - Physical and Computer Modeling of Roof Bolt Systems

    By S. M. Dar

    The U.S. Bureau of Mines constructed a full-scale model of a 15-ft-wide coal mine entry to use in combination with finite-element analyses to investigate roof support systems and various types of roof

    Jan 1, 1989