  • CIM
    Drill monitoring for geological mine planning in the Viscaria copper mine, Sweden

    By Håkan Schunnesson, Kirsten Holme

    "When mining high grade, narrow ore bodies, the mining method often implies a very detailed knowledge of the ore contacts to avoid unacceptable ore loss and waste rock dilution. During the past decade

    Jan 1, 1997

  • AUSIMM
    Drill Monitoring Investigation in a Western Canadian Surface Coal Mine

    By Peck J. P, Kennedy D

    Drill performance monitoring studies were recently completed at the Fording River mine, British Columbia. Microprocessor-based instrumen- tation and data analysis techniques were developed with the o

    Jan 1, 1989

  • IOM3
    Drill productivity evaluation by monitoring

    A production drill rig at a site in Sweden was equipped with a monitoring system to estimate production statistics. Drill running times, drill hole depths, penetration rate, rotation speed, thrust, ai

    Jun 19, 1905

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • SME
    Drill-Site Favorability For Concealed Porphyry Copper Prospect, Rome Canyon, Nevada Based On Characteristic Analysis Of Geochemical Anomalies

    By R. B. McCammon

    Four areas have been identified as favorable drill-site locations for determining whether or not a suspected prophyry copper deposit exists in Rowe Canyon, Nevada. Favorability is based on the similar

    Jan 1, 1979

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • AIME
    Drillability of Rocks in Percussive Drilling From "Energy Per Unit Volume" As Determined With a Microbit

    By A. G. Paithankar, G. B. Misra

    Although certain physical mechanical properties of rocks have been claimed to give an estimate of penetration rate in percussive drilling, the authors' work shows that the correlation of penetrat

    Jan 1, 1981

  • TMS
    Drilled and Tapped Slurry Pump Parts with Hardness in Excess of 700 HBN

    By George A. Calboreanu

    In order to overcome drilling and tapping of high hardness wear resistent material in slurry pumps, most of time mild steel inserts are mounted in the mold and after pouring they become an integrated

    Jan 1, 1996

  • DFI
    Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven Piles

    By Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell

    The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their

    Sep 8, 2021

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Drilled Displacement Piles in the Northeastern United States

    By Jr NeSmith

    "Drilled Displacement piles are a product of screw pile technology originally developed in Europe. The process involves rotating tool into the ground that displaces the soil laterally as it advances,

    Jan 1, 2016

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges

    By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C

    Jan 1, 2014

  • DFI
    Drilled Pier Foundations for Mercedes-Benz Stadium

    By Jean Wehbe, Daniel C. Brahana

    "The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece

    Jan 1, 2016

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    Drilled Pier Foundations In Expansive Soils ? Synopsis

    By F. H. Chen

    the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri

    Jan 1, 2010

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988