Search Documents

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • AUSIMM
    The Determination of Fe, Si and Al Content in Iron Ore Blastholes by Nuclear Logging

    By A Rojc, J Ronaszeki, C Smith

    Nuclear logging was tested for the in situ determination of Fe, Si, and Al in iron ore blastholes with field tests at the BHP Billiton Iron Ore, Mount Waleback Mine. Prompt gamma neutron activation an

    Jan 1, 2002

  • SME
    Coal Quality And Resources In The Us Gulf Coastal Plain

    By J. C. Willett, J. R. Sanfilipo, P. D. Warwick

    The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen

    Jan 1, 2001

  • SME
    After 50 Years, SME Remains World’s Premier Professional Mining Association

    By Steve Kral

    The Society for Mining, Metallurgy and Exploration’s origins can be traced back to 1871. This was when 22 Pennsylvania coal mining engineers founded the American Institute of Mining Engineers (AIME).

    Jan 1, 2007

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • SME
    New Approach Of ASFINAG For Tunnel Construction Monitoring Of The Tauern Tunnel Project In Austria

    By Robert Schnab

    ASFINAG is responsible for the construction and operation of the Austrian highway system. It is approx. 2,400 km of highways and 65 tunnels with a total length of 200 km including the Tauern Tunnel.

  • AUSIMM
    Development of Grindability Tests Based on Direct Measurement of Energy

    Development of Grindability Tests Based on Direct Measurement of Energy Nowadays, for the characterisation of the grindability different grindability indices - Bond-work index (Wi), Hardgrove Grindab

    Sep 13, 2010

  • RMCMI
    The Future of Coal

    Disclaimer ?You may hear something today that surprises you. If you are pregnant or have a heart condition, you may elect to stop hearing now. ?Some of what you are about to hear you may alrea

    Jan 1, 2006

  • ISEE
    Journal: An Overview of Industrial Explosives in Japan

    By Yoshikazu Hirosaki

    How big or small is the Japanese explosive market? Who are the major explosive customers? Is there any big construction project in which a large amount of explosives is expected? What is the future of

    Jan 1, 2001

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • AUSIMM
    Effect of Anionic Surfactant on Silica Particle Attachment at the Oil-Water Interface

    Effect of Anionic Surfactant on Silica Particle Attachment at the Oil-Water Interface Controlling particle attachment is crucial where powdered solids come into contact with oil and water. Particles

    Sep 13, 2010

  • SME
    A study of total dynamic analysis method for deepseabed integrated mining system

    By Hyung-woo Kim, Sup Hong, Sung-Soo Kim, Chang-Ho Lee

    A deep-seabed integrated mining system, which consists of four subsystems such as riser pipe, buffer, flexible riser, and tracked vehicles, is presented in Figure 1. In order to collect more manganese

    Sep 1, 2014

  • SAIMM
    Foaming Of Model Slags Containing V2O5 Under Dynamic Conditions

    By M. Görnerup, A. Kapilashrami, Seetharaman. S., A. K. Lahiri

    Simultaneous reduction and foaming of chromium-rich slag have been studied in a laboratory furnace equipped with X-ray image analysis. Reduction of the metal oxides by graphite generated CO, which cau

    Jan 1, 2004

  • SME-ICGCM
    Appropriate Mining System for Residual Coal Around End?slopes in Chinese Surface Coal Mines

    By Takashi Sasaoka

    A great deal of coal will be left under the final end-walls in Chinese surface coal mines because of lower slope angle in shoveltruck mining systems and larger mining depths. In traditional surface mi

    Jan 1, 2013

  • SME
    DC Water First Street Tunnel – Integrated Engineering and Construction

    By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda

    "INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob

    Jan 1, 2016

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • SME
    Design Of Yieldable Tunnel Supports For Creeping Rocks (PRIPRINT 94-76)

    By N. D. Cristescu

    The aim of the present paper is to show how a mathematical modeling of a creeping rock and that of an yieldable lining can allow us to obtain an optimization of the lining design and generally of the

    Jan 1, 1994

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010

  • CIM
    ERG Tailings Retreatment Project

    "INTRODUCTIONGold tailings retreatment plants have been operated for many years throughout the world. Several large tailings retreatment facilities have been operated profitably in South Africa since

    Jan 1, 1989

  • AUSIMM
    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Sep 13, 2010