Search Documents

  • CIM
    Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired Equipment

    By Jason J. Ballentine

    This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main

    May 1, 2007

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • SAIMM
    Developing New Approaches To Rock Slope Stability Analyses

    By J. R. L. Read, A. N. Ogden

    This paper describes mining industry funded research that is being undertaken to address the critical gaps and uncertainties in our knowledge so that we can develop new approaches and create more effe

    Jan 1, 2006

  • CIM
    Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities

    By Ian Bruce

    Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp

    May 1, 2002

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • TMS
    Developing Process Design Criteria for Zarafshan/Newmont Joint Venture Muruntau Heap Leach Operation

    By Sevket Acar, Tim Acton

    "Zarafshan/Newmont is a 50/25/25 joint venture between Newmont Gold and the State Committee for Geology and Mineral Resources, and Navoi Mining and Metallurgical Combinat, two entities of the Republic

    Jan 1, 1997

  • SME
    Developing Project Cost Estimates in Volatile Markets - RETC2023

    By Connor Langford, Murray Gant, Ken Massé

    For public organizations, preparing accurate project cost estimates is a critical component in capital project planning. Project delivery methods provide a structured approach to moving projects throu

    Jun 13, 2023

  • AUSIMM
    Developing Raise Boring Technique in China

    By Weimin F

    In the last decade, great strides have been made in the raise boring technique in China. Extensively, the drilling and blasting method has been replaced by the mechanized raising method since 1980

    Jan 1, 1987

  • AUSIMM
    Developing Resilient Water Monitoring Programs in Changing Climate Conditions

    By A D. Price, W J. Germs, O Patterson, T R. Weaver

    "Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo

    Nov 26, 2013

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • IMPC
    Developing Solutions To Complex Flotation Problems (INTERNATIONAL MINERAL PROCESSING CONGRESS (IMPC) 2012 PROCEEDINGS / NEW DELHI, INDIA)

    By B. K. Gorain

    Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed t

    Sep 1, 2012

  • SAIMM
    Developing stereovision and 3D modelling for LHD automation

    By T. Vincent, J. Steele, C. Debrunner, M. Whitehorn

    This paper presents current work on the development and use of stereovision for underground mining. Information on the calibration of the cameras and the feature-matching algorithm are presented. Th

    Sep 1, 2001

  • IMPC
    Developing Technical Excellence In Young Australian Metallurgical Professionals ? A New Graduate Development Program

    By Diana Drinkwater

    As ore grades decline, ore deposits get harder and mineralogical complexity increases, metallurgical skills are more important than ever to ensure that today?s mining operations are operating efficien

    Sep 1, 2012

  • AUSIMM
    Developing technologies for a complex orebody

    By G Anderson, V Lawson, P Voigt

    Glencore operates zinc concentrators at both Mount Isa and McArthur River. Both orebodies have a history of complexity and required the development of new technologies to maximise the value from thes

    Nov 21, 2018

  • ABM
    Developing The Blast Furnace Copper Stave For Improved Performance

    By Robert Horwood, Richard Harvey

    The copper stave was a development of the Blast Furnace cooling system intended to utilise the high heat transfer properties of copper within a fully covered shell cooling solution. They were original

    Oct 1, 2019

  • SME
    Developing The DOZ Mine At PT Freeport Indonesia

    By John Barber

    The Deep Ore Zone (DOZ) Mine is PT Freeport Indonesia's (PTFI) newest operation. Production at the mine began in September 2000. The DOZ Mine produces 25 kt/d (27,500 stpd) using mechanized block

    Jan 1, 2001

  • AUSIMM
    Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground Mines

    By D Kent, R Paine

    "Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp

    Mar 24, 2014

  • AUSIMM
    Developing the Ridgeway Deeps Project with an Operations Attitude

    By C Jones

    Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1

    Mar 21, 2011

  • AUSIMM
    Developing the West Pilbara Iron Ore Project

    By K Watters

    API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes

    Jul 11, 2011

  • NIOSH
    Developing Toolbox Training Materials For Mining - What Is Toolbox Training And Why Use It?

    By Floyd D. Varley, C. M. K. Boldt

    Toolbox training is often described as short, informal training conducted at a worksite by technically competent persons for the benefit of a work team. The key feature of toolbox training is the focu

    Jan 1, 2002