Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Large Blast at the Hidden Creek MineBy W. R. Lindsay
Considerable attention has of late been given to the blasting of large amounts of ore in one operation, on account of the saving in labour and explosives and consequent low cost per ton, and also on a
Jan 1, 1934
-
A Large Eddy Simulation Model of Air Flow and Pollutant Transport in a Deep Open Pit Mine Under Arctic InversionBy K. V. Raj
As open pit mines continues to grow deeper, managing air pollution can become challenging. During arctic air inversion, the temperature of the air over the mine increases with altitude, and the cold,
Feb 23, 2014
-
A Large Underground Opening Measured Versus Predicted Rock DeformationsBy Norman F. Sweeney, H. John Hovland
Over one million yards of granite were excavated for the Helms Pumped Storage Project, including a large underground powerhouse complex. Site investigations and in situ stress measurements were essent
Jan 1, 1981
-
A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel DesignBy A Smith
Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro
Mar 8, 2011
-
A Liberation Study of Autogenous and SAG MillsBy Hayward N, Sutherland D, Wilkie G
A pilot plant study has been made of the liberation characteristics of a nickel ore under different milling conditions. A series of runs were made ranging from fully autogenous grinding to semi-auto
Jan 1, 1991
-
A Life Cycle Approach to the Environmental Assessment of Process Alternatives in the Recycling of Galvanized SteelBy Christina Viklund-White
Life Cycle Assessment has been used to compare the environmental performance of landfilling versus recycling of the zinc used for galvanizing steel. Hypothetical process routes were com-posed involvin
Jan 1, 2000
-
A Life Cycle Impact Assessment Indicator For Ash Management In Coal-Based Power GenerationThe coal-based power generation industry faces increased pressure from all sectors to improve its environmental performance. This is due to increased awareness of and concerns regarding greenhouse-and
Jan 1, 2002
-
A Life-Cycle Approach to Coal Resource Analysis: Examples From the Appalachian and Illinois Basins – Preprint 97-25By R. C. Milici
Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from
Feb 24, 1997
-
A Life-Cycle Approach To Coal Resource Analysis: Examples From The Appalachian And Illinois BasinsBy R. C. Milici
Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from
Jan 1, 1997
-
A Light-Media Pump for Dredging Minerals From the Sea FloorBy James Ball
The paper describes a new type of pump and related apparatus specifically designed to dredge sea-floor minerals from very great depths. The principle of operation of the dredging system is explained,
Jan 1, 1968
-
A Lightning Safety Primer for the Explosives IndustryBy Chris Vagasky
On July 10, 1926, lightning struck at Picatinny Arsenal, New Jersey, and caused the explosion of at least 600,000 pounds (272,000 kilograms) of ammunition, resulting in more than $600 million (2015 do
Jan 1, 2017
-
A Limestone Mine in the Birmingham DistrictBy C. E. Abbott
THE Birmingham district, Alabama, is distinctive in the proximity to one another of its deposits of iron ore, coal and flux. These three basic requisites for the making of iron and steel are found wit
Jan 1, 1936
-
A limit equilibrium approach to th use of stability bunds in the design of HDPE-lined tailings storage facilitiesBy T. Bezuidenhout, J. D. Visagie
In recent years the requirements for a barrier system between the waste body of tailings storage facilities (TSFs) and the natural ground (NG) has necessitated the use of HDPE-lined TSFs in South Afri
Jun 2, 2022
-
A Lining Design Method Consistent With NATM for Deep ShaftsBy Xiao min Zhou, Yan Xu, Hongzhen Liang, Xiaonan He
"With the increase of shaft excavation depth, the thickness of the shaft lining increases sharply. It is difficult to reduce thickness of lining effectively by improving high-strength concrete perform
Jan 1, 2019
-
A Lining Management System For Submerged Arc FurnacesBy Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert
What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st
Jan 1, 2007
-
A liquefaction incident in a fill raise: A case studyBy F. Hassani, K. Moozar, J. Ouellet, P. Gauthier
"This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche
Jan 1, 2004
-
A Liquefaction Incident in a Waste Pass: A Case StudyBy F. Hassani
This Paper describes a sudden spill of rock waste used for backfilling from a waste pass at one of the underground mine in Canada thus causing a major failure/accident. The mine operator immediately
May 1, 2003
-
A Liquid Settlement System for Measuring Roof Sag During Development Mining - A Comparison Between Place Change Mining and a Miner?BolterBy Andy L. Shaffer
A novel liquid settlement system (LSS) was installed in advance of mining at a western United States (U.S.) longwall mine to measure total roof sag from the time of cutting to days after mining during
Jan 1, 2014
-
A Local Additional Potential Model For Pipeline Stress Corrosion CrackingBy Z. Y. Liu
A local additional potential model (LAPM) was developed to illustrate the role of strain rate in stress corrosion cracking (SCC) of pipelines. According to LAPM, both density and mobility of the local
Jan 1, 2010
-
A Logical Approach to Determination of Density and Porosity Values for Iron Ore DepositsThe importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are
Jan 1, 2007