Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Clarifying Liberation Mechanism Of Electrical Disintegration By Electromagnetic Field AnalysisBy Rintaro Hayashi
The enrichment of useful components from ores and/or wastes has become important with increasing recent worldwide resources demand and the amount of wastes generated from the urban mines, in order to
Sep 1, 2012
-
Clasificación de combinación de mineralesBy Edward Cadwell
El presente texto señala la clasificación de combinación de minerales a través los desperdicios estériles y altos y concentrados bajos.
Jan 1, 1959
-
Clasificación geomecánica y su aplicaciónBy Pedro Alejandro Samané Tuni
El presente texto describe las soluciones que disponen los geólogos e ingenieros para actuar de forma adecuada en la planificación, diseño y construcción de los proyectos, así como se muestran los err
May 1, 2013
-
Class I Areas Impacts Analyses For A Proposed Expansion Of A Taconite Processing Facility In Northeast MinnesotaBy D. M. Wagner, G. Biggs, M. Osmundson, C. J. Twaroski
Potential air emission impacts to federal Class I areas from distant sources are receiving increasing scrutiny by federal land managers (FLMs). This paper provides summary results of the impact analy
Jan 1, 2001
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Classificador Automático Dos Resultados De Retificação Dos Cilindros De Laminação Da Arcelormittal TubarãoBy Paulo Rodrigues dos Santos Junior, Alexander de Oliveira Botelho, Gustavo Maia de Almeida, Vinícius Antonio Ramos Pin, Daniel Cruz Cavalieri
A preocupação com a análise adequada dos resultados de retificação dos diferentes tipos de cilindros realizada na oficina é de grande importância para o processo de laminação. Sua classificação corret
Oct 1, 2019
-
Classification And Concentration Of Heavy Minerals In Grinding CircuitsBy A. L. Hinde
The recovery of heavy minerals by gravity concentration during grinding is practised widely in the minerals industry. Studies have shown that the grade and recovery of the concentrate depends not only
Jan 1, 1985
-
Classification and Control of Hazards in Underground Mines in PolandBy M Malec, J Szczerbinski
Hazards in underground mines are concomitant with the mining of mineral deposits and have their source in a minerÆs work environment. The authors of the paper have undertaken a trial classification of
Jan 1, 1999
-
Classification and Development in Grade Control Blasting for Surface MinesBy T N. Little
The grade control process undertaken at mines aims to maximise the value of the ore (valuable product) mined and fed downstream for processing or sale. The full range of grade control activities inclu
Aug 24, 2015
-
Classification and Nomenclature of Ore ReservesIn 1953, Dr. N. H. Fisher of the Bureau of Mineral Resources, acting on behalf of the Society of Economic Geologists, which is considering the sponsoring of a uniform system of nomenclature for ore re
Jan 1, 1955
-
Classification And Preparation Of Non-Ferrous Scrap Metals And AlloysBy H. F. Seifert
THE classification and preparation of non-ferrous scrap metals is a subject of interest to every individual and corporation that employs in its processes of manufacture non-ferrous metals and alloys a
Jan 1, 1928
-
Classification And Preparation Of Non-Ferrous Scrap Metals And AlloysBy H. F. Seifert
THE classification and preparation of non-ferrous scrap metals is a subject of interest to every individual and corporation that employs in its processes of manufacture non-ferrous metals and alloys a
Jan 1, 1928
-
Classification And Quantification of Ore Grain Textures of the Hilton North Deposit, Mount Isa, Queensland, AustraliaStudying the ore textures in a discrete orebody is a novel approach to estimating liberation potential of the ore minerals present. As part of a PhD thesis, this project aims at classifying and quanti
Jan 1, 1993
-
Classification and Rating of Inclusions in a High Carbon SteelBy M. Faraji
Inclusions formed in a high-carbon, manganese-silicon killed plain steel (Fe-0.77C wt%) were studied. Various techniques were used to characterise the inclusions, and the latter were classified accord
Jan 1, 2010
-
Classification at the Sullivan ConcentratorBy G. J. Knighton
Introduction The Sullivan concentrator treats the complex lead-zinc-iron ore from the Sullivan mine of the Consolidated Mining and Smelting Company of Canada, Limited, to make a lead and a zinc con
Jan 1, 1947
-
Classification effects in wet ball milling circuitsThe concept of classification in wet, closed circuit ball milling is expanded beyond the performance of the classifying equipment to include all aspects of the fines removal system of the grinding cir
Jan 1, 1987
-
Classification of Chock Shields Behaviour in an Indian Longwall Mine in Real TimeBy Srinivasulu Tadisetty
The productivity and safety of Indian longwall operations are insignificant because of complex geomechanical conditions. Therefore, the continuous monitoring and forecasting of abnormalities is impera
Jan 1, 2006
-
Classification Of Coals Of The United States According To Fixed Carbon And B.T.U.By W. A. Selvig
BY plotting fixed carbon against British thermal units of coals free from mineral matter, and ranging in rank from anthracite to lignite, it is found that the coals of higher rank, from anthracite to
Jan 1, 1934
-
Classification of large seismic events at Lucky Friday mineBy J. K. Whyatt, W. P. Blake, T. J. Williams
A study at the Idaho mine revealed that, despite the apparent randomness of seismic events, common characteristics defined five recurring types. These characteristics included the geological structure
Jun 19, 1905
-
Classification Of Large Seismic Events At The Lucky Friday MineBy J. K. Whyatt
The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of
Jan 1, 1996