Search Documents

  • AUSIMM
    Lake Cowal Foundation- Environmental and Community Sustainability Beyond the Mine Fence

    By D Johnston

    Within the first full year of BarrickÆs Cowal Gold Mine operation, the Lake Cowal Foundation Limited (LCF) has already been delivering results consistent with its goal to protect and enhance the natur

    Jan 1, 2007

  • SME
    The Candelaria Concentrator Expansion Project

    By D. L. Ogonowski, J. O. Marsden

    The Candelaria copper-gold mine is located approximately 25 km south and east of Copiapo in Region III, Chile. The original concentrator was designed to treat 28,000 t/d (30,800 stpd) of chalcopyrite

    Jan 1, 1999

  • SME
    Development Of An On-Line Coal Washability Analysis System Using X-Ray Computed Tomography

    By G. T. Adel, J. D. Miller, C. L. Lin

    Washability analysis determines the maximum separation efficiency that can be achieved in the operation of coal preparation plants. Unfortunately, there are no on-line techniques for determining this

    Jan 1, 2000

  • ISEE
    The International Society of Explosives Engineers:, A Valuable Resources for the Explosive Industry

    By Jeffrey L. Dean

    Now in its twenty-fifth year, the ISEE has grown to more than 4000 members representing 75 countries. The Society and its 35 chapters in the US, Canada and Australia work to educate the public about o

    Jan 1, 1998

  • CIM
    Coal Quality Estimation using Geophysical Logging Without Radioactive Sources

    By Filipe Beretta

    This study investigates geophysical logging capacity to predict coal quality. It was analyzed for possible correlation, some parameters determined via laboratory analysis of coal against results for t

    Oct 1, 2009

  • AUSIMM
    A Deformed Gold-Arsenopyrite-Pyrite Deposit Hosted in Peralkaline Granite Porphyry at Sams Creek, West Nelson, New Zealand

    By K Faure

    At Sams Creek a gold-bearing, peralkaline granite pophyry dike intrudes Ordovician-Silurian metapelite and quartzite. These metasedimentary rocks have undergone three phases of folding: a first phase

    Jan 1, 2003

  • AUSIMM
    The Golden Cross Mine Underground Development Experience and Practice

    The Golden Cross Mine will be the first underground gold mine in New Zealand to operate since 1952. The development plans, along with the conditions and circumstances presently found in the now ongoin

    Jan 1, 1991

  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010

  • CIM
    High Productivity Zinc Electrowinning Plant

    By M. L. Connolly

    Zinc production by Cominco Ltd. began in Trail in 1916 at a rate of 55 metric tonnes per day (t/d) and was increased ,in several increments until now electrowinning capacity approaches 750 t/d. The la

    Jan 1, 1977

  • IIMP
    Lixiviación ácido bacteriana en pilas o botaderos: una técnica económica para beneficiar minerales marginales de cobre

    By Bonelli A. Julio

    "El presente trabajo señala la lixiviabilidad de los minerales marginales y otros materiales de desecho dentro de la pequeña y mediana minería a traves de la técnica de lixiviación ácido bacteriana y

    Oct 14, 1980

  • NIOSH
    RI 4195 Tests in the Experimental Coal Mine to Determine Requirements for Preventing Propagation of Coal-Dust Explosions in Rooms

    By Irving Hartmann, Bernard Lewis, John Nagy, H. P. Greenwald, H. C. Howarth

    "ORIGIN OF INVESTIGATIONThe Federal Mine Safety Code for Bituminous Coal and Lignite Mines of the United States, July 24J 1946, contains the following provisions with regard to rock dusting: Article V

    Feb 1, 1948

  • CIM
    Recent advances in Canadian coal preparation

    By Brian Raymond

    This paper will outline the problems and solutions of the new generation washeries, as well as the recent technological advances which are being considered for future coal preparation plants. The subj

    Jan 1, 1979

  • SME
    The Hall Street Coal Transfer Terminal In St. Louis: Western Coal To The Mississippi River Via ACBL Western, Inc. ? Introduction

    By James N. White

    Completion of the Hall Street Coal Transfer Terminal in St. Louis marks the beginning of a major shift in the movement of coal to the power generating stations of the Midwest and South Central regions

    Jan 1, 1979

  • IIMP
    La silicosis. Algunas consideraciones sobre su desarrollo y prevención

    By Pedro De Quintana

    El siguiente estudio se basa en un trabajo anteriormente desarrollado en las minas de Quiruvilca por la compañía Northern, donde se efectuó un control radiográfico a sus trabajadores, obteniendo como

    Jul 20, 1956

  • NIOSH
    IC 6552 Mining Laws of Egypt

    By E. P. Youngman

    Gold and precious stones were mined in Egypt in prehistoric times. This mining, carried on at intervals, extended over thousands of years, until about 1300 A. D. Then ensued a dormant period of severa

    Jan 1, 1932

  • AUSIMM
    Arsenic Mobility During Vegetation of Gold Mine Tailings

    By D Craw, C Smith, C Rufaut

    Oceana Gold (NZ) LtdÆs, Macraes Gold Operation currently has two tailings impoundments, the larger of which covers approximately 75 ha. When an impoundment is temporarily out of use, the surface dries

    Jan 1, 2004

  • SME
    Froth Flotation With The Turbo Froth Flotation Column

    By B. J. Arnold, N. Terblanche

    The features of the ‘Turbo’ froth flotation column will be discussed, including the double aeration system that improves flotation yield while not sacrificing grade, the internal launder system, and t

    Jan 1, 2001

  • SME
    Plant Performance Improvements Using Grinding Circuit ?Classification System Efficiency?

    ?Classification System Efficiency (CSE)? is a simple, powerful concept which can be used to measure and improve ball mill circuit efficiency. This paper describes six plant case studies which demonstr

    Jan 1, 2012

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011