Search Documents

  • TMS
    CFD Modeling of Solids Suspensions in Stirred Tanks

    By Lanre M. Oshinowo, André Bakker

    "An understanding of the parameters that govern the just-suspended impeller speed, Njs, and the distribution of solids, is critical to the efficient operation of hydrometallurgical and other processes

    Jan 1, 2001

  • AUSIMM
    The Phytoremediation and Phytomining of Heavy Metals

    By B R, R Brooks, R Simcock, R Stewart

    As environmental costs incurred by the mining industry become increasingly subject to critical analysis, new technology is necessary to ensure the further development of good relationships between the

    Jan 1, 1999

  • NIOSH
    Advances In Remote Sensing Techniques For Monitoring Rock Falls And Slope Failures

    By E. L. McHugh, R. T. Mayerle, J. M. Girard

    Ground control problems at surface mining operations can occur for a variety of reasons. Stress, gravity loading, rock strength, geology, pore pressure, weather effects, underground workings, and many

  • AIME
    The Effect Of Water On The Mechanical Properties And Microstructures Of Granitic Rocks At High Pressures And High Temperatures

    By Ove Alm

    Wet and dry specimens of three rocks of approximately granitic composition were deformed at different experimental conditions. These experiments were carried out in order to study the extent to which

    Jan 1, 1982

  • DFI
    Tied-Back Micropile Walls In Landslide Repair

    By Kevin W. Cargill

    In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound

    Jan 1, 2006

  • AUSIMM
    Advanced Grinding Mill Relining Methods

    RME has a vision for a new mill operational paradigm made possible by RMEÆs fast, safe Mill Relining System. This vision can be moved forward into reality at any time with or without guidance from rec

    Jan 1, 2006

  • AUSIMM
    How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge

    By S Strong, L I. Sanz Vivanco, T Brown

    One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast

    Sep 17, 2014

  • DFI
    Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985

    By Donald J. Murphy

    Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in

    Jan 1, 1986

  • AUSIMM
    Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem Database

    By J R. Goff, R Carver, D S. Sheppard

    The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma

    Jan 1, 2006

  • CIM
    Pilot Plant Filtration of Zinc Suspension Roaster Gases Through Glass Fabric

    By R. E. Eyre, L. P. Landucci

    C URRENT practice in the zinc concentrate roasting plant of The Consolidated Mining arid Smelting Company of Canada Limited, at Trail, B.C., involves passing the furnace effluent gases through an elec

    Jan 1, 1962

  • NIOSH
    RI 5038 Operation Of A Powdered-Coal Gasifier At Louisiana, Mo. ? Summary And Conclusions

    By R. G. Dressler

    The design and operation of the Koppers powdered-coal gasifier and its auxiliaries at Louisiana, Mo., are described. This unit was designed to convert 1 ton of coal per hour with oxygen and superheate

    Jan 1, 1954

  • ISEE
    The Journal of Explosives Engineering - Vol 20 No 3 Creating Awareness about Carbon Monoxide - The Silent Hazard

    By Nobel Insurance Service

    [Executive Director’s note: ISEE is committed to continuing its efforts to ensure that blasters be made aware of the issue of migration of carbon monoxide resulting from blasting operations. In the Ju

    Jan 1, 2004

  • AUSIMM
    The dustiness and wettability of very fine Australian coal particles

    By Scales PJ, Ralston J

    Fine coal particles have been examined with respect to dustiness and its connection with various physical and chemical properties. It appears that a given coal will tend to be dusty ifthe moisture con

    Jan 1, 1986

  • AUSIMM
    The Development of the Dudley Seam at Burwood Colliery

    A brief review is given of the history of the Colliery to date together with the reasons for the development of an additional seam.Investigations into the quality of the coal ami its suitability for t

    Jan 1, 1958

  • SME
    Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp

  • IIMP
    Control de vibraciones por disparos en el tajo abierto Mc Cune de Cerro de Pasco

    By Rojas M. Raúl

    Durante el proceso de explotación de la mina Cerro de Pasco y dada la cercanía de la ciudad misma, esta se ha visto afectada por los problemas de vibración del terreno. En este sentido, el objeto del

    Nov 8, 1984

  • AUSIMM
    Some Notes on the Geology of Stannary Hills, North Queensland

    THE following notes were accumulated during the years 1905 to 1911, when the writer was employed at Stannary Hills. The writer's duty took him over the underground workings daily. In odd moments

    Jan 1, 1918

  • AIME
    Institute of Metals Meets

    By AIME AIME

    THE Institute of Metals held a well rounded out symposium on the working of metals, distributed over two sessions. At the first session* four papers were presented, two dealing with the, cold working

    Jan 1, 1931

  • NIOSH
    IC 8673 Estimating Direct Costs Of Development In A Block Caving Mine

    By Nils A. Eilertsen

    This Bureau of Mines report describes the unit cost procedure for estimating direct development costs within a cave block in an undercut block caving mine. Costs of supervision, labor, equipment, and

    Jan 1, 1975

  • SME
    Rock Quality Alteration Surrounding Drifts And An In Situ Leaching Design Using Underground Workings

    By J. L. Ellenberger

    The U.S. Bureau of Mines has cooperated with Cyprus Casa Grande Corporation Cyprus Casa Grande Mine, Cas a Grande, Arizona, since 1988 to assess the hydrology of an in situ leaching test facility. Thi

    Jan 1, 1994