Search Documents

  • DFI
    Design And Construction Of The Deepest Cfa Pile In Australia

    By W. L. Chong

    For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und

    Nov 1, 2022

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • SME
    Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? Introduction

    By Geoffrey Hughes

    The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive

    Jan 1, 2008

  • CIM
    Design and Construction of the Gilon Railway Tunnels in Karstic Rock

    By M. Wittke

    "In the course of the extension of the railway network in Israel, currently the two 4.6 km long tubes of the Gilon Tunnels on the line from Akko to Carmiel are being constructed. The tunnels run throu

    Jan 1, 2015

  • SME
    Design And Construction Of The Lafayette Bluff Tunnel

    By D. L. Petersen, C. R. Nelson, B. K. Nelson, B. D. Wagener

    The Lafayette Bluff tunnel, currently under construction for the Minnesota Department of Transportation (MnDOT), will be among the widest highway tunnels in the United States. The 199-meter tunnel is

    Jan 1, 1991

  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • DFI
    Design and Construction of the New VDOT Midtown Tunnel

    By Rick Ellman, Ian Chaney

    "The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a

    Jan 1, 2014

  • TMS
    Design And Construction Of The Noranda Converter At The Borne Smelter

    By Michel Boisvert

    Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions

    Jan 1, 1998

  • DFI
    Design And Construction Of The Rion Antirion Brdoge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2005

  • SME
    Design and Construction of the Shoal Creek Raw Water Intake at Lake Lanier

    By D. Rendini, R. D. Gutridge

    INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr

    Jan 1, 2005

  • DFI
    Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California Hillside

    By Patrick O. Shires, Harry W. Schnabel

    With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg

    Jan 1, 2018

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2007

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • SME
    Design and Construction of the Weehawken Tunnel and Bergenline Avenue Station

    By Leon J. Jacobs, Kyle R. Ott

    This paper discusses design and construction aspects of the tunnel, shaft and station for the Weehawken Tunnel and Bergen line Avenue Station. The project consists of a 1,269 m (4,156 ft) long existin

    Jan 1, 2003

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • DFI
    Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line

    By Suk han Jang

    This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This

    Jan 1, 2007