Search Documents

  • SME
    Calibration of LaModel In-Seam Material Properties for Underground Stone Mine Benching Operation by Employing Brittle Failure Criteria in FLAC3D

    By Alim Elibol, Rosbel Jimenez, Mustafa Can Suner, Deniz Tuncay, Zach Agioutantis

    LaModel is a displacement-discontinuity variation of the boundary element method, which is utilized to analyze the displacement and stress in flat-lying, tabular orebodies. In coal mining, the accurac

    Jun 25, 2024

  • SME
    Evaluation of Multiple-Seam Scenarios by Non-Traditional Methods

    By S. E. Phillipson

    The MSHA Technical Support, Roof Control Division's primary evaluation tool for coal pillar designs is the Analysis of Coal Pillar Stability (ACPS) program. However, ACPS is limited to evaluating inte

    Jun 25, 2024

  • SME
    ICGCM China—History, Networking, and Education

    By Syd Peng, W. B. Guo, F. Du, L. Yang, J. Yw. Cheng

    The annual ICGCM China was initiated in 2014. Up to 2023, ICGCM China has been held 9 times. In the 9 conferences during the past 10 years, about 559 papers in 17 topical areas were presented and atte

    Jun 25, 2024

  • SME
    Polyurethane Foam and Alternatives for Void Filling Applications

    By Delbert Hamilton, Christopher Snyder

    In the last three years there have been four uncontrolled heating events in mines that have been attributed to the use of polyurethane foam as a void fill product. These heating events are due to the

    Jun 25, 2024

  • SME
    Numerical Study on Mining-Retention Ratio Optimization in Underground Solid Potassium Salt Mine

    By Jin Zhao, Weijie Wei, Jinwang Zhang, Xiaohang Wan, Shengli Yang

    Reasonable mining-retention ratio (ratio of room width to pillar width) is vital to recovery rate and stope stability in underground mining of solid potassium salt deposits. Based on the engineering b

    Jun 25, 2024

  • SME
    NIOSH Gas Well Stability Research: A Summary of Ground Control Engineering Considerations

    By Peter Zhang, Daniel Su, Bo Kim, Berk Tulu

    This paper summarizes significant findings from the ongoing NIOSH Gas Well Stability research over the past decade; in particular, the important ground control engineering considerations. Longwall-ind

    Jun 25, 2024

  • SME
    Research on Microseismic Passive Velocity Tomography Based on Template Matching Technology

    By Shawn Boltz, Erik Westman, Derrick Chambers, Xingdong Zhaoa, Qiankun Zhua

    Microseismic passive velocity tomography is becoming an effective technology for large-scale mining-induced stress monitoring in underground mines, especially in the field of early warning of mining-

    Jun 25, 2024

  • SME
    Full NAT 2024 Proceedings - NAT2024

    By SME SME

    NORTH AMERICAN TUNNELING 2024 PROCEEDINGS

    Jun 23, 2024

  • SME
    P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024

    By Jerry Luttman, Mark Dubay, Anvesha Dogra, Elizabeth Dwyre, Wei Hu

    The I-75 Modernization Project (Segment 3) just north of Detroit, MI is being delivered as a Design-Build-Finance-Maintain (DBFM), which is a Public Private Partnership (P3). The project includes desi

    Jun 23, 2024

  • SME
    LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024

    By Alix Thierart, Yann Rouillard, Bernard Catalano

    Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages. Bessac

    Jun 23, 2024

  • SME
    BIM for Conventional Tunneling: The Sotra Link Project in Norway - NAT2024

    By Andrea Biagi, Elisa Comis, Gianluca Bella, Enrico De Panicis, Guido Barbieri, Matteo Giani

    The Sotra Link Project is a major infrastructure project in Norway involving the design, construction, financing and maintenance of several underground and surface structures between Sotra island and

    Jun 23, 2024

  • SME
    Slurry Shield Cutterhead Torque Characterization Using AI Machine Learning and Mechanics-Based Modeling - NAT2024

    By Hongjie Yu, Rakshith Shetty, Claudio Cimiotti, Nick Karlin, Mike Mooney, Vitaly Proshchenko, Matt Kendall

    This paper documents an effort to explain cutterhead torque behavior observed during slurry pressure balance TBM tunneling through soft ground on the Los Angeles Clearwater project. AI machine learnin

    Jun 23, 2024

  • SME
    Reconnecting Urban Landscapes Through Highway Lidding and Tunneling: A Comprehensive Study on Methodologies, Benefits, and Safety Considerations - NAT2024

    By Bernd Hagenah, Katie Theis, Cristina Lauzon, Petr Pospisil

    Lidding over or tunneling existing transportation infrastructure is currently under review in several U.S. cities. The main reasons for this are the use of the created space for urban development, the

    Jun 23, 2024

  • SME
    Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024

    By Irwan Halim, Stephane Polycarpe, Brian Hann

    The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi

    Jun 23, 2024

  • SME
    Construction Phase Services for Australian and North American SEM Tunneling - NAT2024

    By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim

    Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s

    Jun 23, 2024

  • SME
    JWPCP Effluent Outfall Tunnel in Los Angeles, California— Anticipated Challenges and Slurry TBM Performance in the Soft Ground Section of the Alignment - NAT2024

    By Martino Scialpi, Miriam Piemontese, Claudio Cimiotti, Matt Kendall, Nicholas Karlin, Roberto Schuerch

    The Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to the White Point Manifold. Upon completion

    Jun 23, 2024

  • SME
    Application of the Observational Method in the T-48 Tunnel Project in the Himalayas - NAT2024

    By Anuradha Khetwal, Sandeep Khetwal, Andrea Panciera

    The observation method is a design optimization approach for the drill and blast method in tunneling. This method includes first identifying the hazard scenarios through site investigation, formulatin

    Jun 23, 2024

  • SME
    Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024

    By Christian Heinz, Doug Harding

    TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa

    Jun 23, 2024

  • SME
    Durability Design and Construction for Underground Facilities - NAT2024

    By Wern-Ping Nick Chen

    Durability risks for underground facilities can be underestimated during design phase as compared to well-known geological risks. However, unclear durability requirements can result in construction sc

    Jun 23, 2024

  • SME
    Remediation of the Falls of Ground in a Water Conveyance Tunnel - NAT2024

    By Amir Karami, Scott Munro

    This paper focuses on remediation of a 3.6 km long water conveyance tunnel that suffered two large falls of ground (FoGs), one of which subsequently progressed to the ground surface, resulting in full

    Jun 23, 2024