Search Documents

  • SME
    Drilling Oil and Gas Wells Through Gob

    By James G. Tilton

    Throughout the world, sedimentary basins are exploited for many different minerals. Frequently, the extractive methods conflict with one another. A case in point is the proximity of oil and gas operat

    Jan 1, 1997

  • ISEE
    Drilling on the Taum Sauk Upper Reservoir Rebuild Project

    By Randall Head

    The drilling at the Taum Sauk Reservoir was a unique compilation of the latest technology and everyday common sense. This site is comprised of rhyolite, which is 30 times harder than limestone in comp

    Jan 1, 2010

  • AIME
    Drilling Performances At The Kensico Dam, Catskill Aqueduct System, New York

    By W. L. Saunders

    WHEN work was begun in September, 1910, on the rock excavation for the foundation of the gigantic dam at Valhalla, N. Y., which is to convert Kensico lake into an important storage reservoir of the Ca

    Jan 2, 1914

  • AIME
    Drilling Practice In Swedish Mining

    By Ingvar Janelid

    DURING the last ten years, in the effort to save manpower and costs, methods of drilling and blasting in Sweden have changed and developed in a revolutionary manner. These developments have been accom

    Jan 6, 1954

  • CIM
    Drilling Practice on the Welland Ship Canal

    By F. J. Tozer

    Canal communication between Lake Erie and Lake Ontario has been one of almost constant enlargement and reconstruction to meet the rapid growth of trade and commerce, and the consequent steady increase

    Jan 1, 1926

  • AIME
    Drilling Selection Requires Value Judgments - Principles Of Drilling

    The selection of a particular machine for production drilling is the most critical drill evaluation the pit engineer is called upon to make. It is a true engineering design problem requiring value jud

    Jan 10, 1967

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AIME
    Drilling Technology - A Method of Perforating Casing Below Tubing

    By G. R. Hodgson, M. P. Lebourg

    The introduction in the field of a new type well completion called for the setting of tubing open-ended in the well before perforating the casing. This paper describes a new perforating tool of the sh

    Jan 1, 1952

  • AIME
    Drilling With Coromant Equipment

    By J. Fred Johnson

    COROMANT is the trade name of the alloy-steel drill rod tipped with a chisel-type tungsten-carbide bit manufactured by Sandvik Steel Works Co., Ltd. Other names, such as Swedish or air-leg method of d

    Jan 1, 1952

  • AIME
    Drilling – Equipment, Methods and Materials - A Copper Ion Displacement Test for Screening Corrosion Inhibitors

    By William B. Hughes

    The rubber-sleeve core barrel was developed to improve core recovery from unconsolidated sands, where it is most difficult to obtain cores with conventional barrels. The use of a rubber-sleeve core re

  • AIME
    Drilling – Equipment, Methods and Materials - Effect of Pressure on Rock Drillability

    By John R. Eckel

    A Iaboratory drilling rig has been devised and placed in operation which permits the application of hydrostatic, terrastatic, and formation pore pressures to a rock sample for drilling under controlle

  • AIME
    Drilling – Equipment, Methods and Materials - Increased Bit Life Through Use of Extreme Pressure...

    By C. van der Poel, R. L. Chuoke P. van Meurs

    When an initially planar interface between two im-ttitcihle liquids is displaced at constant rate, U, nor-mat to the front, instability will occur for all rates greater than a critical rate. U, given

  • AIME
    Drilling – Equipment, Methods and Materials - Laboratory Studies of Formation Damage in Sands Con...

    By A. E. Anderson, H. J. Hilll

    Laboratory data for 155 field muds and 77 .shales have been used to develop correlations to estimate the net streaming potential component of the SP. Analysis of these data and comparison with field t

  • AIME
    Drilling – Equipment, Methods and Materials - Mechanics of Differential Pressure Sticking of Drill Collars

    By H. D. Outmans

    A method has been developed for determining the relative water wet-tability (fraction of the surface wet by water) of porous media. This method involves the adsorption of methylene blue dye from an aq

  • AIME
    Drilling – Equipment, Methods and Materials - Properties of Cementing Compositions at Elevated Temperatures and Pressure

    By Dwight K. Smith, Greg Carter

    Studies have been conducted on The properties of many deep well cementing compositions to determine their Strength behavior over curing periods to 180 days at elevated tem-peratures and 3,000 psi pre

  • AIME
    Drilling – Equipment, Methods and Materials - Use of Chemicals to Maintain Clear Water for Drilling

    By J. E. Fox Jr., J. L. Lummus, J. P. Gallus

    Fresh water or brine drilling fluids may be kept free of suspended drilled solids by the addition of a water soluble acrylamide-carboxylic acid copolymer at the flowline. Addition of from .01 to 0.2 l

  • AIME
    Drilling – Equipment, Methods and Materials - Water-In-Oil Emulsion Cements

    By M. R. Tek, K. H. Coats, D. L. Katz

    The performance of a gas reservoir su,bject to water drive is often affected by interference due to gas procluction or injection in neighboring reservoirs adjacent to a common aquifer. Field data avai

  • AIME
    Drilling-Equipment, Methods and Materials - A New Device for Field Recovery of Barite From Drilling Mud: I. Theory and Laboratory Results

    By R. F. Burdyn

    The inadequate use of centrifugation to economically recover solids from weighted drilling fluids reflects the need for better equipment and techniques for this putpose. Laboratory studies in the deve

    Jan 1, 1966

  • AIME
    Drilling-Equipment, Methods and Materials - A New Device for Field Recovery of Barite: II. Scale-Up and Design

    By D. E. Hawk, R. F. Burdyn, F. D. Patchen

    Earlier work on a mud separator for barite recovery is extended to the design and construct ion of a rugged field unit. Problems associated with scale-up for field use include the me of dilution water

    Jan 1, 1966

  • AIME
    Drilling-Equipment, Methods and Materials - Bit-Tooth Penetration Under Simulated Borehole Conditions

    By W. C. Maurer

    A study of bit-tooth penetration, or crater forniation. under simulated borehole condirions has been made. Pressure conditions existing when drilling with air, water and mud have been sirnulated for d

    Jan 1, 1966