Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)By Jaime Adasme, Héctor González, Benjamín Celada
"INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In
Jan 1, 2016
-
Design and Engineering of Flotation Circuits (in Australia)By D Mcleod, S Brindley, S Green
The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit
Jan 1, 2005
-
Design and Evaluation of a Personal Diesel Aerosol Sampler for Underground Coal MinesBy V. A. Marple, K. L. Rubow, Y. Tao
"A personal diesel exhaust aerosol sampler has been designed and evaluated in both laboratory and field settings. The sampler uses size selective sampling for the determination of the respirable mass
Mar 1, 1992
-
Design and Evaluation of Dry FillBy Blair J. R, Barrett J. R
In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry
Jan 1, 1973
-
Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and ExplorationBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration (7cabb148-285f-4ad0-9583-a6d360323de4)By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design and evaluation of the roof bolt corrosion test system in a simulated underground coal mine environmentBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat, A. J. S. (Sam) Spearing
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall PanelsBy Kenneth Rigsby
Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi
Jan 1, 2003
-
Design and Fabrication of a Rotary Coal Cutting SimulatorBy A. Wahab Khair
"This paper deals with the description of the capabilities of a unique rotary coal cutting simulator which has been designed and fabricated at West Virginia University. It operates under the simulated
Jan 1, 1988
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall MiningBy Yoginder P. Chugh
This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga
Aug 1, 2013
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, BrisbaneBy Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Design And Hazard Assessment Of Mine Ore PassesBy M. J. Beus
This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro
Jan 1, 1996
-
Design and Implementation of a Brownfield Sag Pre-Crush CircuitBy G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? SynopsisBy E. Demir
Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe
Jan 1, 2012
-
Design and implementation of a polycarbonate safe haven wall in an underground coal mine - SME Transactions 2013By R. A. Meyr, K. A. Perry
Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by the U.S.Congress. The U.S. Mining Safety and Health Administration subsequently released the Final Rule on Refuge A
Jan 1, 2013
-
Design and implementation of a process control system for column flotationBy A. LA. Salama, D. B. Hyma
"The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.
Jan 1, 1993
-
Design and Implementation of a Semi-automated Truck/Shovel Dispatching SystemBy Y. Lizotte
This paper describes the design and implementation of the dispatching system at LAB Chrysotile Inc.'s Black Lake Mine Operation, Quebec, Canada. The initial system uses a computer in a passive ro
Jan 1, 1987
-
Design and Implementation of a Supplemental Atomizing Spray System for Dust Control in Deep Cut Continuous MiningBy J. Dilbeck, J. K. Ratliff, T. Petrov, Z. Brown
"In efforts to improve dust control during deep cut continuous mining a supplemental atomizing spray system, mounted on 14CM15 continuous miner, has been designed and successfully implemented in a U.S
Jan 1, 2019
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG MillBy Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010