Search Documents

  • SAIMM
    Technological Change Yields Beneficial Process Improvement For Low Carbon Ferrochrome At Zimbabwe Alloys

    By N. R. Shoko, J. Chirasha

    Zimbabwe Alloys has been producing Low Carbon Ferrochrome since 1953. A number of operational and technical advances have been made since then. Some of these advances improved production significantly

    Jan 1, 2004

  • SME
    Ventilation and atmosphere control inside a 3-bar compressed air TBM heading

    By B. R. Zernich

    Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec

    Jan 1, 2009

  • CIM
    Arsenic Hydrometallurgy; Fundamentals, Technology and Applications

    By K. D. Mills, R. G. Robins, C. G. Anderson, L. G. Twidwell

    Arsenic is a metalloid which has attracted great environmental scrutiny in recent decades. Moreover, its control and deportment is becoming increasingly important in the metallurgical processing of mo

    Jan 1, 2014

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • AUSIMM
    Separation of Minerals Using Electrical Fields

    Separation of Minerals Using Electrical Fields The mineral processing industry requires alternative separation techniques to help deal with rising energy costs and decreasing ore grades. Dielectropho

    Sep 13, 2010

  • NIOSH
    Using Ultrasonic Anemometers to Evaluate Factors Affecting Face Ventilation Effectiveness (ebe65260-4aab-4939-845f-5e7e1a1d173b)

    By Robert J. Timko, Charles D. Taylor, Edward D. Thimons, Tom Mal

    A test system was developed for measuring airflow in the National Institute for Occupational Safety and Health (NIOSH) ventilation gallery using a three-axis ultrasonic anemometer. The gallery was us

  • SME
    Using Geometallurgical Models To Aid In Metallurgical Testwork For Pre-Feasibility Projects, La Colosa, Colombia

    The La Colosa, Colombia porphyry gold deposit is currently in the pre-feasibility stage. This large deposit has many types of gold mineralization: native gold, electrum, and tellurides. These variatio

    Feb 27, 2013

  • SME
    Haile Gold Mine Metallrgy And Flowsheet Review

    By J. Wickens

    Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through sev

    Feb 27, 2013

  • SAIMM
    Calculation models on the viscosity of the CaO-SiO2-TiO2slag system

    By J. -Y. Jia, G. -B. Qiu, C. -G. Bai, D. -F. Chen

    Due to the great importance of the smelting process, it is essential to establish a calculation model on the viscosity of the slag system containing titania. In this paper, the calculation models of m

    Jan 1, 2004

  • SME
    Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear Programming

    By L. Clark

    Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres

    Jan 1, 2007

  • SAIMM
    Accelerated Kimberlite Weathering - The Role Of Cation Type On The Settling Behaviour Of Fines

    By E. T. Boshoff

    Paper written on project work carried out in partial fulfilment of B. Eng. (Metallurgical Engineering) The weathering of kimberlite can be accelerated with cations in solution if swelling of the ki

    Jan 1, 2005

  • NIOSH
    OFR-40-74 Helix Pressure Gauge To Indicate Roof Bolt Loads

    A Helix Pressure Gauge to Indicate roof bolt loads was designed, fabricated and field tested. The gauge indicated loads between 3,000 and 15,000 pounds with a ± ten per cent error. The coat of fabrica

    Jan 1, 1974

  • SME
    Port of Miami Tunnel Update?A View From Design Builder?s Engineer

    By Wern-ping Chen

    Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn

  • AIME
    Korea - Industrial Growth Surges - Mining Sector Small, But Building

    By John V. Beall

    Monotonous flood planes flanked either side of the road as we drove in the embassy car from the airport to downtown Seoul. We crossed the brown waters of the Hann River, meandering over mud flats. A g

    Jan 8, 1969

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • SME
    Use Of Geologic Parameters For The Development Of Low-Grade Copper Reserves, Silver Bell Mine, AZ

    By Q. J. Browne, M. A. Miller

    Silver Bell produces about 22,000T of fine copper annually from low-grade chalcocite and oxidized copper ore that is recovered by sulfuric acid leaching and SX-EW processing. The current mineable res

    Jan 1, 2002

  • CIM
    The use of Personal Computers at Kidd Creek for Process Data Monitoring and Analysis

    By Gordan Marrs, O. Matwijenko

    "The Kidd Creek metallurgical site has been highly integrated to maximize revenues from its base metals mines. The site's operations include a Concentrator processing 4.3 million tonnes per year of co

    Jan 1, 1989

  • SME
    Life Of Mine Schedule From Multiple Pits: A Case Study For The Tenke Fungurume Mining District

    By R. Benito

    This paper describes the development of a life of mine schedule (LOM) for one of the world?s largest known sedimentary Copper-Cobalt districts located in the Katanga Province, Democratic Republic of C

    Jan 1, 2011

  • AUSIMM
    Hydrothermal Mineralisation in Northeast Striking Fault Zones, Otago Schist

    By D Craw, J Becker

    Post-metamorphic structural evolution of Otago Schist resulted in a pattern of northwest and northeast striking faults and fractures cutting the basement rocks. These faults have been reactivated seve

    Jan 1, 1998

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007