Search Documents

  • NIOSH
    Surface Of Underground Coal Mine Fires

    By Maria I. De Rosa

    Table 10 and figure 4 show the number of fires and fire injuries occurring at the surface of underground coal mines by state during 199&1999. Table 10 also shows by state the risk rate, employees&apos

    Jan 1, 2004

  • AUSIMM
    Natural Rehabilitation of Shag River Catchment, East Otago, After Historic Gold Mine Tailings Discharges

    By A Black, J H. Youngson

    At least 85 000 tonnes of mine tailings were discharged into Deepdell Creek, east Otago between 1890s and 1940s. The tailings contained about 1 wt % arsenic, so about 850 tonnes of arsenic in the form

    Jan 1, 2004

  • AUSIMM
    Developments in Steel Recycling Technology

    By Y Pan

    The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc

    Jan 1, 2004

  • AUSIMM
    Managing the Transition from Exploration to Feasibility and Project Development

    The transition from exploration to feasibility is a stage in the development of mineral resource projects that is frequently not handled well. The transition marks a point in the project development p

    Jan 1, 2004

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • SME
    Equipment Maintenance – Tips on Maximizing Mining-Equipment Engine Life

    By Reginald Dias

    Mining equipment life may be extended through preventive maintenance and the proper application of quality lubricants. There are several practices mine operators should consider implementing to prese

    Jan 1, 2004

  • SME
    Industrial Minerals 2003

    Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committees

    Jan 1, 2004

  • CIM
    Column Flotation in an Oilsand Application

    By Kim Wiwchar, Elizabeth Mbaja, Lynne Dang, Jim Furey, Anita Marks

    "Suncor Energy Inc., located north of Fort McMurray, Alberta, commenced pilot scale operation using a CPT 4’ diameter flotation column in March 2003. This larger scale trial follows two previously suc

    Jan 1, 2004

  • SAIMM
    Development Of Alternative Techniques For Matte Level Measurements In Sulphide Smelting Furnaces

    By B. van Beek, J. Ndlovu, K. T. Hara, J. M. A. Geldenhuis

    This paper describes the development of an alternative technique for measuring the matte level height in sulphide smelting furnaces. The initial studies involved applying electrochemical oxygen probes

    Jan 1, 2004

  • SAIMM
    Application Of A High-Intensity Cooling System To DC-Arc Furnace Production Of Ferrocobalt At Chambishi

    By L. R. Nelson

    A review is presented of the furnace cooling system design and operating developments since the initial furnace start-up in January 2001 of the Chambishi DC-arc furnace to produce ferrocobalt alloy. T

    Jan 1, 2004

  • DFI
    Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)

    By Joint Micropiles Committee

    "The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • SAIMM
    Freeze Lining On M12 Furnace: Motivation, Installation And Operation

    By A. M. Hearn, J. R. Henning, A. S. J. Van Rensburg

    The lining, together with the electrodes, forms the heart of the operation of a submerged arc furnace. Subsequent to a lining failure on M12 furnace during the early 1980s, Metalloys was active in in

    Jan 1, 2004

  • NIOSH
    Whole-body vibration and postural stress among operators of construction equipment: A literature review

    By N. Kumar Kittusamy

    Operators of construction equipment perform various duties at work that expose them to a variety of risk factors that may lead to health problems. A few of the health hazards among operators of constr

    Jan 1, 2004

  • SME
    Administrative Controls For Reducing Worker Noise Exposures (SME Annual Meeting Feb. 23-25, Denver, Colorado)

    By D. R. Babich, E. R. Bauer

    Noise-Induced Hearing Loss (NIHL) continues to be a concern of the mining industry. A new noise standard (30 CFR, Part 62) is aimed at reducing NIHL in mining through engineering and administrative n

    Jan 1, 2004

  • SME
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en

    Jan 1, 2004

  • ISEE
    SEE Education Foundation (Scholarship Awards - 2004)

    By N/A N/A

    Aw a rd winners from the University of MissouriRolla. Back row from left: Seok Bin Lim, Chris B o l l i n g e r, Adam Kre s l e r, Scott Geer, Joseph Cohn, and James (Buck) Hawkins; Front ro w f rom l

    Jan 1, 2004

  • SME
    A Study Of Heat Stress Exposures And Interventions For Mine Rescue Workers

    By F. Varley

    Researchers from the National Institute for Occupational Safety and Health (NIOSH), in cooperation with mine operators, conducted a study of heat stress exposures among mine rescue workers in undergro

    Jan 1, 2004

  • CIM
    Deep shaft hoisting at LaRonde —The Penna shaft hoisting plant

    By B. McLaughlin

    Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl

    Jan 1, 2004

  • TMS
    Treatment Of Transition Metal Oxide Wastes By Plasma Driven Electrolysis

    By Patrick R. Taylor

    Keywords: Thermal Plasma, Electroreduction, Electrolysis, Transition metals, Waste treatment, Molten oxides, Chromium oxide. An innovative process to treat transition metal oxide waste materials f

    Jan 1, 2004