Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On PilesBy Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
Feasibility Study Of Replacing Bottom Dump Trucks With Rear Dump Trucks At Kleinkopje CollieryBy T. Tamenti
The purpose of the project was to conduct a feasibility study to determine if the current operating bottom dump trucks that haul coal should be replaced with rear dump trucks. The engineering availabi
Jan 1, 2007
-
A Lining Management System For Submerged Arc FurnacesBy Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert
What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st
Jan 1, 2007
-
South Arturo, NevadaBy R. Hipsley, D. Arbonies, P. Dobak
South Arturo is a “Carlin-type”, breccia-hosted, oxide gold deposit located at the north end of the Carlin Trend. The discovery hole was drilled in July 2005 from mine dumps 1,000 feet south of the D
Jan 1, 2007
-
Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMSBy Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13
Jan 1, 2007
-
Uraniferous Collapse Breccia Pipes, Northwestern ArizonaBy J. McMurray
Introduction Uranium was recovered from mining of collapse breccia pipe deposits in the Arizona Strip district in northwestern Arizona (Figure 1) intermittently between 1956 and 1990, with cumulative
Jan 1, 2007
-
The Centenary Of The Discovery Of Platinum In The Bushveld Complex (10 November, 1906)By R. G. Cawthorn
The earliest authenticated scientific report of the occurrence of platinum in rocks from the Bushveld Complex appears to be by William Bettel on 10 November 1906. Thereafter, prospecting of the chromi
Jan 1, 2007
-
bauma Exhibitors Display Their Products to Largest Crowd EverThe title of “the world’s biggest volume-produced hydraulic breaker,” that was held for more than a decade by the Atlas HB 7,000, changed hands with the launch of Atlas Copco’s HB 10,000 at bauma 2007
Jan 1, 2007
-
Improving The Robustness And Confidence Of Underground Mine DesignBy M. Newton
Optimization and sensitivity analysis of mineable economic volumes have been standard practise for open pits for many years now, and more recently software has become available to apply techniques for
Jan 1, 2007
-
Mettop Process Control and Regulation SystemBy I. Filzwieser, A. Filzwieser
The Peirce Smith converter is the key metallurgical vessel in the majority of copper smelters. During the two step process, oxygen enriched air is injected through a row of tuyeres into the matte rece
Jan 1, 2007
-
Advances In Furnace Monitoring: InstrumentationBy R. MacRosty
The demand to increase production levels in smelting furnaces has driven the increase in the power levels. Consequently, greater cooling capacity of the furnace shell has been necessary, resulting in
Jan 1, 2007
-
Innovations in Underground Communication InfrastructuresBy Darrell Gillis
Recent accidents in the United States underground Coal Mines and the on-going carnage in Underground Chinese Coal Mines has shown the danger associated with the lack of communication infrastructures i
Jan 1, 2007
-
The Youga Gold Project - A West African Project Financing Case Study (98dba44f-d023-4a1b-aa5b-2a4dc1105351)By J. Forwood
The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from
Jan 1, 2007
-
Degree Of Prereduction Without Coke Consumption In Industrial FurnacesBy Rodney Ishak, Merete Tangstad
In the HC FeMn production, better utilisation of coke and electric power is vital for reducing the production costs. The higher manganese oxides in the charge are reduced to MnO in the prereduction zo
Jan 1, 2007
-
Estimating Thermodynamic Properties of Slags by Empirical MethodsBy J. W. Matousek
The heat content of the waste slag from a typical smelting operation methods for estimating the thermodynamic properties of smelting slags, to include: -- heats of formation -- heat capacities (sp
Jan 1, 2007
-
The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia MineBy J. Krzyzanowska
Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current
Jan 1, 2007
-
Cadia East Open Pit Project Mining StudyThe Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea
Jan 1, 2007
-
Moranbah North Tests the Critical Caving Theories Every Geotech Engineer?s Dream, the Ability to Get More than Two Points on a CurveBy Chris Strawson
Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Austr
Jan 1, 2007
-
The Origins Of Public Concern With Taconite And Human Health: Reserve Mining And The Asbestos CaseBy Michael E. Berndt
Asbestos first became an issue to Minnesota?s iron industry when it was revealed that mineral fibers similar to those in Reserve Mining?s tailings were being found in drinking water for several commun
Jan 1, 2007
-
Electric Arc On A Coke Bed In A Submerged Arc FurnaceBy J. A. Bakken, T. Magnusson, G. Sævarsdottir
This paper describes measurements of current and voltage done on submerged arc furnaces. The aim is to focus on and attempt to separate from one another the electric arc current and the current bypass
Jan 1, 2007