Optimizing of gas-shielded metal arc welding parameters for 10.5-12.5% chromium steel using 308L electrodesBy J. W. van der Merwe, A. M. Maleka, V. J. Matjeke
The 10.5–12.5% chromium, titanium-stabilized ferritic stainless steel (FSS) plates used to fabricate coal line jumbo wagons is susceptible to undesirable chromium depletion during welding with 309L el
Apr 5, 2023
-
Optimizing of Roller Press Forming Cavity Profile Using Finite Element SimulationBy R. T. Dec
Current industrial compacting and briquetting practices are largely based on trial-and-error techniques. This paper introduces a two-dimensional finite element model of briquetting process in the roll
Jan 1, 2014
-
Optimizing Ore Recovery in Shallow-Dipping Orebodies (45-60 deg): A Framework for Stope Design, Drill and Blast, and Equipment SelectionBy Gurupraveen Ramanathan
Shallow-dipping orebodies (45°–60° dip) present significant challenges for underground longhole stoping, particularly due to limited gravity flow, drill misalignment near the footwall, increased poten
May 4, 2025
-
Optimizing Performance at the David Bell Mine ConcentratorBy K. Meyer
"The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den
Jan 1, 1991
-
Optimizing Performance in Heavy Equipment TeleoperationBy Jean-François Lapointe
Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi
May 1, 2001
-
Optimizing performance of AG/SAG mills – A design approachBy Sanjeeva Latchireddi, Travis Orser
"Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th
Jan 1, 2005
-
Optimizing Pillar Design In A Multi-Seam EnvironmentBy R. Kanniganti
The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec
Jan 1, 1995
-
Optimizing pit shells in the presence of geologic uncertainty with a heuristic algorithm - SME Transactions 2018By C. V. Deutsch, T. Acorn
Understanding and managing risk is of increasing concern for the mining industry. Although methods exist to model geologic uncertainty based on stochastic modeling techniques and multiple realizations
Jan 1, 2018
-
Optimizing Pit Slopes At The Bougainville Copper Mine, Papua New GuineaThe height of permanent slopes at the Panguna mine of Bougainville Copper Limited will vary from 350 to 950 metres. A few degrees difference in slope angle has a large effect on the ore/waste strippin
Jan 1, 1987
-
Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling OperationBy Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe
"Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan
Jan 1, 2011
-
Optimizing plant efficiency with attrition scrubbersBy Mike Preston
Attrition scrubbers may not be glamorous, but they are an important and sometimes neglected step in mineral processing. Optimal attritioning will significantly improve the results and efficiencies of
Oct 1, 2013
-
Optimizing Plant Facilities LocationBy R. D. Hossack
"The selection of a site for plant facilities is a function of several factors and has as its objective the maximization of profits, given fixed markets and sources of raw material locations. In pract
Jan 1, 1970
-
Optimizing process control with near infrared online analysis: Case studies in sinter and gold ore processing, P. Mühlen and C. NelsonBy P. Mühlen, C. Nelson
Process control optimisation depends a lot on the availability of timely data from production to give operators a chance to make adjustments before potential process upsets or disruptions happen. A lo
Jan 1, 2020
-
Optimizing Profitability Of Heap LeachingBy Ken Deter
I have some general comments on optimizing profitability based on working in heap leach operations in tropical environments. Many of my planned comments this morning have been stated earlier in the Co
Jan 1, 1999
-
Optimizing Quarry Blasting Techniques and Designs Over a Wide Range of Geologic ConditionsBy Victor C. Bryan
One of the most sought after answers in any consideration of blasting activities relative to mines and quarries is how to safely and efficiently use explosives. While that discussion might be relative
Jan 1, 1991
-
Optimizing Rare Earth Recovery: Gravity and Magnetic Separation Strategies for Halleck Creek - SME Annual Meeting 2026By Justin Reed, Sara Bewley, Dwight M. Kinnes, Maryam Sadeghi, Ed Hart
This study compares wet gravity and dry magnetic separation for preconcentrating an allanite-rich rare earth ore from the Halleck Creek deposit. Material in the –300/+86 μm size range was treated to d
Feb 22, 2026
-
Optimizing Rebar Resin AnnulusBy P. Todd, K. Dever, P. S. Mills, A. A. Campoli
Resin bolt performance is dependent on the size of the resin annulus, the difference between the hole and bolt radii. The vast majority of the millions of resin roof bolts installed each year in the
Jan 1, 2000
-
Optimizing Roof Truss Installations With Body-Loaded Photoelastic Models (150067f0-db33-4d29-8f14-e56f4191dd7d)By Christopher Haycocks, Lawrence P. Johnson, George M. Neall, James M. Townsend
No method of roof control yet devised has proven to be universally acceptable for the wide range of strata conditions experienced in U. S. coal mines. However, a relatively new innovation, the roof tr
Jan 1, 1979
-
Optimizing Roof Truss Installations With Body-Loaded Photoelastic Models (4e512a82-75d6-4685-98e3-857d3836994b)By Neall. George M.
No method of roof control yet devised has proven to be universally acceptable for the wide range of strata conditions experienced in U.S. coal mines. However, a relatively new innovation, the roof tru
Jan 1, 1977
-
Optimizing Rotary Furnace Smelting Of Battery ResidueBy Federico Chavez
The process for recovering lead from battery residues used in several Mexican Plants include lead blast furnace and rotary furnaces. The formers are basically fed with recycled batteries together with
Jan 1, 1995