Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
No entry mechanised presink of the Wira Hoisting ShafBy D Kilkenny
This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min
Mar 29, 2023
-
No Further Coal-Mining Scholarships But Interest Continues in the PlanBy GEO H. DEIKE
NOT much activity has been evident during the past year in the establishment of co-operative scholarships but the interest among the coal-mining companies is more pronounced than ever. This is apparen
Jan 1, 1943
-
No Net Loss and Offsite Mitigation: Is New Zealand Mature Enough for a Win-Win Situation?By S Christensen
In August 2001 the Minister for Conservation declined an application by GRD Macraes for an access arrangement to enable work at the Globe Progress Mine near Reefton. In her decision, Ms Lee said:æI ha
Jan 1, 2002
-
No Steel for 400 Civilian ArticlesBy AIME AIME
WHEN the War Production Board issued its order which will end the use of iron and steel in more than 400 familiar civilian articles, the list of those products formed a fascinating and homeric catalog
Jan 1, 1942
-
No+Pb: Boyas descontaminadoras para lagos en zonas de influencia agrícola y ganadera basada en nanocompuestos de arena y grafito costo-eficiente, biodegradable y de fácil uso e instalación para la reducción de plomo y otros metales pesadosBy María Quintana, Roger Veramendi, Gerald Salazar, Clemente Luyo, Noe Cabanillas
En este trabajo se presenta un sistema autónomo para remoción de plomo de efluentes mineros con monitoreo remoto, cuyo sistema opera a base de un novedoso material adsorbente, que se presenta en este
Sep 20, 2019
-
No. 1 Queens Road - Melbourne, AustraliaBy Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005
-
No. 2 Open Hearth Plant at Port KemblaBy Edmonds W, Jeffcoat R
The completion of the first two open hearth furnaces in the new No. 2 open hearth plant at Port Kembla will increase Australian production of steel by 350,000 tons of ingots per annum.The paper gives
Jan 1, 1957
-
No. 2 Shaft Raise, Aunor Gold Mines, Ltd.By G. H. Montgomery
THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the
Jan 1, 1957
-
No. 3 ChangehouseWith the sinking of the No. 3 Shaft at North Broken Hill Limited, it was necessary to construct adjacent to the shaft a new changehouse for mining and surface personnel.It was also probable that as th
Jan 1, 1957
-
No. 3 HeadframeTo finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa
Jan 1, 1957
-
No. 3 Shaft Sub-Brace AreaWith the sinking of the No. 3 Shaft and the erection of a changehouse nearby, a sub-brace level structure was provided incorporating a time office, underground foremenÆs office and lamp room, in conju
Jan 1, 1957
-
No. 3 Shaft Winders and Winder HouseThe sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were
Jan 1, 1957
-
No. 3 Tankhouse at Onahama Smelter and RefineryBy H. Ikeda
The new Onahama N0.3 tankhouse was put into operation early in 1973. This new tankhouse, which has a capacity of 90,000 metric ton cathode per year, is distinct in many important respects from convent
Jan 1, 1976
-
No. 3 Ventilation Shaft: Shaft-Sinking EquipmentWith the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink
Jan 1, 1957
-
No. 4 I.S.F. Smelter Complex Of Imperial Smelting Corp., Ltd., Avonmouth, EnglandBy R. M. Sellwood
The No. 4 I.S.F. Smelter Complex at the Avonmouth Works of Imperial Smelting Corporation (N.S.C.) Limited commenced operation at the beginning of 1968. The furnace rating is 120,000 tons zinc and 40,0
Jan 1, 1970
-
No. 6 Concentrator Operations at. Brunswick Mining and Smelting Corporation LimitedBy R. T. Erskine
"The No. 6 orebody is located 6 miles from the main op.eration of Brunswick Mining and Smelting Corporation Limited and includes open-pit and primary gyratory crushing facilities. Ore is transferred b
Jan 1, 1971
-
No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New TunnelsBy Aram Grigoryan
This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the
-
No. 7 subway line project advances with Atlas Copco rigs and toolsBy Scott Ellenbecker
Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par
Jan 3, 2010
-
No. 8 Shaft, Britannia MinesBy Paul W. Billwiller
Introduction In 1937, the Britannia Mining and Smelting Company, Limited, was carrying on an extensive exploratory diamond-drilling programme. Most of this drilling was done on the 4100 level, the
Jan 1, 1946
-
NO2:NOx Ratios in Australian Road TunnelsBy P Gehrke, S O’Gorman
The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire
Sep 17, 2014