    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SAIMM
    Phase Equilibria In K2O-Containing Manganese Smelting Slags

    By S. Ganguly

    Slag samples taken from adjacent to the furnace wall of a submerged arc ferromanganese smelting furnace have been found to contain high concentrations of K2O. To characterize the phase equilibria rele

    Jan 1, 2007

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • SME
    After 50 Years, SME Remains World’s Premier Professional Mining Association

    By Steve Kral

    The Society for Mining, Metallurgy and Exploration’s origins can be traced back to 1871. This was when 22 Pennsylvania coal mining engineers founded the American Institute of Mining Engineers (AIME).

    Jan 1, 2007

  • SAIMM
    Sampling - A Critical Component To Gold Mining Project Evaluation (60ce14f9-844a-41ea-89be-138917950365)

    Poorly designed sampling protocols generally result in high project risk by artificially increasing grade variability (ie the nugget effect). Sample collection, preparation and assay protocols that su

    Jan 1, 2007

  • AUSIMM
    Quality Assurance and Quality Control of the Interpretation of the Geological Economic Commodity Concentrations is Important in Getting a Mineral Resource Estimate Right

    The mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla

    Jan 1, 2007

  • SME
    Guidance for Partial Face Excavation Machines

    By Jochen Belz, Allan Henneker, Nod Clarke-Hackston

    For the construction of tunnels and other underground structures, extraction of the exact amount of material is of paramount importance both economically and for engineering purposes. In the Sequentia

    Jan 1, 2007

  • SME
    The 1990’s – Politics and the Environment

    By Georgene Renner

    At the beginning of the 1990s, Communism fell and signaled the end of the Cold War. The world rejoiced but also watched and waited to see how those countries would restructure themselves. The 1990

    Jan 1, 2007

  • CIM
    The Noranda continuous converter at Xstrata Copper, Rouyn-Noranda— optimization of slag chemistry

    By M. Zamalloa, P. J. Mackey, P. Coursol, Y. Prévost

    "Over the last decade or so, the availability of commercial thermodynamic modelling packages, such as FactSageTM, have been utilized to help the plant optimize slag chemistry and to minimize slag hand

    Jan 1, 2007

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • CIM
    Combustion Synthesis of TIC/Al2O3 Composite and its Oxidation Behaviour

    By Z. I. Zaki

    Synthesis of TiC /A1203 Composite from TiO2, Al and graphite using combustion technique has been investigated at different initial temperatures; room, 400 and 600 °C. The effect of initial temperature

    Jan 1, 2007

  • SME
    Modeling For Real-Time Performance Measurement: A Strategic Approach

    By Russell Barr, Robert E. Cook

    As most mining companies are taking advantage of the high market prices for base metals such as steel, copper and zinc, numerous challenges still face them. While demand is strong from countries like

    Jan 1, 2007

  • AUSIMM
    The Myth of Dangerous Human-Caused Climate Change

    Human-caused global warming has become the environmental cause celebre of the early 21st century. The strong warming alarmist camp currently includes the United Nations, most Western governments, most

    Jan 1, 2007

  • ISEE
    Numerical Modeling of the Effect of High Stresses on Blast Induced Damage

    By A. S. Tawadrous

    The stress field around a detonating charge in a borehole was calculated using AUTODYN for a variety of in-situ stress conditions. Calculations were conducted for zero in-situ stress, hydrostatic cond

    Jan 1, 2007

  • SME
    Ergonomic Interventions At Vulcan Materials Company (7e1e12a8-2c8d-42fd-aede-72f57e60f631)

    By J. Torma-Krajewski, C. Hipes

    Many mining companies apply ergonomic principles, but it is done either informally and/or reactively. Examples of an informal approach include replacing worn equipment, such as seats, with models tha

    Jan 1, 2007

  • CIM
    Data mining, mining data: Energy consumption modelling

    By S. Dessureault

    The relatively recent explosion of available data in all business sectors has induced a common expression of “drowning in data, starving for information.” The mining sector is affected by the informat

    Jan 1, 2007

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Uncertainty Based Push-Back Design Algorithm In Open Pit Mining

    By J. Gholamnejad

    In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi