Search Documents

  • SME
    Challenges in Adapting Tunnel Construction Contracts to Actual Ground Conditions

    By Lena Paar

    "Underground construction poses certain challenges for all parties involved because the actual ground conditions are often unpredictable. Highly complex projects like tunnel construction are affected

    Jan 1, 2016

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • SME
    The Dynamic Response of the Taru-Toge Tunnel during Blasting

    By M. Soya, M. Imazu, Ö. Aydan

    "SUMMARY Taru-Toge tunnel is being constructed using drilling-blasting technique as a part of expressway project connecting Shin-Tomei Expressway and Chuo Expressway at the boundary of Shizuoka and Ya

    Jan 1, 2016

  • SME
    Micro-Pricing: The Value of Trace Rare Earth Elements in Coal and Coal Byproducts

    By A. Noble

    "A supply of sustainably sourced rare earth elements (REEs) is critical for several high-tech industries, renewable energy technologies, and defense applications. Recent studies have shown that REEs e

    Jan 1, 2016

  • SME
    Tunneling Under the Norris Cut Channel - World Firsts to Overcome the Adverse Ground of Miami

    By Boris CARO VARGAS, Bernard Theron

    "In early 2014, Nicholson Construction Company was awarded, together with its tunneling sister company Bessac, the Norris Cut Miami Tunnel Project. The 2.5-meters diameter segmental lined tunnel, 1600

    Jan 1, 2016

  • CIM
    Viability of Phosphogypsum as a Secondary Resource of Rare Earth Elements

    By V. Bazhko, V. Yahorava

    The calcium sulphate waste stream of the wet phosphoric acid process, commonly called phosphogypsum (PG), contains the majority of rare earth elements (REE) initially present in the apatite feedstock.

    Jan 1, 2016

  • SME
    The Caltanissetta Twin Tunnel: Segmental Lining Design and EPBS TBM Performance during the Construction of the 4km-Long ø15.08m Tunnel

    By Ivano Andreis, Georgios Kalamaras, Mario Liti, Sebastiano Pelizza, Filippo Avesani

    "THE SS640 AGRIGENTO-CALTANISSETTA PROJECT The Caltanissetta tunnel is part of the works for the construction of the second 28km-long maxi section of the SS 640 motorway of Porto Empedocle, from km 44

    Jan 1, 2016

  • CIM
    Economical Rare-Earth Extraction with Due Environmental Concern

    By Peter Broad

    "Extracting any metal, especially specialty metals and rare earth elements, requires an in-depth analysis of the costs and potential revenue as well as a due diligence study of other stakeholder inter

    Jan 1, 2016

  • SME
    Artisanal Miners and Their Social and Environmental Situation in Colombia

    By J. Diaz

    "Antioquia region, in Colombia, is considered one of the areas with the highest mercury contamination in the world due to its use in gold recovery through artisanal mining, emissions to the environmen

    Jan 1, 2016

  • DFI
    Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier Walls

    By R. Lee Wooten, David R. Shields, Darren D. Clark

    "Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con

    Jan 1, 2016

  • CIM
    Modeling of Realistic Microstructures as Key Factor for Comminution Simulations

    By Michael Klichowicz, Holger Lieberwirth

    "For a detailed prognosis of mineral comminution processes, simulation tools like DEM still pose various challenges. Less realistic mineral structures can affect the results of simulation models such

    Jan 1, 2016

  • CIM
    Effect of Fe Ions Produced During Mild Steel Milling on Floatability of Different Ores

    By K. C. Corin, Z. G. Song, J. Y. Liu, M. W. Zhang, State Key Laboratory of Mineral Processing-BGRIMM, J. G. Wiese

    "In the present study effect of grinding media on flotation of two mineral systems have been investigated, viz. sulphide minerals (including a pure chalcopyrite and pyrite mineral, and two different b

    Jan 1, 2016

  • SME
    The Planning for Ultra Long Subsea Tunnel Project under High Water Pressure

    By Jung-Hum Lee, Young-Joon Lee, Eui-Joon Hong, Seon-Hong Kim, Chan-Dong Kim, Keon-Woong Jeong, Ki-Lim Kim

    "Subsea tunnel needs to be built over 50km long to connect between nations and continents. However there are only 19 tunnels longer than 5km in Korea, and there is no history of constructing and opera

    Jan 1, 2016

  • SAIMM
    Implications of Collecting Additional Data for Slope Design in an Open Pit Operation

    By M. -H. Fillion

    "Geotechnical stability analysis and design in open pit mines requires access to representative geological, structural, hydrogeological, and rock mass models. The quality and quantity of collected geo

    Jan 1, 2016

  • SME
    Applying the Mixture of Mine Tailings and Fly Ash as Construction Material

    By Q. Feng

    "Efforts have been tried to apply the mixture of mine tailings and fly ash as construction materials. Through the present investigation, a protocol to make construction materials using the mixture of

    Jan 1, 2016

  • SME
    Choice of Pumping Pressure in Pre-Grouting in Scandinavian Tunneling Projects

    By Håkan Stille, Jalaeddin Y. Rafi, Fredrik Johansson

    "INTRODUCTIONIn tunneling projects, pre-grouting is performed with the purpose of establishing an impervious zone around the tunnel periphery. This is obtained by reducing the penetrability of the mos

    Jan 1, 2016

  • SME
    DC Water First Street Tunnel – Integrated Engineering and Construction

    By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda

    "INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob

    Jan 1, 2016

  • ISEE
    Impact-Induced Fragmentation of Rock and Size Distribution Analysis

    By Bibhu Mohanty, Sheng Huang

    Accurate measure of fragment size distribution is a key objective in all blasting and crushing operations. Several generic distribution functions have been devised to describe the degree of fragmentat

    Jan 1, 2016

  • SAIMM
    The Influence of Particle Size Distribution on the Properties of Metalinjection- Moulded 17-4 PH Stainless Steel

    By M. Seerane, R. Machaka, P. Ndlangamandla

    "Metal injection moulding (MIM) is a near-net-shaping powder metallurgy technique suitable for the cost-effective mass production of small and complex components. In this paper, the effects of the met

    Jan 1, 2016

  • CIM
    Using Atomic Force Microscopy (AFM) and Scaling Analysis to Monitor Surface Roughness Characteristics of Industrial Zinc Electrodeposits.

    By Jose Alberto Gonzalez, Said Sharif Mahboob, Jeffrey L. Shepherd

    "During the industrial electrowinning of zinc, uneven growth can cause short-circuits and make the deposits more sensitive to the presence of impurities that can significantly impact current efficienc

    Jan 1, 2016