Optimisation of Grinding Process in a Magnetite Ore Beneficiation PlantBy M. D. Vilarinho, W. Xuan, F. Vasconcelos Guimarães
"This article summarises the efforts to reduce the energy consumption in grinding in a magnetite ore beneficiation plant. ArcelorMittal Kryvyi Rih ore beneficiation plant produces magnetite concentrat
Jan 1, 2018
-
Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes MinesBy F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan
"Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th
Oct 10, 2016
-
Optimisation of Length of Retreat Longwall FacesBy Misra A
After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o
Jan 1, 1995
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of CyanicidesBy B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon
Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The
Sep 26, 2013
-
Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021By Z. Saw, C. Poveda, N. L. Mai
Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo
Sep 1, 2021
-
Optimisation of Process Parameters of Spiral Concentrator for Beneficiation of Iron Ore Stacked Slimes from Kirandul, Chattisgarh, IndiaBy S. K. Sharma, Sanket Bacchuwar, Prabal Kumar Agrwal, G. V. Rao
"Iron ore processing industries play a vital role in the Indian economy. At present Iron ore of around +64% Fe is used for production of Iron through blast furnace. To produce +64% Fe from low/medium
Jan 1, 2016
-
Optimisation of Production Capacity for Maximum Profitability of a Copper Mine at Rio Tinto, SpainBy J. A. Botin, K. H. Singh
INTRODUCTION The Alfredo underground mine is one of the three mining operations of Rio Tinto Minera, S.A., all near the community of Rio Tinto in Huelva province of southwest Spain. The other two
Jan 1, 1981
-
Optimisation of Reinforcement Design of Coal Mine RoadwaysBy Fabjanczyk MW, Guy RJ, Tarrant GC
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi
Jan 1, 1992
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
Optimisation of Rock Disintegration Based on Acoustic Background of Drilling MachineBy J Fut=
The rotary drilling of rocks is widespread technology in mining and in tunnelling. The paper describes the results of research by aim to find relationships between optimal drilling and sound signal of
Jan 1, 2003
-
Optimisation Of SiMn Production At TransalloysBy J. Griesel, P. H. F. Bouwer, K. Bisaka
Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon
Jan 1, 2004
-
Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon MineBy I. Demers
Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were
Jan 1, 2008
-
Optimisation of Slope Angles at Rosario Mine, CollahuasiBy A R. Bonani, M P. Pe±a
The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p
Jan 1, 2007
-
Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge DistributionBy S. Ranganathan
Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo
Jan 1, 2007
-
Optimisation of Spray Collers for Cooling Deep Coal MinesBy Hagen G, Uhlig H
In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa
Jan 1, 1988
-
Optimisation of surface tailings storage and tailings backfill – a case studyBy B P. Wrench, N R. Steward, C Wu
A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi
Jul 23, 2018
-
Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, FinlandOptimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland
Sep 13, 2010
-
Optimisation Of The Ball Mill Circuit Using A Simulator In Conjunction With Measurements From A Non-Intrusive SensorThe ball level and pulp load play a key role in the operation of industrial scale ball mills. These two operating variables have a significant influence on the performance of the ball mill and any att
Sep 1, 2012
-
Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional SimulationBy J Bower
The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t
Jan 1, 2009