Search Documents

  • IIMP
    Construcción de modelos geológicos

    By Fernando Linares Quiroa

    El diseño y operación de la mina es un proceso importante para la construcción de un modelo de cuerpo mineralizado. En este sentido, el presente texto describe la trascendencia del modelo geológico,

    Jul 31, 2003

  • IIMP
    Construcción del muro de concreto plástico y cortina de impermeabilización mediante inyecciones para el recrecimiento del dique Polishing Pond

    By Hugo Egoavil, Michele D´Acquisto

    El proyecto de construir un muro de concreto plástico (cut-off wall) y una cortina de impermeabilización mediante inyecciones de cemento respondió a la necesidad de realizar el recrecimiento del dique

    Sep 30, 2018

  • CIM
    Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” Rocks

    By D. J. Scarpato

    "Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t

    Jan 1, 2015

  • DFI
    Constructability Of Tiedback Wall Systems - I. Introduction

    By Thomas C. Anderson

    Tiedback walls are now recognized and accepted as a good solution for a variety of structural problems: ? Retaining Walls and Bridge Abutments in cut situations ? Landslide stabilization ? Rep

    Jan 1, 1991

  • CIM
    Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold Climates

    By T. R. Wildeman

    "At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,

    Jan 1, 1992

  • ISEE
    Constructing Laboratory Caverns in Hard Rock Under High Stress

    By Christopher Laughton

    A new underground laboratory is under construction at the recently closed Homestake Gold Mine, Lead South Dakota, United States of America. The Deep Underground Science and Engineering Laboratory is d

    Jan 1, 2011

  • AIME
    Constructing Non-Polluting Coal Mine

    By Richard E. Lounsbury

    Coal mine refuse handling traditionally has been the redheaded stepchild of the industry-a problem to be ignored as much as possible. During the past few years, however, mining companies have become m

    Jan 6, 1973

  • SME
    Constructing the Airside Road Tunnel, Heathrow Airport

    By John Corcoran

    INTRODUCTION Content of this Report The 1300m long twin-bore 8.1m diameter Airside Road Tunnels (ART) were excavated beneath the busy taxiways and stands of Heathrow Airport between 2002and 20

    Jan 1, 2005

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • SME
    Constructing Wetlands For Treatment Of Mine Water

    By M. A. Girts

    Wetlands can be constructed inexpensively on mined lands to treat small flows of acid mine water. Metals are removed from the water by the wetland vegetation and indigenous bacteria. Full-scale field

    Jan 1, 1986

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • AIME
    Construction

    By T. A. Rickard

    The writing that is effective is woven with a fine texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it

    Jan 1, 1931

  • SME
    Construction Aggregate In Washoe County, Nevada An Example Of A Resource Inventory Using GIS

    By D. P. Bryan

    An aggregate resource study was done for southern Washoe County, Nevada, which contains the Reno-Sparks metropolitan area and a population of about 300,000. The study included an inventory of existing

    Jan 1, 1996

  • SME
    Construction Aggregate Properties of the Sombrerito Formation, Dominican Republic

    By S. J. Stokowski

    Abstract An extensive drilling and laboratory testing program indicates that a construction aggregate resource is present within the Oligocene Sombrerito Formation limestone, southwestern Dominican Re

    Jan 1, 1991

  • SME
    Construction Aggregates Industry Trends Inspire Innovation

    By Bruce W. Woolpert

    During the SME Board of Directors’ midyear meeting in Monterey, CA Aug. 25, I discussed trends in the construction aggregates industry. Many construction-material suppliers may not have yet fully int

    Jan 1, 2002

  • DFI
    Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones

    By Dan A. Brown

    The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos

    Jan 1, 1991

  • AIME
    Construction and Equipment of the Ross Shaft, Homestake Mining Company

    By Guy Bjorge

    IN recent years the Homestake mine has been served by three shafts, the B. &. M., the B. & M. No; 2 and the Ellison, supplemented by an inside shaft, the Milliken, extending from the 2000-ft. level to

    Jan 1, 1935

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • SME
    Construction And Investigation Of A Clay Heap Leach Pad ? Introduction

    By Dirk van Zyl

    Natural materials can be used successfully in the construction of heap leach pads. The use of these materials usually result in the least expensive approach for such facilities. Sufficient geotechnica

    Jan 1, 1983