Search Documents

  • AIME
    Constitution of Alloys of Aluminum, Zinc and Tin and Aluminum, Zinc and Cadmium ((Detroit Meeting September, 1920)

    By V. Jares

    DESPITE the fact that a combination of metals-aluminum-zinc-tin, and sometimes aluminum-zinc-cadmium-is extensively used for aluminum solders, as well as for die-castings, the constitution of these al

    Jan 1, 1927

  • TMS
    Constitution Of Electrical Conductivity Of Copper Sulfate Electrolytes Acidified With Sulfuric Acid For Copper Electro-Refining And -Winning Processes

    By K. Tozwa

    The electrical conductivity of electrolytes for copper electrorefining and electrowinning processes has been reported by many researchers since 1911. The experimental results show that the conductivit

    Jan 1, 2003

  • AIME
    Constitution of High-purity Iron-carbon Alloy

    By Robert Mehl

    THE purpose of this investigation was to prepare high-purity iron-carbon alloys, to determine as precisely as possible the A3(GOS), the Acm(SE), and the A1(PSK) transformation temperatures in the meta

    Jan 1, 1937

  • AIME
    Constitution Of Iron-Chromium-Manganese Alloys

    By C. O. Burgess, W. D. Forgeng

    DESPITE the increasing interest in and the technical importance of iron-chromium-manganese alloys, very little published information is available regarding their constitution. F. M. Becket's pape

    Jan 1, 1938

  • AIME
    Constitution Of The Iron-Rich Iron-Nickel-Silicon Alloys At 600°C.

    By Earl S. Greiner, Eric R. Jette

    ALTHOUGH the mechanical and chemical characteristics of certain iron-nickel-silicon alloys have been investigated,1 the available literature shows no results of a systematic investigation of the const

    Jan 1, 1943

  • AUSIMM
    Constitutional Features of the Mount Isa Sulphide Ores and Their Interpretation

    Some 800 analyses for Cu, Zn, Pb, Ag, Fe, S, CaO, MgO, C02, Si02 and Al203 were used to examine the elemental constitution of the Mount Isa ores, and, for comparison, those of the Northern Leases area

    Jan 1, 1963

  • SME
    Constitutive Equations For Crushed Coal

    By J. M. Rotter, R. A. Lohnes, J. Y. Ooi

    Reliable prediction of wall pressures in a coal silo demands careful characterization of the stress-strain properties of the coal. This paper describes the results of triaxial compression tests on a t

    Jan 1, 1998

  • CIM
    Constitutive Model for Mechanical Properties of Highly Porous Organic-Rich Chalks from Central Israel

    By S. Feinstein, I. Reznik, Y. H. Hatzor, O. Shitrit, Y. O. Rosenberg, H. J. Vinegar, S. Nguyen

    "We report the effects of porosity and total organic carbon (TOC) content on the mechanical behavior of organic-rich chalks, based on laboratory measurements. The organic-rich chalks are from the Seno

    Jan 1, 2015

  • CIM
    Constitutive Model for Numerical Modelling of Highly Stressed Heterogeneous Massive Rocks at Excavation Boundaries

    By M. C. Villeneuve

    A numerical modelling approach was developed to explicitly simulate geomechanical characteristics of intact rock: mineralogy, grain size and fabric. The approach involved creating a representative con

    May 1, 2009

  • TMS
    Constitutive Modeling Of A Glass Fiber-Reinforced Ptfe Gasketed-Joint Under A Re-Torque

    By Ali P. Gordon, James Williams

    Joints gasketed with viscoelastic seals often receive an application of a secondary torque, i.e., retorque, in order to ensure joint tightness and proper sealing. The motivation of this study is to ch

    Jan 1, 2015

  • SME
    Constrained Interpolation and Soft Kriging

    By A. G. Journel

    The indicator random function formalism allows a common coding of hard numerical data, constraint intervals, and soft qualitative information as prior probability distributions. The soft kriging algor

    Jan 1, 1986

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • AIME
    Constraint - The Missing Variable In The Coal Burst Problem

    By C. O. Babcock

    In this Bureau of Mines report, the authors present the results of laboratory tests on the burst proneness of coal. Many researchers have studied the violent breaking of large coal masses in undergrou

    Jan 1, 1984

  • SME-ICGCM
    Constraint Is The Prime Variable In Pillar Strength

    By Clarence O. Babcock

    Since Vicat in 1833, the width to height ratio of a mine pillar has been taken as the fundamental variable in pillar design. From work in the laboratory by many investigators testing rock, Coal and co

    Jan 1, 1984

  • CIM
    Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical Operations

    By A. Khan

    The purpose of this paper is to demonstrate the value of identifying and optimizing throughput constraints by utilizing a Constraint Model. This will be achieved by first understanding the overall con

    Aug 1, 2013

  • AUSIMM
    Constraints and Advantages of the Crown Minerals Act and the Resource Management Act

    By A P. Brown

    Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c

    Jan 1, 1997

  • SME
    Constraints On The Availability Of Coal For Mining In Illinois

    By C. G. Treworgy

    Geologists at the Illinois State Geological Survey are evaluating geologic and land use conditions that affect the minability of coal to determine how much coal is available for development using curr

    Jan 1, 1995

  • AUSIMM
    Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling

    By A Raza, D P. Kohn, D A. Foster, A J. W Gleadow

    A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the south-eastern highlands and along the continental margin ofAustralia provides c

    Jan 1, 1995

  • IIMP
    Construcción de botaderos de desmonte a partir de una clasificación geotécnica en zonas de climas secos con inviernos rigurosos

    By Carlos Aguirre

    Todo desarrollo minero conlleva un materíal estéril, el cual es acopiado en sectores previamente seleccionados y evaluados para dicha función. En esa perspectiva, surgen los botaderos -en tanto estruc

    Sep 9, 2007

  • IIMP
    Construcción de falso portal con estructuras de concreto prefabricado - Túnel de exploración proyecto Chaquicocha Subterráneo

    By Marco Jáuregui, Alexander Benites

    El presente trabajo técnico nace de la necesidad que tenía Minera Yanacocha de ubicar los sectores más importantes para la realización de sondajes diamantinos, los cuales ayudarían a la confirmación o

    Sep 20, 2019