Search Documents

  • SME
    Optimization Of Heavy Media Cyclone Circuits

    By T. S. Bomar, C. J. Wood

    Heavy media cyclones (HMCs) are efficient, high-tonnage devices suitable for upgrading run-of-mine coal in the 50 to 0.5 mm size range. Unfortunately, industrial HMC circuits are often not optimized

    Jan 1, 2002

  • ABM
    Optimization Of High Quality Production In Hot Rolling Mills Using Advanced Process Models

    By Detlef Ehlert

    Flexibility in terms of producing high sophisticated products with an exceptional wide range of properties and dimensions requires physical based process models for the generation of optimal set point

    Aug 16, 2017

  • SME
    Optimization of High‑grade Fluorspar Recovery from Rare Earth Element Carbonatite Deposit Using Column Flotation

    By Kristin K. Mueller, Lucie Coudert, Thi Yen Chau Nguyen, Lan Huong Tran, Jean‑François Blais, Guy Mercier

    Fluorite (calcium fluoride—CaF2), also known as fluorspar, is an industrial mineral used in metallurgy, hydrofluoric acid production, and ceramics manufacturing. Based on the results from a previous s

    Sep 9, 2022

  • SME
    Optimization Of Hydraulic Haulage Systems In Underground Coal Mines

    By Hasan Sevim

    This paper summarizes recent developments in modeling of underground coal slurry haulage networks for determination of optimum design and operating parameters. The model presented here is based on a s

    Jan 1, 1983

  • SME
    Optimization of Induration Cycle for Magnetite Concentrate and its Usage in Pellet-Making Process Designed for Hematite Concentrate "Mining, Metallurgy & Exploration (2021)"

    By Sah Rameshwar, T. Umadevi, K. S. SRIDHARA

    In the magnetite iron ore pelletization process, oxidation of magnetite followed by sintering of the oxidized magnetite (hematite) is desirable. Optimum preheating time & temperature and roasting time

    Oct 26, 2020

  • SAIMM
    Optimization of Iron Ore Blending in the COREX Shaft Furnace

    By C. Liu, F. Ye

    "To extend the variety of lump ores that are used in the COREX shaft furnace and to optimize iron ore blending, the original evaluation method for iron ores that was proposed by Voestalpine AG has bee

    May 1, 2019

  • SAIMM
    Optimization Of Mechanized Mining Layout Within Anglo American Platinum

    By P. Valicek

    Anglo American Platinum Limited is constantly striving to improve safety and productivity. There are many different initiatives taking place within the organization in order to ensure continued safe

    Jan 1, 2012

  • TMS
    Optimization Of Microwave Drying Of Salt With Response Surface Methodology

    By Hong-ying Xia, Bao-bao Wang, Jin-hui Peng, Bing-guo Liu, Li-bo Zhang, Zhi-qiang Li

    Based on optimization using response surface methodology designed by Box- Behnken, to study the interaction of wet industrial salt with moisture drying temperature (50-90 ); duration (10-50s); and the

    Jan 1, 2015

  • CIM
    Optimization of Microwave-Ultrasound Assisted Leaching of Copper Anode Slime Based on Central Composite Design

    By Z. Y. Ma, H. Y. Yang

    The process of microwave-ultrasound assisted leaching of valuable metals from copper anode slime was proposed in this paper. Design of experiments has been used to study the effect of the main leachin

    Jan 1, 2014

  • SAIMM
    Optimization of mill performance by using online ball and pulp measurements - Synopsis

    By B. Clermont

    Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min

    Jan 1, 2010

  • SME
    Optimization of Millennium Chemical’s Paraiba Guaju Mine

    By K. G. Correia

    The replacement of the dry mining method at Guajú Mine by the dredging method was a means of ensuring its feasibility by maintaining the production levels. Dry mining increased the cost of the deposit

    Jan 1, 2005

  • AIME
    Optimization of Mining Engineering Design in Mineral Valuation (53621704-1aa1-4f26-94e5-d161ceda6e6c)

    By Roy C. Kirkman

    It is with great pleasure that I read Mr. Howard M. Wells article in the December 1978 issue of MINING ENGINEERING entitled: "Optimization of Mining Engineering Design in Mineral Valuation." Mr. Wells

    Jan 4, 1979

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • IOM3
    Optimization of ore pass spacing in vein deposits

    By J. Cech

    Discussion is presented of a decision-making support method for the spacing of ore passes along a long vein orebody and the division of the orebody into convenient stopes for future mining operations.

    Jun 18, 1905

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada&apos;s largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • SME
    Optimization Of Power For Off-Highway Haul Units

    By G. T. Lineberry

    Horsepower requirement is recognized as a most important equipment characteristic. Other critical equipment characteristics will be isolated and analyzed by traditional operations research techniques,

    Jan 1, 1984

  • CIM
    Optimization of POX-CIL Process for Refractory Gold-Bearing Concentrates Treatment

    By Y. Y. Yemelyanov, S. S. Gudkov, A. V. Boldyrev, A. V. Bogorodskiy, S. V. Balikov

    "A series of tests to optimize pressure oxidation- carbon-in-leach process (POX-CIL) of goldbearing flotation concentrate with the addition of sodium chloride and activated carbon were carried out. Fl

    Jan 1, 2016

  • TMS
    Optimization of Preparation of U3O8 by Calcination from Ammonium Diuranate Using Response Surface Methodology

    By Bingguo Liu, Daifu Huang, Jinhui Peng

    "The conditions to prepare U3O8 by calcination from ammonium diuranate were optimized, and the response surface design method was applied to analyze the influence on the total uranium and U+4 of calci

    Jan 1, 2011

  • IMPC
    Optimization of Process Conditions for Recovery of Additional Clean Coal from Tailing of Flotation Circuit of an Existing Coking Coal Washery of India Using Response Surface Methodology.

    By Sanjay Chaudhuri, V. K. Kalyani, Pradeep Kumar Singh, T. Gouri Charan

    "Indian coal industry is the world's third largest in terms of production and fourth largest in terms of proven coal resources. Indian coal deposits are generally of high ash content varying from 24 t

    Jan 1, 2018