Search Documents

  • ISEE
    3D Computer Simulation of Bench Blasting With Precise Delay Timing

    By Dale Preece, C. Mick Lownds

    Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precisi

    Jan 1, 2008

  • SME
    Overview of Coal Mine Ground Control Issues in the Illnois Basin

    By G. M. Molinda

    Some of the most difficult coal mine roof in the U.S. can be found in the Illinois Basin. Factors contributing to the high roof fall rate include: weak moisture-sensitive roof rock, high horizontal s

    Jan 1, 2008

  • SME-ICGCM
    Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mines

    By A. Wahab Khair

    Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-

    Jan 1, 2008

  • CIM
    Zinc and Lead Uses: Technical and Market Trends

    By F. E. Goodwin

    Since the last CIM Zinc and Lead Conference ten years ago, significant technical and market forces have influenced how these metals are used, and the geographic distribution of their uses. Unprecedent

    Jan 1, 2008

  • SME
    Energy Fuels Prepared To Ride Uranium?s Resurgence

    The two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en

    Jan 1, 2008

  • TMS
    Liberation of a Large Quantitiy of Waste Materials by the Explosion in Water: A Technique with a Relatively Low Energy Consumption

    By Gjergj Dodbiba, Atsushi Shibayama, Toyohisa Fujita, Takashi Shikazumi, Yukio Kato, Kenji Murata

    "A new crushing or liberation technique by means of underwater explosion is put forward. This technique is suitable for crushing and liberating various materials, for instance: the electric parts of t

    Jan 1, 2008

  • DFI
    LRFD For Deep Foundations: Replacing The Traditional Factor Of Safety In Design

    By Lance A. Roberts

    The Federal Highway Administration (FHWA) has mandated the use of the AASHTO Load and Resistance Factor Design (LRFD) specifications for all new federally-funded transportation infrastructure projects

    Jan 1, 2008

  • SME
    Risk Management of the Canada Line Transit Tunnels ? Introduction

    By Brendan Henry

    The Canada Line is a 19km long automated light rapid transit system with 16 stations in Vancouver, BC, Canada. The Concession was awarded to InTransitBC to design, build, partially finance, operate, a

    Jan 1, 2008

  • SME
    Field Evaluation of the Coal Dust Explosibility Meter (CDEM) (f4528243-a49d-4f61-b519-915a18b2dfc3)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) has d

    Jan 1, 2008

  • ISEE
    "Journal: 100 Years / Keystone Placer Testing and Mineral Prospecting Drillers Catalog No. 2Keystone Driller Company Beaver falls, Pennsylvania 1907"

    By Oliver Finn

    Gold dredging has made such rapid strides of late and there is such a widespread interest in this branch of mining that I venture to contribute a detailed account of the way in which a Keystone drille

    Jan 1, 2008

  • DFI
    Sonic Drilling and Sensitive Infrastructure

    By George Burnhart

    "Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc

    Jan 1, 2008

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • TMS
    Recycling of Heat Resistant Magnesium Alloys

    By Norbert Hort, Karl Ulrich Kainer, Carsten Blawert, Daniel Fechner

    "With the development of new heat resistant magnesium alloys, the automotive industry has introduced several parts to the drive train. The rising number of large magnesium components will result in a

    Jan 1, 2008

  • SAIMM
    An effective face support system to minimize rockfalls - Synopsis

    By N. D. L. Burger

    An effective prototype face support system to minimize rockfalls in rockfall-prone mines was developed and patented during a project sponsored by the Mine Health and Safety Council (MHSC). An experime

    Jan 1, 2008

  • SME
    The Use of Polymer Concrete in Sewage Tunnels for One-Pass Segmental Linings

    By Christian Maguire

    The presence of hydrogen sulphide in sewerage systems leads to severe concrete corrosion. Acid causes breakdown of the concrete matrix, and attacks reinforcement. Older sewer systems under acid attack

    Jan 1, 2008

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SAIMM
    Importance Of Pore Pressure Monitoring In High Walls

    By Kym L. Morton

    Ground water and associated pore pressure represent elements which can have a negative impact on surface mining and slope stability. Ground water flow and deformation within a slope influence each ot

    Jan 1, 2008

  • AUSIMM
    Evaluation of Pyrrhotite from Selected Ni and Platinum Group Element (PGE) Ore Deposits and the Influence of its Mineralogy on Flotation Performance

    By D Bradshaw, J R. R de Villiers

    The non-stoichiometric sulfide mineral pyrrhotite (Fe(1-x)S), common to many nickel and platinum group element (PGE) ore deposits, occurs in varying crystallographic forms with the different types exh

    Jan 1, 2008

  • SAIMM
    Investigating continuous time open pit dynamics - Synopsis

    Current mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos

    Jan 1, 2008

  • DFI
    Time-Dependent Increase In Load Capacity Of Tapered Piles

    By Jeongbok Seo

    This paper describes successful application of driven tapered-steel-pipe piles for two large-scale projects in the New York metropolitan area: Rego Park Mall, Rego Park, N.Y. and 164 Kent Avenue, Broo

    Jan 1, 2008