Search Documents

  • CIM
    Overview of the Agrium Kapuskasing phosphate operation

    By R. Pressacco

    "IntroductionAgrium’s history in fertilizer production and marketing goes back to 1931. Today, Agrium Inc. is a world leader in the production, distribution, and marketing of fertilizers and related p

    Jan 1, 2001

  • CIM
    Government and the Mining Industry

    By Allan F. Lawrence

    "I AM SURE you do not expect from me any learned dissertation on the problems and opportunities of the mining industry. Y our program committee must have recognized my limitations when issuing the inv

    Jan 1, 1968

  • IMPC
    The Mine of the Future: Will it be Visible? (XXII International Mineral Processing Congress)

    By Robin B. Batterham

    "Since the 1970?s we have seen a marked corporate response in terms of the environment. In part this has come from regulation but it has largely come from stakeholders and the community. Rising expe

    Jan 1, 2003

  • IOM3
    Geology and geochemistry of Iperindo primary gold deposit, Ilesha schist belt, southwestern Nigeria

    By G. M. Steed, A. O. Oyinloye

    The deposit lies in amphibolite-facies biotite granite-gneisses of Proterozoic age, 4 km east of a major crustal break known as the Ifewara-Zungeru fault. Gold mineralisation is contained in a zone of

    Apr 1, 1996

  • ISEE
    Subdrill – The Underutilised Blasting Parameter

    By Stephen Mansfield

    In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable

  • SME
    Estimation Of Capital And Operation Costs Of Backhoe Loaders

    By B. Oraee

    Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are

    Jan 1, 2011

  • NIOSH
    OFR-52-77 Alternate Conveyor Design For Mine Machinery

    By James H. Snyder

    This final report presents results of a program to develop a new conveyor system, adaptable to existing miners or loaders, which reduces the noise level to 90 dBA without reducing machine performance.

    Jan 1, 1976

  • AUSIMM
    Deterministic Expert Systems : A New Planning Tool for Project Development

    Project developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv

    Jan 1, 1989

  • NIOSH
    OFR-41-77 Digital Computation Of Transients And Safety Testing Of Mine Electrical Power Systems

    By Eldon Keith Stanek

    This annual report deals with four distinct tasks related to research on the safety and reliability of mine electrical power systems. Task one is to develop tests and the associated instrumentation to

    Jan 1, 1976

  • SME
    Utilization Of Spent Potliners As A Fluidizer

    By S. Shrivastava, R. G. Reddy

    Spent potliner is generated in the electrolytic process of reducing alumina to make aluminum metal using molten fluoride electrolytes. Spent potliner (SPL), obtained at the end of the pots life contai

    Jan 1, 1999

  • SME
    Assessing Small Underground Coal Mines For High Safety-Related Risk

    By H. Kinilakodi

    In 2008, the authors developed a methodology for assessing underground coal mines for high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated wi

    Jan 1, 2011

  • NIOSH
    OFR-161(4)-82 Probabilistic Modeling Of Tailings Embankment Designs - Volume II - Model Application And Verification

    By Loren R. Anderson

    A probabilistic slope stability computer model was developed at Utah State University and independently evaluated by CH2M Hill Consulting Engineers as a design and analysis tool. Volume I of this repo

    Jan 1, 1982

  • CIM
    The Lignite Deposit at Onakawana, Moose River Basin, Ontario

    By W. S. Dyer

    The lignite deposit at Onakawana on the Abitibi river is of particular interest at the present time, since the Ontario Government has recently decided to proceed with the extension of the Temiskaming

    Jan 1, 1930

  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • AUSIMM
    Teaching Geoscience in the 21st Century

    By Robinson KJ

    Education in Australia now has to respond to a very wide political and policy agenda. The political emphasis is upon increasing participation and retention rates with a view to greater graduation r

    Jan 1, 1989

  • AUSIMM
    Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited

    The addition of cement to underground backfill at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill commenced in 1967. A deterioration in metallurgical performance at

    Jan 1, 1971

  • CIM
    Geochemistry of the Platinum-Group Elements

    "4.1. IntroductionThis chapter reviews the geochemistry of the platinum-group elements (POE) in sulphur-poor silicate rocks, and the limited data on POE in silicate, oxide, sulphide, arsenide and sulp

    Jan 1, 1979

  • NIOSH
    Numerical Analysis Of The Impact Of Longwall Panel Width On Methane Emissions And Performance Of Gob Gas Ventholes

    By C. O. Karacan, S. J. Schatzel, W. P. Diamond

    In coal mining, longwall mining is a preferred method to maximize production by extracting large blocks of coal that have been outlined with a set of development entries. In U.S. mines, longwall pane

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • SME
    Elm Road Generating Station Water Intake Tunnel

    By Brendan Reilly, Jon Isaacson, Paul McDermott

    Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.

    Jan 1, 2007