Search Documents

  • DFI
    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • NIOSH
    IC 9503 - Explosion Hazards From Methane Emissions Related To Geologic Features In Coal Mines

    By James P. Ulery

    Explosions in U.S. coal mines have caused death and injury to miners and destruction of workings since the first reported explosion in 1810. These explosions are caused when buildups of explosive gas

    Jan 4, 2008

  • IIMP
    El proyecto Reformin: apoyo a la minería en Bolivia

    By Lise Chénard

    El presente texto señala los lineamientos del proyecto REFORMIN, así como su repercusión en la dinámica de promoción de la industria minera. REFORMIN surge en el 2001 como un proyecto bilateral entre

    Apr 22, 2003

  • AUSIMM
    Towards More Sustainable Minefills - Replacement of Ordinary Portland Cement with Geopolymer Cements

    By G F. Brent, R D. Hart, C Carr, F Felipe

    In underground operations, where copper, gold and other metals are mined, the open stopes can be backfilled to stabilise surrounding workings. This fill may consist of tailings from the processing pla

    Jan 1, 2007

  • NIOSH
    OFR-8-73 Evaluation Of Methanometry In Coal Mines

    By Ralph D. Gift

    This report describes a program of research to evaluate methanometry in coal mines. The program commenced by conducting an extensive state-of-the-art survey. Details of the survey are presented which

    Jan 1, 1972

  • AUSIMM
    A Geographic Information System for the Coromandel Region

    By D N. B Skinner, R L. Brathwaite, M S. Rattenbury

    The Institute of Geological and Nuclear Sciences is undertaking a mineral resource assessment study of the Coromandel region, due for completion in July 2000. A key part of the study is the assembly o

    Jan 1, 1999

  • IIMP
    Análisis y diseño geomecánico de excavaciones mineras subterráneas por el método de los elementos finitos: caso práctico en Gran Minería

    By Fredy Rijalba Palacios

    "El presente texto señala el proceso de ingeniería donde se evalúa y modeliza la distribución de los desplazamientos y la interacción de la geomecánica de las cámaras de explotación. La modelización s

    Oct 1, 2016

  • DFI
    Ground Improvement for New Jersey Turnpike Interchange 14A: A Case Study

    By Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed

    "Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons

    Jan 1, 2017

  • AUSIMM
    Boddington Gold Mine - An Example of Sustaining Gold Production for 30 Years

    By G Veillette, B Parker, S Hart

    This paper provides a history of the challenges that were experienced while treating both the clayey oxide gold ores and the supergene copper-gold ores at the Boddington Gold Mine during the period 19

    Jan 1, 2007

  • CIM
    1-Rock-Bursts at the Teck-Hughes Mine

    By J. D. Christian

    WHEN mining development began in the Kirkland Lake camp, twenty-five years ago, there was very little information obtainable from surface showings as to the nature of the ore deposits. A length of alm

    Jan 1, 1939

  • CIM
    Critical Life Support Elements and Considerations for Refuge Chambers in Mining Projects

    By J. R. Rau

    While refuge chambers are common place in most underground mining projects, there are different philosophies as to what life support systems are to be considered and how these systems are to be applie

    Aug 1, 2013

  • IOM3
    Simply the Best; Presidential Address to the South Western Branch of IMinE

    By G Williams

    Discussing equipment, systems of work, the need for updated programmes of local seismic exploration, and developments within the South Wales coalfield.

    Jan 1, 1993

  • AUSIMM
    Epithermal Mineralisation - New Zealand's Leadership

    In the last 40 years, New Zealand has developed a number of liquid- dominated geothermal steam fields, for electricity generation and indus- trial process steam. New technologies were developed, and i

    Jan 1, 1988

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • CIM
    Large-scale panel destress blast at Brunswick mine

    By B. P. Simser, R. K. Brummer, A. Mortazavi, P. P. Andrieux

    "A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically important neighbouring mining region. This work, sponsored by

    Jan 1, 2003

  • NIOSH
    OFR-14-76 Data Flow Requirements For Remote Supervisory Control Of Continuous Mining Machines - I. Introduction - A. Summary - 1. Objective

    By Harvey L. Pastan

    The purpose of the investigation and analysis described in this report is to assess the data flow requirements that are required for remote supervisory control of a continuous mining system. Since the

    Jan 1, 1975

  • NIOSH
    OFR-137-78 Early Detection Of Incipient Combustion Through Nucleation Properties Of Particulate Emissions

    By Z. Zborovszky

    The feasibility of using the nucleation properties of combustion generated particulates for the identification of their sources was investigated, using the Cloud Condensation Nuclei (CCN) Spectrometer

    Jan 1, 1978

  • DFI
    Instrumentation Of Construction Vibrations

    By Mark R. Svinkin

    Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c

    Jan 1, 2002

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • NIOSH
    RI 9553 - Detection and Control of Spontaneous Heating in Coal Mine Pillars - A Case Study (9cb57d45-0908-4664-a9f2-95d0edef2afa)

    By Robert J. Timko

    This U.S. Bureau of Mines study examined spontaneous heating episodes in coal mine pillars in an active underground coal mine. The information obtained from these incidents was then analyzed to learn

    Jan 1, 2010