Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
Optimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based RulesOptimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based Rules
Sep 13, 2010
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Optimisation of the Prominent Hill SAG MillBy Mark Weidenbach
OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a
Jan 1, 2012
-
Optimisation of the Sepon Copper Milling CircuitBy A Jakowetz
OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho
Jan 1, 2006
-
Optimisation of Wash Water on an Iron Ore Spiral to Improve GradeBy C M. Ramotsabi, F Bornman, W Erasmus
Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine
Jul 13, 2015
-
Optimisation Opportunities for High Pressure Grinding Rolls CircuitsBy B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson
The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on
Oct 29, 2012
-
Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, IndonesiaBy H Indirawati, R Ayres, A Nur Kasnanto, S Konopa
As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current
Nov 21, 2018
-
Optimised Layout And Roadway Support Planning With Integrated Intelligent SoftwareBy S. Kouniali
Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO
Jan 1, 1996
-
Optimised Process Control in Iron Ore via Online Analysis of Light ElementsBy L Köresaar, J Moilanen
With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia
Jul 13, 2015
-
Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales ContractsBy J Zhang, R Dimitrakopoulos
A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s
Nov 24, 2014
-
Optimising a Reflux Classifier circuit, P. Ramsaywok, G. Legodi, and S. NdanduleniBy P. Ramsaywok, S Ndanduleni, G. Legodi
The objective of this paper is to share the optimisation journey of a pilot Reflux classifier (RC) circuit in the Exxaro GG1 plant, at Grootegeluk beneficiation complex in Lephalale, South Africa. The
Jan 1, 2020
-
Optimising Assessment and Selection with Indigenous People in Remote CommunitiesBy P Davidson
For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig
Jan 1, 2006
-
Optimising Blasting Operations through Rock Characterisation and Computer Modelling-Progress in AustraliaBy Favreau RF
Over the last 20 years the blasting industry has progressed from the stage of being artform to a science as it is today. The use of computers to simulate blasting results has allowed blasting engi
Jan 1, 1986
-
Optimising blend ratios, grinds, and reagent schemes to recover platinum group metals from lower group reef spiral tailingsBy J. Sehata, J. Tshilongo, I. Govender, S. Pikinini, T. L. Moodley, M. Raedani
In the face of dwindling Merensky ore reserves in the early 1990s, Mintek developed the MF2 flotation circuit to economically recover platinum group metals from the shallow upper group-2 chromitite re
Mar 6, 2026
-
Optimising carbon reactivation kiln operationBy R Bezuidenhout, J K. Claflin, S R. La Brooy, G M. Wardell-Johnson, A M. Claflin
Best practice gold (Au) recovery is not an accident. It is the result of proper operation of the adsorption circuit using good quality activated carbon. A conventional carbon ‘regeneration’ kiln canno
Sep 11, 2017
-
Optimising Chemical Cost in Fine Coal Flotation at Bhelatand Coal Preparation PlantBy Atul Bhatnagar, M. P. Sinha, Md Zahid Ahmad, Pallav Garg, Sanjay Kumar Singh, Shashi Ranjan, An Ecolab Company Nalco Water
"Froth Flotation is undoubtedly one of the most critical processes in coking coal washing plants. This work was carried out at Bhelatand Coal Preparation Plant of Tata Steel was with an objective of c
Jan 1, 2016
-
Optimising Coal Dust Suppression Factors in a Laboratory Using a Three-Level Factorial ApproachBy Tien J. C
Many factors (type of coal mined, water pump pressure, wetting agent concentration, etc) will affect the performance of a dust suppression system using a water spray in an underground coal mine. Whi
Jan 1, 1994
-
Optimising Collector Performance In The Production Of High Grade PGM Concentrates - Preprint 09-115By J. Wiese
Recently the operating philosophy at concentrators processing platinum bearing ores has started to move from a recovery dominated system to one in which the production of high grade concentrates at th
Jan 1, 2009