Search Documents

  • CIM
    Design of the New Lihir Gold Pressure Oxidation Autoclave

    By M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt

    Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island

    Jan 1, 2011

  • SME
    Design of the Otjikoto Gold Mill, Namibia

    By John Rajala

    The Otjikoto Gold Mill was commissioned during November–December 2014 as Namibia’s first new gold producer in 30 years. Its operations consist of surface mining with a modern gravity/carbon-in-pulp mi

  • SME
    Design of the Otjikoto Gold Mill, Namibia "Mining, Metallurgy & Exploration (2021)"

    By John Rajala

    The Otjikoto Gold Mine in the Republic of Namibia is located approximately 300 kilometers north of the capital city of Windhoek. The project features surface mining with a modern gravity/carbon-in-pul

    Oct 30, 2020

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • AIME
    Design of the Primary Crushing Plant

    By L. R. MacLead

    Delivery of tailing to any part of the area by gravity from the ridge was found practicable. Experiments with asbestos-cement pipe proved it possible to use level pipe across the dams if it is fed thr

    Jan 1, 1942

  • SME
    Design Of The Sacaton Concentrator - Design Considerations

    By Dennis K. Mortensen

    The warm southwestern desert of Arizona is an ideal location for ASARCO's new Sacaton Unit. The climate of this arid region played a major role in the design considerations of the Unit's cru

    Jan 1, 1974

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • NIOSH
    Design Of Underground Openings In Competent Rock - Summary

    By Leonard Obert

    THIS REPORT presents methods and principles useful in designing underground mine openings and pillars in competent rock formations. Two types of formations are considered: (1) Massive formations, in w

    Jan 1, 1960

  • AUSIMM
    Design of Very Large Mill Installations: Mill Design Specifications and Audits

    A standard practice of auditing mill designs has developed in the mining industry. The purported aim of this task is to ensure that the mill being offered conforms to the design specification, thus re

    Jan 1, 2002

  • DFI
    Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - Synopsis

    Pier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app

    Jan 1, 1996

  • AUSIMM
    Design of Yield Pillars for Improved Stability of Colliery Roadways

    By Bhattacharyya A. K

    A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction

    Jan 1, 1995

  • SME
    Design Of Yieldable Tunnel Supports For Creeping Rocks (PRIPRINT 94-76)

    By N. D. Cristescu

    The aim of the present paper is to show how a mathematical modeling of a creeping rock and that of an yieldable lining can allow us to obtain an optimization of the lining design and generally of the

    Jan 1, 1994

  • DFI
    Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation

    By Emad Farouz

    The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c

    Jan 1, 2006

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • NIOSH
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e

  • SME
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en

    Jan 1, 2004