Search Documents

  • CIM
    Optimization of Process Variables During TLP Bonding of Nickel Superalloys

    By M. Medraj, M. A. Arafin, D. P. Turner, P. Bocher

    In this study, the kinetics of isothermal solidification during TLP bonding of Inconel 625 and 718 superalloys with nickel based multi-component filler alloy BNi-2 have been studied through a combinat

    Jan 1, 2006

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • IMPC
    Optimization Of Rougher Wet High Intensity Magnetic Separator To Recover Ilmenite From Placer Heavy Minerals

    By T. Laxmi

    This paper details the optimization of rougher Wet High Intensity Magnetic Separator (WHIMS) using response surface methodology. The optimization is in parametric form and takes account of the major o

    Sep 1, 2012

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • SAIMM
    Optimization of shape factor by the response surface method, and the effect on sphalerite flotation recovery

    By T. Uysal

    Various morphological parameters that affect the flotation recovery of sphalerite were modelled and optimized using the response surface method (RSM). The effects of roughness value, shape factor, and

    Sep 6, 2023

  • SAIMM
    Optimization of shift cycles in the South African mining sector

    By J. Pelders, F. Magweregwede, S. M. Rupprecht

    Increased depths of conventional gold and platinum mines, longer travelling times as working places move further from the shaft, and ancillary activities taking place in the mining cycle reduce the us

    Aug 1, 2021

  • SME
    Optimization Of Shovel Dipper-Formation Interactions In Excavation

    By S. Frimpong

    Shovel excavation constitutes a significant component of production costs in any surface mining operation. This makes shovel loading an important cost center that needs to be improved to lower product

    Jan 1, 2011

  • SAIMM
    Optimization of shovel-truck system for surface mining - Synopsis

    By S. G. Ercelebi

    In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and dispatch the

    Jan 1, 2009

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • IMPC
    Optimization Of Simultaneous Leaching Of Gold And Silver From A Refractory Gold Ore

    By M. Saba

    In cyanide leaching procedure, achieving an acceptable efficiency for silver and gold is very time-consuming, thus, enough studies have not been performed for optimization and modeling of this process

    Sep 1, 2012

  • TMS
    Optimization of Slag Composition and Operating Temperature for Smelting of Canadian Chromites

    By B. C. Jena

    In a chromite smelting process for the production of high-carbon ferrochromium, the slag composition profoundly affects operating conditions and the economic performance of the process. For a Canadian

    Jan 1, 1994

  • CIM
    Optimization of Sputtered Ti/Mo/ Au Metallization System for Solder Bonding

    By S. Akhlaghi

    In many electronic/optoelectronic devices, interaction between the metal stack and solder is undesirable. If a reaction happens, a nonuniform joint containing spikes and voids is likely to form and as

    Jan 1, 2006

  • SME
    Optimization of surface mining dig limits with a practical heuristic algorithm

    By Y. V. Vasylchuk

    An algorithm is presented for optimizing the classification of surface mine material subject to excavating constraints. High-resolution, expected-profit models are optimized to classification maps sub

  • SME
    Optimization of Surface Mining Dig Limits with a PracticalHeuristic Algorithm Mining, Metallurgy and Exploration

    By Y. V. Vasylchuk

    This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif

  • SME
    Optimization of tellurium and antimony extraction from residue generated in alkaline sulfide leaching of tellurium-bearing alkaline skimming slag

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    Tellurium (Te) is an important scattered metal. Known as the vitamin of modern industry, national defense and cutting-edge technology, it is the supporting material for new high-technology materials.

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • TMS
    Optimization Of The Asarco East Helena Water Treatment Plant For Removing Arsenic And Metals

    By Douglas K. Modrow

    In the fall of 1993, construction was completed on a state of the art industrial waste water treatment plant at Asarco's East Helena Lead Smelter. Purpose of the plant was to remove arsenic and m

    Jan 1, 1996