Search Documents

  • SME
    Management Of Risk Associated To The Design Of Block Caving Mine: A Case Study On Chuquicamata Underground Mining Project

    By R. R. Guzman

    In this study, the "Mine Project Risk Management" methodology, MPRM (Botin et al. 2011), has been applied to characterize the sources of uncertainty and to quantify risk in the mining engineering sta

    Feb 23, 2014

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Management of Seam Gas Emission and Spontaneous Combustion in a Highly Gassy, Thick and Multi Seam Coal Mine ù A Learning Experience

    This paper describes operational experience with seam gas and spontaneous combustion management, gained during ten years of production history (1993 to 2003) in the Wynn seam at Dartbrook Coal mine. I

    Jan 1, 2005

  • SAIMM
    Management of seismic and swelling ground

    By P. N. Erasmus

    This paper considers the fundamental concepts of support design for underground openings in highly stressed ground. It concludes that the conventional deformed reinforcing bar, woven mesh and cable la

    Jan 1, 2009

  • AUSIMM
    Management of Seismicity at the Beaconsfield Gold Mine, Tasmania

    By A R. Penney

    Since mining-induced seismicity first became apparent at the Beaconsfield Gold Mine in 2002, there has been an ongoing program of geotechnical investigations to understand the phenomenon and allow for

    Jan 1, 2008

  • CIM
    Management of Squeezing Ground Conditions at Laronde Mine

    By P. Turcotte, E. Karampinos

    "Construction of underground excavations in squeezing ground conditions faces several technical challenges that can result in delays in production and high costs due to rehabilitation. A review of the

    Jan 1, 2015

  • SAIMM
    Management Of Subsidence Associated With The Mining Of The Roof Of The Sishen Cave. An Application Of The Slope Stability Radar

    By Glen Mc Gavigan

    The roof of the Sishen cave is being mined in order to exploit 6.8Mt of high grade ore. The cavity is filled with quartzite backfill in order to support the roof in the event of collapse. The cave d

    Jan 1, 2006

  • AUSIMM
    Management of Technical Risk for the Ravensthorpe Nickel Project

    By R Fury, I Skepper, D White, G Miller

    Although the Pressure Acid Leaching (PAL) of nickel laterites has been conducted at Moa Bay, Cuba, since the early 1960s, the commissioning delays generally encountered by the æsecond generationÆ of P

    Jan 1, 2004

  • SAIMM
    Management of the Nkomati Mine Crusher Slope Failure

    By R. Armstrong

    Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run

    Jan 1, 2014

  • SME
    Management of the Water Inflows During Construction of the Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) - RETC2021

    By Francesco Chiappalone, Miriam Piemontese, Lance Waddel, Paolo Perazzelli, Emidio Tamburri, Roberto Schuerch

    The Three Rivers Protection & Overflow Reduction Tunnel is part of the Long-Term Control Plan of the City of Fort Wayne, Indiana (USA). The 4.9 m internal diameter tunnel, of length approximately 7.5

    Jun 13, 2021

  • CIM
    Management of Thorium and Uranium in Mining and Processing of Rare Earth Minerals

    "Ore deposits containing rare earth elements normally contain small amounts of the radioactive elements thorium (Th) and/or uranium (U). These are the naturally-occurring isotopes U238, U235, and Th23

    Jan 1, 2012

  • SME
    Management Of Ventilation During A Disaster

    By D. W. Mitchell

    Never increase, reduce, or remove ventilation without unquestionable, compelling reasons. This rule applies every day as well as when fighting fire, attempting to find survivors, or recovering the min

    Jan 1, 1993

  • SME
    Management of Water Quality in a Flooded Tailings Impoundment

    By David Brown, Glen Hall, Ken DeVos, Frank Barone

    Dredging and Flooding was completed on the Falconbridge Limited "New Tailings Area" in the period from 1996 through 1998, as part of their site closure measures. Part of the decision making process an

    Jan 1, 2000

  • SME
    Management Reporting and Cost Control-A Better Way

    By Clark Woodland, William E. Stanley

    Mining companies have been required to enter a "new era of management" in the 1980's as they strive to become more efficient in an increasingly competitive market place. One response for many com

    Jan 1, 1987

  • AUSIMM
    Management Strategies for Mineral Education in the 1990's

    Education for the Mineral Industry in Australia developed in an uncoordinated but effective fashion till the mid 1960's, with recognised quality in graduates, with output matching demand, and

    Jan 1, 1984

  • SME
    Management styles and employee attitudes will change, but US mining will still need export trade

    By Steve Karl

    Introduction Technological advances in mining and processing have started the domestic mining and mineral industry back on the road to competitiveness. A massive trade deficit, however, coupled

    Jan 3, 1987

  • CIM
    Management systems in action the Campbell Mine story

    By Tim Mann

    "Like other operating mine sites, Placer Dome Inc. - Campbell Mine has taken important steps over the last few years to address environmental issues.This paper will provide specific insights into the

    Jan 1, 1991

  • AUSIMM
    Management Technology for Optimising Production Rock Breakage Processes

    It is no longer adequate in running mines and quarries to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency. This requires efficie

    Jan 1, 1995

  • AUSIMM
    Management' as Presented to Engineering Students

    Currently all engineering schools face a common problem, an ever expanding technological base which must be presented to students within a fixed time period. Traditionally the programmes of study

    Jan 1, 1980

  • ISEE
    Management's Effect on Drilling and Blasting

    By Alan R. Gadberry

    To resolve drilling and blasting problems, rather than treating symptoms and allowing problems to grow, the mine operator needs to change the way he operates. When a mine operator discovers a drilling

    Jan 1, 1985