Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A new gas emission prediction model based on Australian longwall mining conditionsBy Q Qu
Reliable prediction of longwall gas emission sources and rate plays a critical role in mine ventilation and methane drainage capacity planning. Over the years, Australian longwall mines have been usin
Oct 12, 2022
-
Analysis of dust behaviour in the face zone utilising- CFD modelling toolsBy O Joneydi, J Viljoen, R Funnell
Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.
Oct 12, 2022
-
Comparison of heat, noise and ore handling capacity of battery-electric versus diesel LHDBy C McGuire
As mobile equipment electrification in underground mining continues to gain popularity, control ofheat and humidity in the workplace is becoming a key driver in sizing of ventilation and mine aircooli
Oct 12, 2022
-
Safety Assessment of Dam Failure of Tailings Pond Based on Variable Weight Method: A Case Study in ChinaBy Congcong Chen, Bo Ma
When assessing the safety of a tailings dam, the constant weight method (CWM) is one of the most commonly used methods. However, when the evaluation indicator value suggests serious defects, the evalu
Oct 8, 2022
-
Prediction of Three‑Dimensional Fractal Dimension of Hematite Flocs Based on Particle Swarm Optimization Optimized Back Propagation Neural NetworkBy Xiaodong Yu, Jinxia Zhang, Fusheng Niu, Hongmei Zhang
The three-dimensional (3D) fractal dimension is an important parameter to analyze the 3D structure and flocculation effect of the hematite flocs. In this work, the 3D fractal dimension of hematite flo
Oct 3, 2022
-
Heat-constrained modelling of calcium sulphate reductionBy L. A. Jordan, D. van Vuuren
A two-dimensional finite difference model has been developed to describe the reduction of kilogram quantities of dehydrated phosphogypsum. The model’s scope has been limited to focus on the heat trans
Oct 1, 2022
-
Water production as an option for utilizing closed underground minesBy P. Malíková, I. Osičková, R. Sousedíková, P. Rys, J. Dvořáček, S. Heviánková
Each mining project goes through the same life-cycle, from prospecting and exploration to closure and post-closure periods. This prompts the question whether the closure of a mine constitutes the end
Oct 1, 2022
-
A discrete event simulation approach for mine development planning at Codelco’s New Mine LevelBy I. Soto, E. Córdova, A. Anani
The new caving megaprojects that are planned to go into production in the next decade have scheduled horizontal developments at very high rates, which are difficult to achieve. Research has been condu
Oct 1, 2022
-
Application of MR and ANN in the prediction of the shovel cycle time, thereby improving the performance of the shoveldumper operation – A case studyBy S. Dey, C. Bhar, S. K. Mandal
Loading and hauling of ore and waste are the key operations of an opencast coal mine and entail a high operational cost. The productivity of a mine can be increased by reducing the cycle time of loadi
Oct 1, 2022
-
An improved pillar design methodologyBy A. J. S. Spearing, M. Sharifzadeh, K. V. Jessu
Empirical pillar design methods are commonly used in the mining industry. The parameters within which these methods are valid are frequently unknown to the user or ignored. In addition, empirical desi
Oct 1, 2022
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage TanksBy Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla
This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len
Oct 1, 2022
-
The Impact Of End Bearing Plate On Micropile Capacity Casted In Cohesive SoilBy Soorkty Elarabi
The aim of this paper is to discuss the impact of end bearing plate on the capacity of micropile. Preliminary studies have been made in Sudan in specific area of cohesive soil. Experimental works were
Oct 1, 2022
-
Performance Requirements For Vibrocompaction On Crushable Calcareous Sands Of The Uae And Their Verification In Comparison To Silica/Quartz SandsBy Vijaya Bhushan Rao, Jason Redgers
The typical Vibrocompaction projects undertaken in the UAE are on reclaimed Sands. These Sands which are predominantly the crushable, calcareous, carbonate sands found locally as opposed to the more c
Oct 1, 2022
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Effects Of Self-Weight On Thermomechanical Response Of Energy PilesBy Arash Saeidi Rashk Olia, Dunja Perić
The increasing demand for renewable energy has attracted attention to energy geostructures as means of extracting clean geothermal energy from the ground. To further advance the understanding of soils
Oct 1, 2022
-
Structural Aspects Of The Stabilization Of Ten Mile SlideBy Adrian Gygax, Sarah Gaib, Rod Kostaschuk
The British Columbia Ministry of Transportation and Infrastructure (Ministry) recently completed a slope stabilization project at Ten Mile Slide on Highway 99. The highway is an essential part of the
Oct 1, 2022
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022