Search Documents

  • AIME
    Development of the Iron and Steel Industry on the Niagara Frontier

    By W. A. James

    NATURE endowed the Niagara Frontier with great resources but it was the molding of these resources by the early pioneers that assured its future development. This great industrial district of New York

    Jan 1, 1938

  • SME
    Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022

    By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick

    The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept

    Dec 1, 2022

  • AIME
    Development of the Kalengwa Mine in Zambia

    By P. B. Knuckey, D. Littleford

    The Kalengwa mine, situated in a remote area of Zambia in Central Africa, has presented some unique problems to the planners engaged in developing the deposit. This small, high grade copper deposit co

    Jan 1, 1972

  • CIM
    Development of the Largest Sodium Sulphate Deposit in Canada

    By P. G. Rueffel

    "Natural deposits of sodium sulphate are the result of normal geological processes. They are world-wide in occurrence and are found in depressions in arid and semi-arid regions. Primarily, the sodium

    Jan 1, 1968

  • AIME
    Development Of The Law Relating To The Use Of Gas Compressors In Natural-Gas Production

    By Samuel S. Wyer

    Discussion of the paper of SAMUEL S. WYER, presented at the New York meeting February, 1916, and printed in Bulletin No. 110, February, 1916, pp. 263 to 279. DAVID T. DAY, Washington, D. C.-I would l

    Jan 5, 1916

  • AUSIMM
    Development of the Maui Gas Field

    The offshore Maui gas/condensate field was discovered by Shell BP and Todd on Services Limited in 1969. Subsequent appraisal drilling and negotiatio

    Jan 1, 1994

  • AIME
    Development of the Mineral Industry in Peace and War

    By J. R. Finlay

    BEFORE entering into the statistical part of this article, some general comments may be ln order. Each important war seems to introduce a new atmosphere and a new epoch. The Civil War led to the perio

    Jan 1, 1944

  • SME
    Development Of The Niosh "Determination Of Sound Exposures (DOSES)" Mining Noise Exposure Management Software

    By E. Spencer

    Overexposure to hazardous noise has been found in most mining sectors, with up to 100% of the surveyed workforce experiencing a noise dose over the Mine Safety and Health Administration (MSHA) permiss

    Jan 1, 2010

  • SME
    Development of the NIOSH Determination of Sound Exposures (DOSES) mining noise exposure management software - SME Transactions 2011

    By E. R. Spencer, E. R. Bauer, G. P. Cole

    Overexposure to hazardous noise has been found in most mining sectors, with up to 100% of the surveyed workforce experiencing a noise dose that exceeds the U.S. Mine Safety and Health Administration (

    Jan 1, 2011

  • ABM
    Development Of The Off-line Simulator Of The Hot Strip Mill Mathematical Model From Gerdau Ouro Branco*

    By Luiz Bruno de Oliveira Araujo, Luciano Morais Teixeira, Luiz Gustavo Pedrosa de Melo, Altair Lúcio de Souza

    The off-line simulation of the metallurgical process in an industrial line brings several benefits such as: evaluation of the influence of the main parameters that affect the results of the process, c

    Oct 1, 2019

  • SME
    Development Of The Operations Research Program At The College Of Mines

    By E. R. Drevdahl

    It has been suggested that we at the University of Arizona present a paper covering the origin, philosophy, and results of the College of Mines program in the field of computers and operations researc

    Jan 1, 1963

  • AUSIMM
    Development of the Ore Handling System at the Grasberg Block Cave Mine, Indonesia

    By H Firdausi, I Pasek, T Chenier

    The Grasberg Block Cave (GBC) Mine is one of the future underground mines of PT Freeport Indonesia (PTFI). Located in the remote highlands of Papua, Indonesia, the GBC mine is scheduled to start produ

    May 9, 2016

  • DFI
    Development Of The Osterberg Load Cell

    By Charles L. Guild

    I will add a few facts about the use and development of the Osterberg Test Load Cell and my association with Jorj. I first met Jorj in 1965 when the Guild Construction Co. drove 12" diameter cast-in-p

    Jan 1, 1989

  • AUSIMM
    Development of the Pike River Coal Mine Access Road

    By D Macfarlane, T McMorran

      This paper describes the design and construction of the upper section of the Pike River Mine Access Road. The road extends 11 km from Logburn Road alongside Big River on the West Coast of the S

    Jan 1, 2007

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

    Performance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance

    Jan 1, 1967

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016