Search Documents

  • AUSIMM
    Optimal Blast Scheduling of Sub-Level Stoping by Dynamic Programming

    By Bhattacherjee A, Makesh S

    Mechanised sub-level stoping is one of the most widely accepted stoping practices followed in base metal mines in India. As a general practice, blast-scheduling of rings in these stopes is done eith

    Jan 1, 1995

  • AUSIMM
    Optimal Block Estimation by Kriging

    A comparison is made between elementary block estimation techniques and the optimal methods of geostatistics using data from an Australian deposit. Considerable improvement in the estimates are obtain

    Jan 1, 1975

  • SAIMM
    Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction

    By Jeremy Bosman, Johan de Korte

    Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f

    Jan 1, 2006

  • SME
    Optimal Control Of Coal Segregation Using On-Line Quality Analyzers (ab241cd8-bed9-4157-9f70-475e68db74c3)

    The capability for on-line measurement of the quality characteristics of conveyed coal now enables mine operators to take advantage of the inherent heterogeneity of those streams and split them into w

    Jan 1, 1998

  • ISEE
    Optimal Delay Periods and Complex Timing Sequences Using Electronic Delay Detonators

    By Y. Idrogo

    Electronic delay detonators have been used in most types of blasting application with great success, with the accuracy and precision being used effectively to control negative environmental impacts li

    Jan 1, 2018

  • SME
    Optimal Design and Digital Prototyping of E-Volute and E-Duc Feedwell - SME Annual Meeting 2026

    By Thien Sok, Yaojun Lu, Craig Gilbert, Jeremy Scott

    Feedwells play a pivotal role in gravity thickeners, governing flow distribution, feed dilution, and flocculation condition during solid–liquid separation. This study presents an optimized design and

    Feb 22, 2026

  • SME
    Optimal Design Of Mining Panels For Truck-Shovel Operations In Large Surface Coal Mines

    By Y. Xi

    This paper offers an algorithm to determine the optimal panel size with the objective of minimizing the overall stripping cost. The approach is presented both in analytical form for regular layers of

    Jan 1, 1994

  • SME
    Optimal Design Of Underground Openings

    By S. J. Jung

    The prime criteria in the design of underground openings with complicated geological structures is ground control. Stability of underground openings for deep mines is critical because incorrect orient

    Jan 1, 1993

  • SME
    Optimal Drill Hole Location Using Geostatistics

    By M. E. Gershon

    Conventional methods of drill hole site selection are reviewed briefly. Two approaches using geostatistics are then discussed, both of which have been shown to yield improved results. Finally, a branc

    Jan 1, 1985

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • SME-ICGCM
    Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface Structures

    By Arka Jyoti Das, Prabhat Kumar Mandal

    "Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv

    Jan 1, 2016

  • TMS
    Optimal Filtering Applied to the Vacuum Arc Remelting Process

    By Rodney L. Williamson

    Optimal estimation theory has been applied to the problem of estimating process variables during vacuum arc remelting (V AR), a process widely used in the specialty metals industry to cast large ingot

    Jan 1, 2001

  • AUSIMM
    Optimal goaf hole spacing in high production gassy Australian longwall mines – operational experiences

    By B Belle

    In a predrained gassy coalmine, ventilation control plays a secondary role to the longwall (LW) goaf drainage systems to safely manage panel return gas levels. Typically, the LW specific gas emission

    Aug 28, 2017

  • SME
    Optimal Grade Control Using Geostatistics And Economics: Methodology And Examples (0cbcdec1-207d-4fc8-8d49-cd716d6fcdc7)

    An important problem in mine operations is the classification of material as waste, low-grade stockpile, and ore. This classification must often be made with blasthole data that are widely spaced and

    Jan 1, 1999

  • AUSIMM
    Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral Sands

    By T Wambeke, J Benndorf

    A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att

    Nov 24, 2014

  • TMS
    Optimal Leaching On Hydrometallurgical Process of Recycling Batteries Using Less Energy and Reactants

    By Felipe Costa Hashimoto Bertin, Jorge Alberto Soares Tenório, Rodrigo de Souza Dalti Pereira, Denise Crocce Romano Espinosa

    "The increasing amount of portable devices and their fast obsolescence generates an increasing quantity of discarded batteries. The recycling process of discarded batteries allows the recovery of meta

    Jan 1, 2014

  • ABM
    Optimal Mixing And Granulation Process For Fine Utilization In Sinterplants

    By Gergö Rimaszéki

    Due the fast growing of pig iron and steel in the last years associate with some mineral resources changes (Hematite?Itabirite), has been checking the sinter feed degradation. The typical sinter feed

    Aug 17, 2017

  • AUSIMM
    Optimal ore blending given geological uncertainty

    By M Forbes, R Jeuken

    Brownfields geoscience measurement such as drilling and surface geophysics can be costly and it is often difficult to weigh the cost of data collection and processing against the value it unlocks at t

    Mar 22, 2022

  • SME
    Optimal Orebody Reconstruction And Visualisation

    The authors summarise the development and recent advances in the reconstruction and visualisation of three-dimensional objects from point data and describe applications to the reconstruction of orebod

    Jan 1, 2002

  • CIM
    Optimal Oxygen Allocation to Maximize Copper Smelter Throughput

    By Alessandro Navarra, Roberto Parra, Boyd Davis, Frank Mucciardi

    A smelter scheduling algorithm has been developed, which allocates the oxygen production between the smelting furnace and the converter aisle, so as to maximize copper throughput. The algorithm is i

    Jan 1, 2015