Search Documents

  • CIM
    Hoisting at the Stobie Mine

    By A. M. Cameron

    THE HOISTING PLANT at the Stobie section of the FroodStobie mine is a two-shaft installation designed to handle a daily production of 18,000 tons of ore at depth. The two vertical shafts are within 10

    Jan 1, 1956

  • AIME
    Hoisting Equipment at Utah Apex Mining Co.

    By J. A. Norden

    MUCH has been written concerning the hoisting equipment of various mines -throughout the country, but most of the literature on the subject, if not all, describes equipment of extraordinary capacity a

    Jan 8, 1920

  • CIM
    Hoisting Rope Research in Ontario Mines

    By R. E. Dye

    Introduction Research concerning all phases of hoisting practice, but more particularly the causes and prevention of hoisting rope deterioration and the improvement of safety dogs 158 for shaft con

    Jan 1, 1948

  • NIOSH
    Hoisting Systems

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    7. Hoisting Systems Hoists used solely for emergency escape use should above all, be simple and dependable. The hoist systems' motive power should be independent of all other mine equipment so

    Jan 1, 1976

  • SME
    Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)

    By Christopher J. Bise

    INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by

    Jan 1, 1986

  • AIME
    Hoisting Systems At Ozark Lead Co.

    By M. C. Young

    The Ozark Lead Company operating facilities are located in Reynolds County at the south end of the "New Lead Belt" of southeast Missouri. Development of this wholly owned subsidiary of Kennecott Coppe

    Jan 1, 1975

  • AUSIMM
    Hoisting Technology ù Going to New Capacities and Depths

    Drum winders have now been built to attain depths of 3000 m and more in a single lift in accordance with the South African Code of Practice SABS 0294, which was introduced at the time of the last hois

    Jan 1, 2005

  • SME
    Holden Mine — Application of Jet Grouting to Improve Stability of a Tailings Embankment in a Narrow Mountain Valley

    By P. Crouse, J. Obermeyer

    "INTRODUCTION Site location and history The Holden Mine is a former underground copper mine that was developed and operated by the Howe Sound Mining Company (Howe Sound) from 1938 to 1957. The mine is

    Jan 1, 2017

  • SME
    Holding Back the Bay: Performance of Jet Grout in Hydraulically Placed Fills - NAT2024

    By Roger Escoda Estelrich, Joan Carles Casado Ortega, Mitchell Gerdau, Jose Raul Martinez, Jeb Pittsinger, Frank Perrone

    The existing Chesapeake Bay Bridge-Tunnel complex is being expanded to include the Parallel Thimble Shoal Tunnel. This will be a subaqueous bored crossing between two islands constructed for the origi

    Jun 23, 2024

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • ISEE
    Hole Diameter: Does it Affect Vibration Attenuation?

    By Tyler Acorn, Paul Worsey, Nathan Rouse

    The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr

    Jan 1, 2013

  • IMPC
    Holistic Approach On ?Sustainable Growth? Of Mineral Processing Industries

    By T. C. Rao

    This presentation identifies how mineral (coal included) processing profession should look at the challenges (threats) being faced by mineral industry. Presently, the focus is more on supply and deman

    Sep 1, 2012

  • AUSIMM
    Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving Mine

    By M Wimmer

    LKAB operates two underground iron ore mines located in the northern part of Sweden, both using sublevel caving (SLC) as the mining method. Knowledge of the mechanisms of gravity flow is important sin

    May 9, 2016

  • AUSIMM
    Holistic Management of Sulfides at Rio Tinto Iron Ore's Pilbara Mine Sites

    Rio Tinto Iron Ore (RTIO) manages eleven mines in the Pilbara region, Western Australia. Three of these mines have previously or are currently mining black shale that contains varying amounts of pyrit

    Jan 1, 2009

  • SME
    Holistic planning and approval of sustainable lignite mining and utilization

    By L. Kulik, J. den Drijver

    Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n

    Jan 1, 2011

  • ISEE
    Holistic scientific approach to address wall damage and berm loss from blasting in large open cut metal mines

    By Tapan Goswami, Stephen Jeric, Geoff Brent

    Highwall failures in large deep open cut mines have very significant safety and commercial implications. There are many factors influencing the stability of highwalls. The major influence is the inter

    Jan 1, 2011

  • DFI
    Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground Station

    By Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth

    In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a

    May 1, 2022

  • CIM
    Hollinger Shaft Practice

    By V. J. Southey

    HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s

    Jan 1, 1939

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008