Search Documents

  • SME
    Considerations In Selecting Grinding Equipment

    By Robert J. Russell

    The importance of grinding as a unit operation in all industry has caused much effort to be expended toward improving the facility with which grinding can be done. Endeavor has continued nearly 100

    Jan 1, 1960

  • SME
    Considerations In The Artificial Support Of Pit Walls

    By Earl M. Frizzell

    This paper addresses considerations for the use of artificial support of pit walls in surface mines, a new project of the Bureau of Mines. Results to date indicate that a polymer-coated cable with emb

    Jan 1, 1986

  • SAIMM
    Considerations In The Choice Of Primary Access And Transportation Options In Platinum Mines

    By R. P. H. Willis, A. G. du Plessis, R. B. Wilson

    This paper reviews issues to be considered in choosing primary access and transportation options for platinum and other mines. It proposes appropriate criteria and a methodology for deciding on the op

    Jan 1, 2004

  • SAIMM
    Considerations In The Optimisation Of Bench Face Angle And Berm Width Geometries For Open Pit Mines

    By D. J. H. Walker, W. H. Gibson

    The inclination of any pit wall composed of stacks of benches is limited by the overall quality and structural complexity of the rock mass in which the slope is situated. For a bench stack angle that

    Jan 1, 2006

  • SME
    Considerations In The Regulation Of Actinolite, Tremolite And Anthophyllite

    By I. M. Stewart

    In a proposed rulemaking regulating asbestos, nonasbestos varieties of Tremolite, Anthophyllite and Actinolite would be excluded from the regulations controlling permissible exposure to asbestos fiber

    Jan 1, 1992

  • SME
    Considerations In The Selection Of A Pneumatic Conveying System ? Introduction

    By Edward A. Vitunac

    The emerging importance of pneumatic conveying systems for bulk materials is becoming recognized by more persons responsible for materials management as consultants, at the corporate level and at the

    Jan 1, 1967

  • NIOSH
    Considerations In Training On-The-Job Trainers

    By Don Conrad, Tom Friend, Bill Wiehagen, Lynn Rethi

    On-the-job training (OJT) is a very common method of teaching job skills. Much of the training is done by experienced workers. This paper discusses small investments that can help improve the effectiv

    Jan 1, 2002

  • SAIMM
    Considerations Of Failure Mechanisms Associated With Rock Slope Instability And Consequences For Stability Analysis

    The results of a series of physical model studies of the stability of jointed rock slopes carried out some years ago are described. These models were tested under centrifugal loading. Four ?geological

    Jan 1, 2006

  • SME-ICGCM
    Considerations Of Gas Outbursts In Using Dome Salt Mines For Storage Of Oil And Nuclear Waste

    By M. Ashraf Mahtab

    A feature of interest in stability of excavations in domal salt is the phenomenon of gas outbursts which has occurred in five of the six mines in Louisiana salt domes. Gas outbursts are sudden errupti

    Jan 1, 1981

  • AUSIMM
    Considerations on Quality Assurance/Quality Control and Sample Security

    By G Gosson

    An important requirement in every geological quality control program is that the identity and grades of the control samples (duplicates, certified reference materials (CRMs), and blanks) must remain æ

    Jan 1, 2008

  • SME
    Considerations On The Selection Of A System Of Long Distance Transport By Conveyor Belt ? Introduction

    By J. M. Rios

    This paper exposes the reasons that led the Empresa Nacional Minera del Sahara, S.A. (ENMINSA) to the selection of a conveyor belt system for the transport of phosphate rock over a distance of 100 kil

    Jan 1, 1968

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 2

    By D. Berkley

    The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining an

    Mar 1, 2003

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • SME
    Considerations Regarding the Registration of Professional Engineers

    The US Constitution provides for regulation by the states for protecting the public's safety, health, and welfare. Hence, in the eyes of the law of all states today, this is the sole justificatio

    Jan 2, 1984

  • ABM
    Considerações Sobre O Desempenho Dos Eletrodos Nos Fornos Elétricos A Arco

    By Paulo von Krüger

    O desempenho dos eletrodos nos fornos elétricos a arco, depende, essencialmente, de três grupos de fatores distintos. O primeiro é a sua qualidade intrínseca, expressa em termos de resistividade, dens

    Aug 16, 2017

  • IMPC
    Considering Gangue And Precipitation Reactions Within A Copper Heap Leach Cfd Model

    By J. E. Gebhardt

    Progress is reported on capturing the effects of gangue chemistry in the context of a comprehensive stockpile heap leach model for leaching copper sulfide ores, employing leading edge computational fl

    Sep 1, 2012

  • AUSIMM
    Considering Geology in Drill and Blast Operations to Optimise Ore Body Value

    By L Maw

    New ZealandÆs largest gold producersÆ OceanaGold Macraes Mine is characterised by a large tonnage and relatively low grade operation. To survive in diminishing real gold prices, the operation must foc

    Jan 1, 2005

  • SAIMM
    Considering in situ grade variability during mining sequence

    By R. Peroni, J. Kopp

    Mine planning and scheduling is based on using a geological model for the deposit. Blocks are used to discretize the deposit into mineable volumes where grade values are assigned. Traditional estimati

    Jan 1, 2003

  • SAIMM
    Consolidated Backfill At O'Okiep Copper Company

    By J .. F. Brownrigg

    In the mining method used at O'Okiep Copper Company (OCC), vertical crater retreat, the prime requirement for the fill is that it should be sufficiently strong to be free-standing to a height of

    Jan 1, 1988