Search Documents

  • IMPC
    Optimisation of Grinding Process in a Magnetite Ore Beneficiation Plant

    By M. D. Vilarinho, W. Xuan, F. Vasconcelos Guimarães

    "This article summarises the efforts to reduce the energy consumption in grinding in a magnetite ore beneficiation plant. ArcelorMittal Kryvyi Rih ore beneficiation plant produces magnetite concentrat

    Jan 1, 2018

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of Cyanicides

    By B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon

    Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The

    Sep 26, 2013

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021

  • CIM
    Optimisation of Process Parameters of Spiral Concentrator for Beneficiation of Iron Ore Stacked Slimes from Kirandul, Chattisgarh, India

    By S. K. Sharma, Sanket Bacchuwar, Prabal Kumar Agrwal, G. V. Rao

    "Iron ore processing industries play a vital role in the Indian economy. At present Iron ore of around +64% Fe is used for production of Iron through blast furnace. To produce +64% Fe from low/medium

    Jan 1, 2016

  • AIME
    Optimisation of Production Capacity for Maximum Profitability of a Copper Mine at Rio Tinto, Spain

    By J. A. Botin, K. H. Singh

    INTRODUCTION The Alfredo underground mine is one of the three mining operations of Rio Tinto Minera, S.A., all near the community of Rio Tinto in Huelva province of southwest Spain. The other two

    Jan 1, 1981

  • AUSIMM
    Optimisation of Reinforcement Design of Coal Mine Roadways

    By Fabjanczyk MW, Guy RJ, Tarrant GC

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi

    Jan 1, 1992

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • AUSIMM
    Optimisation of Rock Disintegration Based on Acoustic Background of Drilling Machine

    By J Fut=

    The rotary drilling of rocks is widespread technology in mining and in tunnelling. The paper describes the results of research by aim to find relationships between optimal drilling and sound signal of

    Jan 1, 2003

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • SME
    Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon Mine

    By I. Demers

    Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were

    Jan 1, 2008

  • AUSIMM
    Optimisation of Slope Angles at Rosario Mine, Collahuasi

    By A R. Bonani, M P. Pe±a

    The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p

    Jan 1, 2007

  • SAIMM
    Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge Distribution

    By S. Ranganathan

    Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo

    Jan 1, 2007

  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa

    Jan 1, 1988

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010

  • IMPC
    Optimisation Of The Ball Mill Circuit Using A Simulator In Conjunction With Measurements From A Non-Intrusive Sensor

    The ball level and pulp load play a key role in the operation of industrial scale ball mills. These two operating variables have a significant influence on the performance of the ball mill and any att

    Sep 1, 2012

  • AUSIMM
    Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

    By J Bower

    The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t

    Jan 1, 2009